GENERAL NOTES:
REFER SITE-SPECIFIC DRAWINGS FOR SET-OUT DIMENSIONS COMPLIANCE BOX GENERAL
A COMPLETED AS PER DESIGN G1. THIS DRAWING TO BE READ IN CONJUNCTION WITH SITE-SPECIFIC DRAWINGS. A
G2. FOR GENERAL CONSTRUCTION & FABRICATION NOTES REFER TO TELSTRA STANDARD
ALTERATIONS IN RED
NAME (PRINT)
DRAWING 017866P05.
PEDESTAL 'A'. G3. FOOTINGS TO BE FOUNDED ON UNDISTURBED, NATURALLY CONSOLIDATED SOIL WITH
SIGNATURE DATE
REFER DETAIL MINIMUM ALLOWABLE VERTICAL BEARING CAPACITY 100kPa (U.N.O). A SUITABLY
EXPERIENCED PERSON SHALL CONFIRM THE BEARING CAPACITY ON-SITE PRIOR TO
INSTALLING THE CONCRETE/EQUIPMENT.
G4. BASE OF EXCAVATION SHALL BE CLEAN, FLAT & FREE OF SOFT/ORGANIC MATERIAL.
G5. SUBGRADE OF CRUSHED AGGREGATE OR ROAD BASE SHALL BE USED AS NECESSARY
TO ACHIEVE THE BEARING CAPACITY REQUIREMENT.
G6. CONCRETE AT TOP OF POLE MUST BE LEVEL AND NOT PROTRUDING FROM TOP SO AS
MOON FOOT NOT TO INTERFERE WITH MOUNTING OF DISH.
B PLATFORM. REFER PEDESTAL 'B'. G7. SAFE WORK PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE WITH LOCAL B
SHEET T2-1 REFER DETAIL MOUNTING POLE REGULATORY REQUIREMENTS & AS2159-2009.
Ø168.3 x 7.1 CHS
(GR350). REFER NOTE G6 CONCRETE
C1. CONCRETE WORKS TO BE COMPETED IN ACCORDANCE WITH AS3600-2018.
C2. CONCRETE STRENGTH TO BE MIN f'c = 32MPa AT 28 DAYS.
C3. COVER TO REINFORCEMENT TO BE MIN. 75mm (TYP ALL SIDES).
TYPICAL COMPOUND - PLAN VIEW C4. CAST-IN PROPRIETARY ITEMS TO BE INSTALLED TO MANUFACTURERS
SPECIFICATIONS.
SCALE 1:50
Ø1000 MOUNTING POLE CAST INTO FOOTING STEEL
1650
S1. STEELWORK TO BE FABRICATED IN ACCORDANCE WITH AS4100-2020.
C N12 x 450 LONG INSERTED THROUGH S2. ALL STEELWORK TO BE HOT DIP GALVANISED TO AS4680-2006 U.N.O. C
CHS TO PREVENT MAST ROTATION S3. ALL HOLLOW SECTIONS TO BE GRADE 350 TO AS1163-2016 U.N.O.
MASS CONCRETE FOOTING
A 1% FALL TOWARDS EDGES TYP.
- CRUSHED ROCK COMPOUND FINISH
3050
450 E.L. 0.0m
FINISHED GRADE HOLD-DOWN BOLT
CAGE CAST INTO
MASS CONCRETE FOOTING
FOOTING
D
PEDESTAL 'A' - PLAN VIEW D
SCALE 1:25 BACKFILL MOUNTING
SL72 MESH (ALL SIDES)
POLE WITH
1400
610 NOM.
CONCRETE CONCRETE PEDESTAL
385
(600 MIN.; 615 MAX.)
1530
HOLD-DOWN BOLT CAGE CAST INTO
E.L. 0.0m
FOOTING (DIMENSIONS TO BE
845
N12 x 450 LONG FINISHED GRADE
CONFIRMED) INSERTED THROUGH
460
CHS TO PREVENT
175 MAST ROTATION
305
REFER NOTES G3,
SL72 MESH (ALL SIDES)
130
G4 & G5
B
E -
CONCRETE PEDESTAL
SECTION A REFER NOTES G3,
G4 & G5
SECTION B E
SCALE 1:25 - SCALE 1:25 -
ORIENTATE HOLD-DOWN BOLTS
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2-1.
TO BE PARALLEL WITH UNISTRUT
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM RW FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE IB DP 18.06.21 0.1
SATELLITE ACCESS NODE SITE 183929
75 MAX.
25 MIN.
UNISTRUT (REFER SITE LAYOUT)
POMONA EXCHANGE
F CONCRETE FOUNDATION DETAILS F
25 RAILWAY PARADE, POMONA, QLD 4568
PEDESTAL 'B' - PLAN VIEW DWG SHT T2
SCALE 1:10 C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
The copyright and ownership of this drawing is assigned to Telstra and must not be copied or saved elsewhere without written permission from Telstra.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.