Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

DA_Pomona

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3.0 Scope of Works
The proposed scope of works is inclusive of the following:

    •      The installation of a 1.8 diameter dish mounted on a proposed 1.8m pole (Max structure
           height at 2.26m)
    •      Ancillary items include the installation of a moon foot platform with associated oan
           cabinet with an external aircon unit, cabling and fibre run, and a small fenced compound
           measured at 7620mm x 3660mm at a height of 1800mm to support the proposal.


3.1 Access to the Site

Access to the proposed site will be conducted through the existing access driveway off Railway
Parade. This is indicated on the proposed plans within Appendix A of this report. This route
enables direct access off a roadway which will repeal any disruptions to traffic flow for
construction vehicles during the build phase and any future required maintenance. The
available access is of sufficient size for vehicle manoeuvring. Traffic management will be
utilised during construction as necessary.

There is ample existing parking in the cleared area of site for vehicle activities during the
construction phase. Given the minor amount of traffic generated by the proposal (expected to
be 2 – 4 trips per year), it is not believed that any additional formal parking or manoeuvring
areas are required.

It should be highlighted that traditionally, telecommunications facilities do not require extensive
maintenance. Additionally, this proposal will not be a significant generator of vehicular and/or
pedestrian traffic.


3.2 Utilities

Indicatively, a power upgrade is required at the existing meter on the subject site which will
deliver power to the new proposed facility. A standard power application will be submitted for
approval and all new low voltage cable on the site will be installed underground.

The unmanned facility does not require access to water or sewer infrastructure. The proposal
will not alter stormwater runoff from the site, given the very minimal hardstand area.

The site does not require any additional permits for the connection of a sewer/roadway.


3.3 Construction Scheduling

Given the fairly unique nature of the proposed development, the development and construction
of the telecommunications facility primarily consists of the following processes:

   •    Remediation – ensuring that the land is suitable for construction. This is inclusive of
        confirming existing structural assessments and the provisioning of cabling;

   •    Installation of new equipment – reflective of the scope of works outlined within this
        Planning Permit Application; and

   •    Network Integration – Ensuring that the facility can connect with existing
        telecommunications infrastructure.


Page | 6
Log in to download the original file

DA_Pomona.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.