Original source · versioned page text
Approved Plan OPW20-0132
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EXISTING PROPERTY BOUNDARY CAUTION
EXISTING TELSTRA
CABLES
2
-
2 PROPERTY DESCRIPTION
-
Lot 63 on SP52918
BUILDING OVER
EXISTING KERB &
CHANNEL LEGEND
ER
1
F OV
PROPOSED DRIVEWAY
BASEMENT -
ARY
ROO
FFL 44.05 PROPOSED DRIVEWAY CROSS-OVER
UND
Y BO
PROPOSED DRIVEWAY LEVELS
T
PER
1
-
PRO
ING
PROPOSED DRIVEWAY CROSSOVER; IN
T
ACCORDANCE WITH COUNCIL STD
EXIS
DRAWING RS-051 & RS 049
LEGEND
DRIVEWAY LAYOUT PLAN
1:100 (A3) EXISTING WATERMAIN
EXISTING STORMWATER
0.409m EXISTING SEWER
2.322m 9.793m 1.800m 1.500m 2.000m EXISTING TELSTRA
EXISTING ELECTRICITY
1.624m
RL
46 RL
EX BDY
RL .97 RL R
46 46 46 L46
RL .79 5 .93 .77 .72
4 6 -1:40 8 ALLAMBI RISE
6.3 1:10 -1:9.25 7 7
90
EXISTING KERB & CHANNEL
RL CONCRETE PAVEMENT RECONSTRUCT TO IPWEAQ
44 1:4 RS-049 CROSSOVER DETAIL
RL RL4 .34
44 4 8
.05 .050
BASEMENT RL44.050 0 1:8
1
A DRIVEWAY LONGITUDINAL SECTION - SOUTHERN SIDE
-
EW01 1:100 (A3)
0.884m
1.800m 10.845m 2.000m 1.500m 2.031m
1.506m
RL
RL 46 RL RL
.67 46 46
46
EX BDY
RL .47 5 .6 .45
46 6 -1:40 38 -1:12.36 6 ALLAMBI RISE
.1 1:10
73
1:4.96 EXISTING KERB & CHANNEL
RL
44 RECONSTRUCT TO IPWEAQ
RL RL .29 -
RS-049 CROSSOVER DETAIL
NOOSA COUNCIL
44 44 0
.05 .05 CONCRETE PAVEMENT
BASEMENT RL44.050 0 0 1:8
APPROVED PLAN
OPW20/0132 11 MAY 2021
A
2 DRIVEWAY LONGITUDINAL SECTION - NORTHERN SIDE
-
EW01 1:100 (A3)
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED
1486
A 15-06-2020 ORIGINAL ISSUE LN CL
DATUM AHD SHEET: 1 OF 1
0 1.0 2.0 3.0 4.0 5.0m
DESIGN LN ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN LN Director: CAMERON LANDRETH
SCALE 1:100 A3
DESIGN CHECK CL (RPEQ 19358) 07 5443 8285
R01 A
[email protected] www.barlowshelley.com.au
This drawing is not to be copied or amended without written permission from
DATE 15 - 06 - 20 Barlow Shelley Consulting Engineers PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.