                                              Officer:            Daniel Smith
                                              Direct Telephone:   (07) 5449 5106
                                              Response Address:   PO Box 141, Tewantin QLD 4565
                                              Email:              [email protected]
                                              Our Reference:      23618 DA
                                              Your Reference:
9 July 2008

Mr Ian Morton
PO Box 2154
NOOSA HEADS QLD 4567




Dear Sir

                          Change to an Existing Approval
                                    Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 9 July 2008 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:                23618 DA
    Street address:                21 Elanda Street, Sunshine Beach
    Real property description:     Lot 187 RP 48113
    Planning Scheme:               The Noosa Plan

2        DECISION DETAILS
Council on 20 May 2004 decided to issue the following type of approval: -
     Development Permit for Material Change of Use - Duplex Dwelling
In relation to the request to make a change to the existing approval, Council on 9 July 2008 decided
to:
A.       Approve the request to extend the currency period by an additional 4 years
B.       Approve a change to Condition 17
C.       Include an additional condition
D.       Issue a Change to an Existing Approval

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                           Page 1 of 11
Full text of the other 10 pages

Page 2

                                                                                     2003/221135


4     ASSESSMENT MANAGER CONDITIONS

1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are numbered 0306 TP1.03D, 0306
      TP1.04B, 0306 TP2.01C, 0306 TP3.01C and 0306 TP4.01A prepared by Peter Conley &
      Associates and dated October 2003 and as may be amended by these conditions.
2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Any fencing provided in conjunction with the development is to be setback 1 metre to any road
      frontage, with at least half the total length of fencing setback 2 metres or more. Dense
      landscaping is to be implemented in front of any fencing facing Eland Street to assist in
      screening the its visual prominence to this roadway.
4.    The open space and setback areas are to be landscaped in accordance with Council’s Policy
      on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
      be completed prior to the premises being occupied and maintained at all times thereafter.
5.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. Specifically, the
      existing trees located within the front 6 metre landscaped setback are to be retained in
      accordance with plan 0306 TP1.03D, prepared by Peter Conley & Associates and dated
      October 2003. The landscape plans referred to above are to denote areas of existing
      vegetation to be retained.
6.    Dense landscaping is to be provided along the Elanda Street frontage and road reserve,
      including a diverse range of trees (25 – 45 Litre) and understorey plantings to minimise the
      visual prominence of the development. This vegetation will be chosen from the preferred plant
      species list as nominated in the Landscaping Guidelines, Planning Scheme Policy 1.
7.    The owners will be responsible for the maintenance of the landscaping within the road
      reserve. All landscaping is to maintained to a suitable standard to the reasonable satisfaction
      of the Manager – Land Use and shall be undertaken by a suitably qualified person.
8.    The driveway / manoeuvring area, opposite the proposed 2 x double garages, shall be setback
      from the northern property boundary to enable a 0.5 metre minimum width landscaped strip to
      run along the entire length of the northern boundary. Landscaping is to consist of a mixture of
      native trees species (at 2.0 metre centres), with understorey planting, to achieve a visual
      buffer to the adjoining property. The only area of exclusion along this boundary is the pathway
      located within the front 6 metre setback in accordance with the plan 0306TP1.03D, prepared
      by Peter Conley & Associates and dated October 2003.
9.    A 1.5 metre landscaped garden bed is to be provided along the full length of the southern
      boundary, with the exception of the front deck and pool area in accordance with the plan 0306
      TP1.03D, prepared by Peter Conley & Associates and dated October 2003.
      Landscaping is to consist of a mixture of native trees species (at 2.0 metre centres), with
      understorey planting, to achieve a visual buffer to the adjoining property. Consequently, the
      water feature located next to the garage of Unit A, which extends out to this boundary will
      have to be reduced in order to comply with this condition.
10.   A 1.5 metre landscaped garden bed is to be provided along the full length of the rear
      boundary, that grows to a mature height of approximately 3 to 5, to assist in softening the
      visual prominence of the pool and deck area. Landscaping is to consist of a mixture of native
      trees species (at 2.0 metre centres) with understorey planting. The intent of this condition is to
      achieve a vegetated screen, but to still allow filtered views towards Sunshine Beach.


                                                                                      Page 2 of 11

Page 3

                                                                                     2003/221135


11.   The decking located within the 6.0 metre setback at the rear of the site is to be removed and
      the pool is to be lowered so that it does not exceed more than 1 metre above natural ground
      level.
12.   Any advertising sign or device is to comply with the provisions of Council's policies on
      advertising
13.   Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus
      remaining as open structures.
14.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow
      of 9 litres per min. Dishwashers and washing machines are excluded from this requirement.
15.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
16.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
17.   This development permit for a material change of use lapses if the use or erection of a building
      or other structure associated with the use, has not been commenced by 20 May 2012, unless
      application is made and approved by Council for an extension.
18.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for building works.
LAND DEVELOPMENT
Vehicle Access
19.   A vehicular access driveway to serve the development shall be constructed from the Elanda
      Street frontage of the site to a maximum width of 3.0 metres. The driveway shall be
      constructed to an alignment that avoids the existing trees located on the Council road reserve
      and shall conform to AS2890.1-1993.
20.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
      grades that do not comply with AS2890.1-1993 Council will require that the driveway be
      removed and reconstructed to levels that do comply.
21.   The Entry to Unit A and adjacent to Garage 1 shall be reduced in size (to be inline with the
      garages) to allow greater room for vehicle manoeuvring. This is particularly necessary for
      vehicles that have reversed from the western side of Garage 1 and are in a position to drive
      forward, but are restricted by this entry feature. In addition to this it may also be necessary to
      relocate the Laundry of Unit A so that this area can also be used for vehicle manoeuvring.
      Similar adjustments may also be necessary to the proposed landscaping feature within the
      driveway and running between Garage 1 and Garage 2.
22.   All vehicles shall enter and leave the site in a forward direction.
Carparking
23.   Carparking shall be provided within the site as shown on drawing number TP1.03, issue D,
      dated 11/04/04 by Peter Conley & Associates, except as modified herein.


                                                                                      Page 3 of 11

Page 4

                                                                                     2003/221135


24.   The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
      user class 3 with a minimum head clearance (headroom) at any point of 2.2m.
25.   A minimum of 4 covered carpark spaces shall be provided on site.
Vegetation Protection
26.   Any internal pavements within the drip zone of any of the existing trees or proposed trees on
      site shall be designed as a pervious pavement and constructed so as not to damage the tree
      or their root system in anyway whatsoever. In this regard, plans shall be submitted to the
      Council for approval that clearly show the type and extent of the pervious pavement prior to
      obtaining a Development Permit for Operational Works.
Roadworks Contributions
27.   A roadworks contribution of $1,024 towards the Coastal Major Road Network shall be paid to
      the Council prior to obtaining a Development Permit for Operational Works. This amount will
      be subject to variations in the Price Index, All Groups Brisbane from December 2003 until the
      date of payment.
Frontage Works
28.   Footpath improvements such as topsoiling, grassing, and tree planting to the frontage shall be
      in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be
      couch, free of weeds.
29.   A new 1.2 metre wide concrete path shall be constructed along the Elanda Street frontage of
      the site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services.
      The path shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.
30.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
31.   A pathway contribution of $238 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
      to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Price Index, All Groups Brisbane from December 2003 until the date of
      payment.
Stormwater Drainage
32.   As a minimum, there shall be no net increase in stormwater runoff from the site for storm
      events up to and including a 100 year Average Recurrence Interval (ARI). All other
      stormwater collected on site shall be discharge to Council’s street drainage system in Elanda
      Street, although on site retention and reuse of this water would be preferable.
      The maximum discharge of stormwater drainage allowable to Council’s street drainage system
      at any one location is 25 litres/second. Plans of the drainage design shall be prepared by a
      Registered Professional Civil Engineer and submitted to Council prior to obtaining a
      Development Permit for Operational Works.
33.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
      being permitted to discharge into Council’s drainage system.


                                                                                      Page 4 of 11

Page 5

                                                                                      2003/221135


      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.

      All other clean stormwater, such as roof water, can bypass the grease/oil arrestor.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
34.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
35.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
36.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
37.   Each water connection to the water reticulation system shall extend to the property boundary
      and be metered. Where multiple units are served by a single service, multiple water meters to
      each individual unit shall be installed. All fees for the supply of water meters shall be paid to
      the Council.
Headworks
38.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
      Contributions respectively and at the rates applicable at the time of payment. An estimate
      only of the contribution rates as of December 2003 under the current policies is as follows:
      Water Supply        $ 4,109
      Sewerage            $ 2,806
      TOTAL               $ 6,915

      All headworks contributions must be paid prior to the issue of a Development Permit for
      Operational Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      headworks contributions not be paid at the due time, Council shall call upon the trading bank
      guarantee in full.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
39.   Any filling works required on site shall be carried out in accordance with Section 3.8 of
      Council’s Engineering Design Standards Manual and so as not to cause the ponding of water
      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
40.   Any earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences that border the development site unless it is intended to replace such fences. In this
      regard any fences to be replaced shall be clearly shown on the plans submitted for
      Operational Works approval.




                                                                                      Page 5 of 11

Page 6

                                                                                    2003/221135


Site Stability
41.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures, and make recommendations on the type of
      foundation system(s) best suited for the proposed development. This information shall be
      submitted to the Council for assessment and approval prior to obtaining a Development Permit
      for Operational Works.
Erosion and Sediment Control
42.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.
General
43.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
44.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
45.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
46.   A Registered Professional Engineer of Queensland shall certify engineering drawings and
      specifications for all engineering works, which shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
BUILDING SERVICES
47.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height as shown on the approved plans.
48.   The side boundary setbacks of all elements of the building are to comply with the same
      setback provisions as are prescribed in Element 1, A2 of Part 12 of the Queensland
      Development Code for single detached houses.
49.   The plans submitted for a Development Permit for building works are to comply with the
      approved plans and the following requirements:-
      49.1 Any decks such as the pool deck, and the swimming pool itself, shall not be constructed
           at a height exceeding 1 metre above natural ground level within 1.5 metres of the side
           boundary or within 6 metres of the road boundary of the property.
ENVIRONMENTAL HEALTH
50.   The developer must provide a suitably screened imperviously external paved area large
      enough for all refuse and recycling containers.
51.   Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
      located in a manner which prevents a noise nuisance beyond the subject land in accordance
      with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
      fines apply for such offences.

                                                                                    Page 6 of 11

Page 7

                                                                                     2003/221135


52.    Air conditioning units shall be located in a manner which prevents noise nuisance beyond the
       subject land in accordance with the nuisance provisions of the Environmental Protection
       Regulation 1998. On the spot fines apply for such offences.
Additional Condition
1.     The roof top terraces are not approved. The plans submitted for operational works shall show
       that the roof top terraces have been deleted.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the Assessment
Managers conditions.

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
       the cost of operational works exceeds $80,000, then a portable long service levy is required to
       be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
       form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
       that confirms that the requirements of the Act have been satisfied. A statutory declaration
       outlining the cost of the operational works must be submitted to Council with the lodgement of
       any application for operational works over the site.
2.     The level difference between the two double garages of RL 52.00 (Garage 1 - Unit A) and RL
       52.50 (Garage 2 - Unit B) is not desirable to gain entry to these garages in the transitional
       zone. Though the driveway should work with these levels, the grade of the driveway will be at
       the absolute maximum (i.e. quite steep for vehicles), which may cause low vehicles to scrape
       and or bottom. Given this, Council recommend a height difference of 0.3 metres between the
       garages would be a better solution.
3.     The Environmental Protection Regulation 1998 and Local Law No.12 prevents a builder or
       building contractor carrying out building work on a building site in a way that makes or causes
       audible noise to be made from the building work on:-
       (a)       Monday to Saturday, before 7:00am or after 6:30pm
       (b)       Sunday or public holiday, at any time.
       A maximum penalty of $1,500 applies to an offence under this legislation.
4.     In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
       cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
       it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
       course. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.

                                                                                     Page 7 of 11

Page 8

                                                                                        2003/221135


The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Development Permit for Building Works          Duplex Dwelling

 Development Permit for Operational             Landscaping, Access, Carparking, Site Civil Works,
 Works                                          Stormwater Drainage and Frontage Works

11    SELF ASSESSABLE CODES
Not applicable

12    SUBMISSIONS
There was one properly made submission about the application.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.




                                                                                        Page 8 of 11

Page 9

                                                 2003/221135


DECISION NOTICE HISTORY
 Original Decision Notice issued 20 May 2004.
 Changes to an Existing Approval issued 9
  July 2008 with amendment to Condition 17
  and inclusion of an additional condition.


Yours faithfully,



Kerri Coyle
SENIOR PLANNING OFFICER




                                                 Page 9 of 11

Page 10

                                                                                                2003/221135


                                                      Appeal Rights
                                                      INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                       (5) If an application is processed under section
Planning Act (Chapter 4).                                       6.1.28(2), appeal rights for submitters for the
                                                                application are available only for the aspects of the
Division 8 - Appeals to court relating to                       development that would have required public
development applications                                        notification under the repealed Act.
Appeals by applicants                                                 (6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application           concurrence agency code, appeal rights for
may appeal to the court against any of the following-           submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development       the part of the approval that represents the
    application;                                                concurrence agency’s response for the code.
(b) a matter stated in a development approval,                  Appeals by advice agency submitters
    including any condition applying to the                     4.1.29.(1) An advice agency may, within the limits of
    development, and the identification of a code               its jurisdiction, appeal to the court about the giving of
                          1
    under section 3.1.6;                                        a development approval for a development
(c) the decision to give a preliminary approval when a          application if-
    development permit was applied for;                         (a) the development application involves impact
(d) the length of a currency period;                                  assessment; and
(e) a deemed refusal.                                           (b) the advice agency told the applicant and the
                                                                      assessment manager to treat its response to the
    (2) An appeal under subsection (1)(a) to (d) must                 application as a submission for an appeal.
be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or                  (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant.           days after the day the decision notice or negotiated
                                                                decision notice is given to the advice agency as a
    (3) An appeal under subsection (1)(e) may be                submitter.
started at any time after the last day a decision on the
matter should have been made.                                   Appeals for matters arising after approval given
                                                                (co-respondents)
Appeals by submitters
                                                                4.1.30.(1) For a development approval given for a
4.1.28.(1) A submitter for a development application            development application, a person to whom any of the
may appeal to the court about-                                  following notices have been given may appeal to the
(a) the giving of a development approval, including             court against the decision in the notice-
    any conditions (or lack of conditions) or other             (a) a notice giving a decision on a request for
    provisions of the approval; or                                    extension of the currency period for an approval;
(b) the length of a currency period for the approval.           (b) a notice giving a decision on a request to make a
    (2) The appeal must be started within 20 business                 minor change to an approval.
days (the “submitters appeal period”) after the day                   (2) The appeal must be started within 20 business
the decision notice or negotiated decision notice is            days after the day the notice of the decision is given
given to the submitter.                                         to the person.
    (3) If a person withdraws a submission before the                 (3) Subsection (1)(a) does not apply if the
application is decided, the person may not appeal the           approval resulted from a development application
decision.                                                       (superseded planning scheme) that was assessed as
    (4) If an application involves both impact                  if it were an application under a superseded planning
assessment and code assessment, appeal rights for               scheme.
submitters are available only for the part of the                     (4) Also, a person who has made a request
application involving impact assessment.                        mentioned in subsection (1) may appeal to the court
                                                                against a deemed refusal of the request.
                                                                      (5) An appeal under subsection (4) may be started
1                                                               at any time after the last day the decision on the
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)                                        matter should have been made.
                                                                                               Page 10 of 11

Page 11

                                                                                           2003/221135


Division 9 - Appeals to court about other matters          Appeals by applicants
Appeals for matters arising after approval given           4.2.9(1) An applicant for a development application
(no co-respondents)                                        may appeal to the Building and Development Tribunal
4.1.31.(1) A person to whom any of the following           against any of the following-
notices have been given may appeal to the court            (a) the refusal, or the refusal in part, of a development
against the decision in the notice-                            application;
(a) a notice giving a decision on a request to change      (b) a matter stated in a development approval,
    or cancel a condition of a development approval.           including any condition applying to the
                                   2
(b) a notice under section 6.1.44 giving a decision to         development, and the identification of a code
                                                                                     3
    change or cancel a condition of a development              under section 3.1.6;
    approval.                                              (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20 business          development permit was applied for;
        days after the day the notice of the decision is   (d) the length of a period mentioned in section 3.5.21
        given to the person.                                   currency period;
    (3) Also, a person who has made a request              (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal to           (2) An appeal under subsection (1)(a) to (d) must
        the court against a deemed refusal of the          be started within 20 business days (the “applicant’s
        request.                                           appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be started      negotiated decision notice is given to the applicant.
        at any time after the last day the decision on         (3) An appeal under subsection (1)(e) may be
        the matter should have been made.                  started at any time after the last day a decision on the
Appeals against decisions to change approval               matter should have been made.
conditions under the repealed Act                          The Registrar for the Building and Development
4.1.33A.(1) A person who is dissatisfied with a            Tribunal may be contacted at the website
decision made on an application to change the              http://www.localgovernment.qld.gov.au/
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications


2
     Section 6.1.44 (Conditions may be changed or
                                                           3
    cancelled by assessment manager or concurrence             Section 3.1.6 (Preliminary approval may override local
    agency in certain circumstances)                           planning instrument)
                                                                                          Page 11 of 11

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2003.00221135.002 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.