Original source · versioned page text
DA_Pomona
Design PO12 compliance: The proposal’s relative small size compared with dwellings and structures existing in its surrounds mean that it will not be a major stand out in the immediate context. There are no large walls and the majority of equipment is below the top of the mount for the satellite dish which is 1.8 metres high. PO13: No garage or carport is associated with the proposal. PO14: No basement is associated with the proposal. PO15 compliance: Existing driveway access exists and there is plenty of area for vehicle manoeuvering. PO16: No roof is associated with the proposal. Safety and amenity PO17 compliance: The proposal includes fencing which will ensure the site’s safety and will not impede existing openness of the surrounds. Lighting is not required. PO18: Not a sports court. Environment, heritage and scenic amenity PO19 compliance: Erosion and sediment controls will be implemented prior to the commencement of any construction works and will be maintained throughout the construction phase to manage potential run off, water and air quality during construction. PO20 compliance: the proposal is not on a sloping site. Earthworks and drainage PO21 compliance: The proposal will immediately reinstate all sediment that is temporarily extracted to install the required structural footings. No external soil or sediment will be introduced to the existing vegetation. 4.3.1.2 Bushfire Overlay The facility will be located in the Bushfire Overlay – Potential Impact Buffer. The purpose of the Bushfire Hazard overlay code is to ensure that development avoids or mitigates the potential adverse impacts of bushfire on people, property, economic activity and the environment. The proposed facility will be located in an existing Telstra lot in the south west corner, with the majority of the facility actually outside of the overlay area. Figure 4 shows the proposal’s location within the context of the bushfire overlay. Given the location near the edge of the marked overlay area and for the avoidance of any doubt, compliance is show in the below table. Table 8.2.3.3 Performance outcomes and acceptable outcomes for assessable development Safety of people and property PO1 compliance: The proposal will not add any further risk to the existing fire danger. Communications infrastructure adds an additional safety layer for usage in a time of disaster such as during a bushfire event. Impacts on Ecologically Important Areas PO2 compliance: Due to the small scale of the proposal and its location on a previous cleared lot, there is no impact on areas of ecological importance. Water Supply for Fire Fighting Purposes PO3 compliance: Water supply will not be impacted by the proposal. Essential Community Infrastructure PO4 compliance: The proposal is defined as essential community infrastructure (as it is a communications facility) and will be utilised during and immediately after bushfire events. Page | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.