Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Attachment 2 - Operational Works Plans

Attached to the e-mail Complete - Response to Info Request MCU17 0563.msg.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                     1. GENERAL
                                                                                                                                                                                                                                                                                                                                                                                        (A) TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE DIVERTED AROUND
                                                                                                                                                                                                                                                                                                                                                                                             THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                                                                          ETRES                                                                                                                         (B) ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED IN
                                                           AT MAX. 2.5 M CENTRES
                                                                                                       SELF-SUPPORTING
                                                                                                                                                                                                                                        ID     TH 3 M
                                                                                                       GEOTEXTILE                                                                                                                 MIN. W                                                                                                                                                     ACCODANCE WITH I E AUST. SOIL EROSION AND SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                             MANUAL, AS DETAILED ON THIS PLAN, OR AS REQUIRED FOR COMPLIANCE
                                                                                                                                                                                                                                                                                                                                                                                             WITH THE REQUIREMENTS OF THE ENVIRONMENTALMANAGEMENT PLAN /
                                                                                                                                                                                                                                                                                                                                                                                             EROSION & SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                                                                                                                                                                                        (C) ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE OPERATIONAL
                                                        500 MM TO 600 MM                              DIRECTION OF                                                CONSTRUCTION SITE                                                         MIN.
                                                                                                                                                                                                                                                     LENG                                                                                                                                    BEFORE COMMENCING UP-SLOPE EARTHWORKS AND SHALL REMAIN IN
                                                                                                      FLOW                                                                                                                                                  TH 15                                                                                                                            PLACE UNTIL PERMANENT WORKS ARE COMPLETE AND CATCHMENT
                                                                                                                                                                                                                                                                    METR                                                                                                                     VEGETATION IS ESTABLISHED (60% GRASS COVER MINIMUM)
                                                                                                                                                                                                                                                                        ES
                                                                                                                                                                                                                                                                                                                                                                                        (D) THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT AND EROSION
                                                                                                                                                                                                                                                                                                                                                                                             CONTROL DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS
                                                                                                                                                                                      200 MM MIN.                                                                                                                                                                                                (1) DURING CONSTRUCTION & DEFECT LIABILITY PERIOD
                                                          600 MM MIN.                                                                                                                                                                                                                                                                                                                                (i) WEEKLY DURING DRY WEATHER
                                                                                                  ON SOIL, 150 MM X 100 MM
                                                                                                                                                                                                                                                                                                                   DARY                                                                              (ii) PRIOR TO PREDICTED STORM EVENTS
                                                                                                  TRENCH WITH COMPACTED                                                                                                                                                                                     BOUN
                                                                                                                                                                                                                                                                                                     ERTY                                                                                            (iii) TWICE DAILY DURING PROLONGEDE RAIN
                                                                                                  BACKFILL AND ON ROCK, SET                                                                                                                           300 MM MIN.                            PROP
                                                                                                  INTO SURFACE CONCRETE                                                                                                                                                                                                                                                                              (iv) DURING AND AFTER MAJOR STORM EVENTS
                                                                                                                                                                                                                                                                                                                                                                                        (E) ALL DISTURBED LAND MUST BE TREATED TO PREVENT RAIN DROP IMPACT
                                                                                                                                                                                                                                                                                                                                                                                             EROSION BY THE ESTABLISHMENT OF 60% EFFECTIVE GROUND COVER
                                                                              SECTION DETAIL                                                                                                                                                                                                                                                                                                 WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.
                                                                                                                                                                                                                                                                                                                                                                                        (F) IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
                                   DISTURBED AREA                                                                                                                                                                                                                                                                                                                                           SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
                                                                                                                                            RUNOFF DIRECTED TO                                                                                                                                                                                                                              BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED
                                                                                                                                            SEDIMENT TRAP/FENCE                                                                                                                                                                                                                             FOR MORE THAN 14 DAYS.
                                                              DIRECTION OF                                                                                                                                                                                                                                                                                                              (G) STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION WHICH
                                                                 FLOW                                                                                                                                                                                                                                                                                                                       GENERALLY SHOULD NOT BE USED IF OTHER OPTIONS ARE AVAILABLE.
                                                                                                                                                                                              DGB 20 ROADBASE OR
                                                                                               1.5 M STAR PICKETS
                                                                                                                                                                                              30 MM AGGREGATE                                                                                                                                                                         2. SEDIMENT CONTROL FENCE
                                                                                               AT MAX. 2.5 M CENTRES
                                                                                                                                                                                                                                                                                                                                                                                         (A) NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                                                                                                                                                                         (B) NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM
                                                                                                                                                                                                                                                                                EXISTING ROADWAY                                                                                              CATCHMENT AREA 0.6 HA PER 100M LENGTH OF FENCE.
                                                                                                                                                                                                            GEOTEXTILE FABRIC DESIGNED TO                                                                                                                                                (C) WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED
                                                                                                                                                                                                            PREVENT INTERMIXING OF SUBGRADE                                                                                                                                                   ON SMALL WORK SITES, I.E. OPERATIONAL PERIOD LESS THAN 6
                                                                                                                                                                                                            AND BASE MATERIALS AND TO MAINTAIN
                                                                                                                                                                                                                                                                                                                                                                                              MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS NOT
                                                                                                                                                                                                            GOOD PROPERTIES OF THE SUB-BASE LAYERS.
                                                                                                                                                                                                                                                                                                                                                                                              EXPECTED.
                                                                                                                                                                                                            GEOFABRIC MAY BE A WOVEN OR NEEDLE-PUNCHED
                                                                                                                                                                                                                                                                                                                                                                                         (D) WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR -
                                                                                                                                                                                                                                                                                                                                                                                               REFER IPEAWQ STANDARD DRAWING D-0040 FOR DETAILS.
                                                                                                                                                                                                            PRODUCT WITH A MINIMUM CBR
                                                                                                                                                                                                                                                                                                                                                                                         (E) FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL BATTERS,
                                                                                                                                                                                                            BURST STRENGTH (AS3706.4-90) OF 2500 N
                       UNDISTURBED AREA                                                                                                                                                                                                                                                                                                                                                        WHERE NOT PRACTICAL ONE FENCE CAN BE AT THE TOE WITH A SECOND
                                                                                                                                                                                                                                                                                                                                                                                               FENCE 1M MIN AWAY. FENCE SHOULD NOT BE LOCATED PARALLEL WITH
                                                                                                                                                                                                                                                                                                                                                                                               TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
                                                                                                                                                                                                                                                                                                                                                                                      3. TEMP CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP.
                                                                                                                                                                                                                                                                                                                                                                                            (A) ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.
                                                                                                                                                                                                                                                                                                                                                                                            (B) WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
                                                                                                                                                                                              N.T.S.                                                                                                                                                                                  4. SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE
                                                                                                                                                                                             CONSTRUCTION NOTES                                                                                                                                                                            TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE
                                                                        20 M MAX.
                                                                                       SWMP/ESCP)                                                                                            1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                                SUPERINTENDENT.
                                                                          OTHERWISE ON
                                                           (UNLESS STATED                                                                                                                    2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                                                                                                                         5.
                                                                                                                                                                                                                                                                                                                                                                                           IT IS THE CONTRACTOR'S   RESPONSIBILITY TO ENSURE THAT ALL SEDIMENT
                                                                                                                                                                                             3. CONSTRUCT A 200 MM THICK PAD OVER THE GEOTEXTILE USING ROAD BASE                                                                                                                           AND EROSION CONTROL MEASURES HAVE BEEN ADDRESSED AS STIPULATED
                                                                                   FLOW                                                                                                      OR 30 MM AGGREGATE.                                                                                                                                                                           IN THE ENVIRONMENTAL MANAGEMENT PLAN / EROSION & SEDIMENT CONTROL
                                                                                                                                                                                             4. ENSURE THE STRUCTURE IS AT LEAST 15 METRES LONG OR TO BUILDING                                                                                                                             PLAN. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION
                                                                                                                                                                                             ALIGNMENT AND AT LEAST 3 METRES WIDE.                                                                                                                                                         PHASE, AS DIRECTED ON SITE BY THE SUPERINTENDANT.
                                                                                                                                                                                             5. WHERE A SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS,                                                                                                                                   TEMPORARY   6. STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND BE
                                                                                                                                                                                             CONSTRUCT A HUMP IN THE STABILISED ACCESS TO DIVERT WATER TO THE                                                                                                                              SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE
                                                                                                                                                                                             SEDIMENT FENCE                                                                                                                                                                                SATISFACTION OF THE SUPERINTENDANT. ALL EXPOSED STOCKPILE
                                                                                                                                                                                                                                                                                                                                                                                           SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
                                                                                                                                                                                                                                                                                                                                                                                           DRAINS MAY BE REQUIRED, AT THE DISCRETION OF THE SUPERINTENDANT.
                      MIN. 1.5 M
                                                                                                                                                                                                                                                                                                                                                                                      7. SEDIMENT AND EROSION CONTROL DEVICES (OTHER THAN THOSE ALREADY
                                                    STAR PICKETS AT MAXIMUM                            PLAN                                                                                                                                                                                                                                                                                 SHOWN) ARE TO BE INSTALLED WHERE NECESSARY AND AS DIRECTED BY
                                                    2.5 M SPACINGS                                                                                                                                                                                                                                                                                                                          SUPERINTENDENT
                                                                                                                                                                                                                                                                                                                                                                                      8. SEDIMENT AND EROSION CONTROL DEVICES ON THIS PLAN ARE INDICATIVE
                                                                                                                                                                                                                                                                                                                                                                                            ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT THE
                     N.T.S.
                                                                                                                                                                                                                                                                                                                                                                                            INTENTS OF THIS PLAN AND ENVIRONMENTAL MANAGEMENT PLAN ARE COMPLIED
                     CONSTRUCTION NOTES                                                                                                                                                                                                                                                                                                                                                     WITH.

                     1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE                                                                                                                      RET
                     SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE                                                                                                                   5 ME URN T
                     SECTION. THE CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF CONCENTRATED AT                                                                                                                          TRE URF                                                             CONSTRUCTION NOTES
                     ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN STORM EVENT, USUALLY THE 10-YEAR EVENT.                                                                                                                                 S TO STR
                                                                                                                                                                                                                                                 PRE IPS E                                                  1. INSTALL A 2 x 400mm MINIMUM WIDE ROLL OF TURF ON THE
                     2. CUT A 150-MM DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC                                                                                                                                   VEN VER
                     TO BE ENTRENCHED.                                                                                                                                                                                                                 T SC Y                                               VERGE NEXT TO THE KERB AND AT THE SAME LEVEL AS THE TOP
                                                                                                                                                                                                                                                           OUR                                              OF THE KERB.
                     3. DRIVE 1.5 METRE LONG STAR PICKETS INTO GROUND AT 2.5 METRE INTERVALS (MAX) AT THE DOWNSLOPE
                                                                                                                                                                                                                                                                                                            2. LAY 1.4 METRE LONG TURF STRIPS NORMAL TO THE KERB EVERY
                     EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE FITTED WITH SAFETY CAPS.                                                                                                                                             E TR E
                                                                                                                                                                                                                                      1 M                                                                   5 METRES.
                     4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS ENSURING IT GOES TO THE
                     BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH WIRE TIES OR AS RECOMMENDED BY THE
                     MANUFACTURER. ONLY USE GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                     SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                     5. JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150-MM OVERLAP.
                     6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT THOROUGHLY OVER THE
                                                                                                                                                                                                                                                                                 M   MIN.
                     GEOTEXTILE.                                                                                                                                                                                             TUR
                                                                                                                                                                                                                                F                                          800 M

                                                                                                                                                                                                            KER
                                                                                                                                                                                                                B


                                                                                                                                                                                                    GUT
                                                                                                                                                                                                        T   ER

                                                                                                                                                                                          ROA
                                                                                                                                                                                                DW
                                                                                                                                                                                                       AY




                                                                                                                                                                                       N.T.S.




    360 CIVIL CONSULTING PTY LTD                                                                              No       Date                          Amendment
                                                                                                                                                                                                                                                      Design:        J.A.G                            FOR APPROVAL                              CLIENT:        JOHNSON COLES, JOHNSON, RANDALL & HUSSAIN                                                       JOB NUMBER
                                                                                                               A     08-03-18 CHANGES AS PER COUNCIL RFI
                        ABN: 13 609 593 339                                                                                                                                                                                                           Drawn:         J.A.G                                                                      PROJECT:       PROPOSED DUPLEX DEVELOPMENT
BEATRICE GIBBERD RPEQ 14557 - DIRECTOR AND PRINCIPAL ENGINEER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2017115
           23 OOGAR STREET, MAROOCHYDORE. QLD 4558                                                                                                                                                                                                    Date:          04/11/17
                                                                                                                                                                                                                                                                                            BEATRICE GIBBERD RPEQ 14557                         AT:      30-32 COCKLESHELL. NOOSAVILLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                               DRAWING No:
   Mobile: 0403 862 009  Email: [email protected]                                                                                                                                                                                    Checked: B.G.                                DATE:       04/11/2017                                LOT 11 ON RP138550 & 0 BUP6971
 THIS PLAN IS COPY PROTECTED BY 360 CIVIL CONSULTING PTY. LTD.
                                                                                                                                                                                                                                                       Datum:        A.H.D.                         Size:           A3                          TITLE: EROSION & SEDIMENT CONTROL DETAILS PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  10 of 12
Log in to download the original file

Attachment 2 - Operational Works Plans.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.