07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controiled road matters 2. The application involves: (tick applicable boxes)
Far mora information refer to Guide 3 (1 () development on land contiguous’ to a State controlled road and for -
Uniess you answered “none of the above” to Q2, . . .
the application triggers referral to the Department C1 (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referal agency (CO (b) reconfiguring a lot unless -
bassdiliciaiiies saeeeilitalen ai + the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controfled road is not increased;
Schedule 2 of the IP Requtation will assist you to . . . . .
determina where DMRis an advice or 'c) operational work (not associated witha material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a jot mentioned in (b) above)—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the tand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
( (ii) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
assessable against the tocal government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
L (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)—
¢ assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
mMiiy none of the above
Clearing vegetation 3. The application involves: (tick applicable boxes)
For more information refer to Guide 12. C1()_ material change of use -
“none of , . .
een ar ete oeecomeattyne. 3%. (a) assessable against the planning scheme;
nae ral and W (b) on a lot containing -
if an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a ; « if there is no property map of assessable vegetation for the lot - remnant vegetation;
porcurrence agency forthe appicaton in elation (c)_ where the existing use of the land is a rural or environmental use; and
If you ticked 034i) or (i), your application requires; (d)_ where the size of the land is 2 hectares or larger - compiete Part J of Form 1
feferral to NRW for assessment regardless of D(ii) reconfiguring a fot -
whether vegetation clearing is proposed of not. _.
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Di {iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
if you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
if you ticked (ii) Queensland Transport is a
concurrence agency for the application.
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
O (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
[M(il) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m af the State-controlied road; or that is part of a future State-
contolled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file