Attachment F - Geotechnical Report · 142007.743.04

of 12

Text shows just the words. Original shows the document exactly as it was published.

4 September 2023                                                                       J002100-001-L-Rev0

Tim & Lidia McNamara

Email: [email protected]

SLOPE STABILITY ASSESSMENT
PROPOSED SWIMMING POOLS – 36 VENTURA STREET, SUNRISE BEACH

Dear Tim,
At your request, Core Consultants Pty Ltd (Core) has undertaken a slope stability assessment for proposed
swimming pools at the above site. Our assessment was based on a review of available information and a
walk-over survey (including insitu soil testing).

This report presents the results of our desk study and site observations/testing, together with our slope
stability assessment and recommendations.

Site Description & Proposed Development
The property is described as Lot 1 (Unit 1) and Lot 2 (Unit 2) on SP236316, covering a combined area of
608 m2. Image 1 below presents an aerial view of the site. The existing carpark and duplex residences cover
most of the site, with proposed pools to be located at the rear (east) of the lots (refer Image 2 below). A
detailed description of the site is given in the following sections. Photographs 1 and 2 show the general site
conditions at the time of our walkover on 25 August 2023.

The proposed works comprise the construction of two pools, one at the rear of each lot (unit). Earthworks are
expected to comprise mostly excavations for the pools. Some filling of up to about 0.5 m high is also
expected to form paved areas around the pools. The lot is connected to council water supply, sewerage, and
stormwater systems.




Image 1: Aerial view of site (courtesy Noosa Council [NC] on-line Public Mapping System)
Full text of the other 11 pages

Page 2

J002100-001-L-Rev0
4 September 2023




                      DCP2




                      DCP1




Image 2: Layout of proposed pools (Bright Building Design Dwg No. 02, Job No. 22.015) & DCP test locations




Photograph 1: Site conditions at Unit 1 (looking southwest)




Photograph 2: Site conditions at Unit 2 (looking southwest)




                                                       2

Page 3

J002100-001-L-Rev0
4 September 2023


Method and Scope of Investigation
As part of our slope stability assessment, a desktop study was carried out comprising a review of published
geological maps of the area and NC online mapping. No site specific soil test had been carried out at the
time of reporting.
Following the desktop study, a walkover survey was conducted to make an appraisal of the general condition
of the site, including assessment of existing nearby structures, earthworks, topography, drainage, vegetation
cover, geology, erosion and slope stability. The walkover survey was carried out by an experienced
geotechnical engineer from Core on 25 August 2023. Two dynamic cone penetrometer (DCP) tests were
also carried out during the site walk-over.
The results of the desktop study and walkover survey are given below.

RESULTS OF ASSESSMENT
Geology
The Queensland Geotechnical Database (QGD) indicates that the site geology comprises the recent
Pleistocene age “Quartz sand; parabolic sand dunes” (Qpd/1). An extract from the QGD geology map is
shown below in Image 3.




                                                                          Site




                              Qpd/1




Image 3: Extract from QGD Geology map1

A soil test had not been carried out prior to our site visit. However, Core carried out two DCP tests (DCP1
and DCP2) to depths of 2.4 m and 2.9 m below ground level (BGL), respectively at the locations of the
proposed pools (refer Image 2 above). Results are attached in Table 1 below and indicate loose sand to
about 0.3 m to 0.6 m BGL, then medium dense, becoming dense from depths of about 1.2 m to 2.2 m BGL
continuing to test termination.

Pale grey/grey sand was observed at the ground surface and along nearby road cuttings.




                                                      3

Page 4

J002100-001-L-Rev0
4 September 2023


Table 1: DCP test results


                                   Blows per 100 mm penetration
   Depth
  (m, BGL)
                            DCP1                              DCP2
   0.0-0.1                   1                                    1
   0.1-0.2                   2                                    2
   0.2-0.3                   3                                    2
   0.3-0.4                   2                                    2
   0.4-0.5                   3                                    1
   0.5-0.6                   3                                    2
   0.6-0.7                   3                                    3
   0.7-0.8                   3                                    3
   0.8-0.9                   4                                    3
   0.9-1.0                   4                                    3
   1.0-1.1                   3                                    3
   1.1-1.2                   4                                    2
   1.2-1.3                   5                                    3
   1.3-1.4                   5                                    4
   1.4-1.5                   5                                    3
   1.5-1.6                   7                                    4
   1.6-1.7                   6                                    3
   1.7-1.8                   6                                    4
   1.8-1.9                   5                                    4
   1.9-2.0                   6                                    4
   2.0-2.1                   5                                    4
   2.2-2.2                   7                                    5
   2.2-2.3                   7                                    5
   2.3-2.4                   8                                    6
   2.4-2.5                   -                                    6
   2.5-2.6                   -                                    5
   2.6-2.7                   -                                    6
   2.7-2.8                   -                                    7
   2.8-2.9                   -                                    7

Existing Structures
The existing structure on site is a single and two level duplex building comprising rendered lightweight board
cladding with a block partition wall between the units (refer Photograph 3 below).

A large manhole was noted on the adjacent lot to the south, however, NC and Unitywater records do not
indicate that either a stormwater or sewer line runs along the rear of the subject site (refer Photograph 4).

All existing nearby structures appeared to be in good structural condition, with no obvious damage visible on
the exterior that may be attributable to slope movement (e.g., no cracking in house walls or concrete
driveway).




                                                        4

Page 5

J002100-001-L-Rev0
4 September 2023




Photograph 3: Front of existing units (looking from Ventura Street)




 #36
 (Unit 2)




Photograph 4: Stormwater or sewer manhole at northeast corner of adjacent lot

Topography

The site is located on the northeastern flank of a knoll that has a high point about 250 m to the southwest of
the site. The natural ground surface continues to fall across David Low Way towards a drainage channel to
the north-east. Natural ground slopes have been altered due to cut/fill earthworks for houses and roads
(refer Image 4).

Ground slopes recorded using a handheld clinometer are less than 3° across the proposed pool areas, and
for about 2 m to 3 m beyond the rear fence, where the slope steepens to about 22° along the cut bank down
to David Low Way (refer Photograph 5).




                                                        5

Page 6

J002100-001-L-Rev0
4 September 2023




Image 4: Topographic setting (1m contours; extract from NC on-line Public Mapping System)




Photograph 5: Cut bank down to David Low Way beyond the rear (east) of the site




                                                      6

Page 7

J002100-001-L-Rev0
4 September 2023


Groundwater
No signs of groundwater or seepage were noted during our site walkover.

Surface Drainage
Based on observations of the ground conditions during the walk-over, the site is considered to be well
drained as expected, having a permeable dune sand profile.

Future site drainage from structures is expected to be directed towards the existing stormwater pits located
in the rear corners of the lot, which are then connected to the council stormwater system.

Vegetation
The proposed pool areas comprise short grass, with some trees more than 3 m high located along the
boundary lines and on the sloping bank just outside the rear boundaries (refer Photograph 5 above).
ASSESSMENT & RECOMMENDATIONS
Existing Conditions
The lot is mapped on the NC Landslide Hazard Overlay (susceptibility) as having area of Moderate and High
hazard at the rear of the site (refer Image 5). As the site is relatively flat, it appears that the Moderate and
High hazard ratings are associated with the cut batter along the western side of David Low Way, just east of
the rear site boundaries.




Image 5: Extract from NC Landslide Hazard Overlay.
Stability Assessment
The risk assessment has been carried out following the Australian Geomechanics Society ‘Landslide Risk
Management Guidelines’ (AGS 2007). Relative levels of risk and their implications are given in Table 2
below and the Qualitative Terminology for Use in Assessing Risk to Property is attached in Appendix B.




                                                       7

Page 8

J002100-001-L-Rev0
4 September 2023


Table 2: Stability Risk Levels
 Risk Level                Example Implications

                              Unacceptable without treatment. Extensive detailed investigation and research, planning
          VERY HIGH
 VH                           and implementation of treatment options essential to reduce risk to Low; may be too
          RISK
                              expensive and not practical. Work likely to cost more than value of property.

                              Unacceptable without treatment. Detailed investigation, planning and implementation of
 H        HIGH RISK           treatment options required to reduce risk to Low. Work would cost a substantial sum in
                              relation to the value of the property.

                              May be tolerated in certain circumstances (subject to regulators’ approval) but requires
          MODERATE
 M                            investigation, planning and implementation of treatment options to reduce risk to Low.
          RISK
                              Treatment options to reduce to Low risk should be implemented as soon as practicable.

                              Usually acceptable to regulators. Where treatment has been required to reduce the risk to
 L        LOW RISK
                              this level, ongoing maintenance required.

          VERY LOW
 VL                           Acceptable. Manage by normal slope maintenance procedures.
          RISK

 Note:   1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
 depend on the nature of the property at risk; these are only given as a general guide.


With reference to the qualitative measures of likelihood and consequence given in the attachment Qualitative
Terminology for Use in Assessing Risk to Property, failure of the cut batter along David Low Way is
assessed as Rare. (i.e. the event is conceivable but only under exceptional circumstances over the design
life). The Consequence to Property (residence and pool) of such an event occurring is assessed to be
Medium (i.e. moderate damage to the pool and/or significant part of the site requiring large stabilisation
works). A combination of these measures in the risk matrix results in a property risk classification of Low.

The assessment of Rare is based on the lack of evidence of past movement (no damage to existing road
pavement or kerb/channel); the site geology and slope (medium dense to dense sand; nearly flat site and cut
batter about 22°); and the relatively good drainage across the site and surrounds.

This level of risk is generally acceptable to regulators (i.e. NC) provided the recommendations given below
are followed.
To maintain a ‘Low’ risk classification, the following measures must be implemented for future construction:

     Temporary cut batters are to be no steeper than 1V:1H. If loose sand or groundwater is encountered,
      temporary dewatering and flatter batters will be required (e.g. up to 1V:3H). If required setbacks cannot
      be achieved due to the proximity of site boundaries or existing structures, some form of temporary
      retaining will be required.

     Surface drainage measures must be installed to direct stormwater flow away from the pool (and
      residence) towards a legal point of discharge (e.g. stormwater drains at rear of lot).




                                                            8

Page 9

J002100-001-L-Rev0
4 September 2023


LIMITATIONS
Your attention is drawn to the document Limitations, which is attached.

Please contact the undersigned should you wish to discuss any of the above matters.
Yours sincerely,
CORE CONSULTANTS PTY LTD




Darryn Quinn                                                Simon Maggiora
BE(Geological) MIEAust RPEQ 7602                            BE(Civil) CPEng NER RPEQ 12467
Principal Geotechnical Engineer                             Principal Geotechnical Engineer


DQ/SM/dq


Attachments:       Qualitative Terminology for Use in Assessing Risk to Property
                   Limitations




                                                        9

Page 10

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


   91                                                          Australian Geomechanics Vol 42 No 1 March 2007

Page 11

                                        PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                      LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                           Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                          Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                              Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                              10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                     -2
B -    LIKELY                                      10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                    10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                    10-4                           H                         M                        L                       L                      VL
                                                     -5
E -    RARE                                        10                             M                          L                       L                      VL                      VL
                                                     -6
F -    BARELY CREDIBLE                             10                             L                         VL                      VL                      VL                      VL
      Notes:    (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
                (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                      time.


      RISK LEVEL IMPLICATIONS
                         Risk Level                                                                                  Example Implications (7)
                                                                  Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
           VH                    VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                  property.
                                                                  Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
           H                          HIGH RISK
                                                                  risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                  May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
           M                     MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                  implemented as soon as practicable.
                                                                  Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
           L                          LOW RISK
                                                                  required.
                                                                  Acceptable. Manage by normal slope maintenance procedures.
           VL                     VERY LOW RISK

       Note:    (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                      given as a general guide.




      92                         Australian Geomechanics Vol 42 No 1 March 2007

Page 12

                                             LIMITATIONS

This Document has been provided by Core Consultants Pty Ltd (“Core”) subject to the following
limitations:

This Document has been prepared for the particular purpose outlined in Core’s proposal and no
responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for
any other purpose.

The scope and the period of Core’s Services are as described in C o r e ’s proposal, and are
subject to restrictions and limitations. Core did not perform a complete assessment of all possible
conditions or circumstances that may exist at the site referenced in the Document. If a service
is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not
assume that any determination has been made by Core in regards to it.

Conditions may exist which were undetectable given the limited nature of the enquiry Core was
retained to undertake with respect to the site. Variations in conditions may occur between
investigatory locations, and there may be special conditions pertaining to the site which have not
been revealed by the investigation and which have not therefore been taken into account in
the Document. Accordingly, additional studies and actions may be required.

In addition, it is recognised that the passage of time affects the information and assessment provided
in this Document. Core’s opinions are based upon information that existed at the time of the
production of the Document. It is understood that the Services provided allowed Core to form no
more than an opinion of the actual conditions of the site at the time the site was visited and cannot
be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings,
or any laws or regulations.

Any assessments made in this Document are based on the conditions indicated from published
sources and the investigation described. No warranty is included, either express or implied, that
the actual conditions will conform exactly to the assessments contained in this Document.

Where data supplied by the client or other external sources, including previous site investigation
data, have been used, it has been assumed that the information is correct unless otherwise stated.
No responsibility is accepted by Core for incomplete or inaccurate data supplied by others.

Core may have retained subconsultants affiliated with Core to provide Services for the benefit of
Core. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have
any direct legal recourse to, and waives any claim, demand, or cause of action against, Core’s
affiliated companies, and their employees, officers and directors.

This Document is provided for sole use by the Client and is confidential to it and its professional
advisers. No responsibility whatsoever for the contents of this Document will be accepted to any
person other than the Client. Any use which a third party makes of this Document, or any reliance
on or decisions to be made based on it, is the responsibility of such third parties. Core accepts no
responsibility for damages, if any, suffered by any third party as a result of decisions made or
actions based on this Document.




Limitations                                Page 1 of 1                                   Date: 12/07/2018
FRM-065                             Uncontrolled When Printed                                  Issue: 1.02

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment F - Geotechnical Report.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.