Council archive · source document
Proposal Plans_Minor Change_Stage 1 & 2 · 51901.3614.03
Plans and drawings: the text below has words only, no drawings.
Very large file (18.6 MB): may take a few minutes to open.
Original PDF page 9, section 2. The text section number identifies this passage in the reader.
fall BUILDING A Gate
BUILDING B EX-
HYD
up
Landing
TL-07
N-COL
N-FWG
TL-07 TG
D
TL-01
dn
SC reen
U205 U206 U207
-20
U208 U209 U210 U211 U212 U213 U214 U215 U216
Sc
EX-DP in wall
N-RWO
ir
EX-
Sta
RWO
3
w
L-0
Line of new blockwork
fa
Ne
TL-07
ll
BA
T6
wall extension to
L-S
existing shown under
BA
T2
L-S
U204 terrace
BA
New roof over wine
Existing Units bar / lounge area.
New storage and sanitary
fa facilities above existing
ll (no works) Provide fire separation
substation on elevated N-COL
BA
L-
B5 K measures as part of Existing Units floor to future details.
Select powdercoated alum. NCC requirements (no works)
ct
'Heka' hood over new
Du
SC reen
grilles to laundry below K
-21
BA Glass Glass Glass Glass Glass Glass Glass
Sc
L- Bricks Bricks Bricks Bricks Bricks Bricks
B5 Bricks
Screen
Planter N-COL
GP
fall
BAL-01
Walkway FL
19
N-RWO EX-DP in wall Female
C-
Provide new proprietary type waterproof (new tiled finish) 400mm high low New
TL-07a
nS
tanking membrane to existing planter slabs FL Roof 12 height wall below New planter Planter
S
Fascia gutter
D
OVF
HW
EX-
ree
G
TL-07 balustrade.
as per manufacturer's recommendations fall New
U203 terrace
ick s
HYD
Sc
Box gutter
B5
Br las
s
8°54'10"
50.795
and landscape architect's details Roof
L-
OC
G
(new tiled finish) T.O.W. EX-COL
BA
fa
DP/OVF Void 2° RL 6.080 FFL 5.630
SHS
TL-07 TL-07 PWD
BAL-01
TL-07 ll
U204 Void 400mm WT
fa
OC Landing
Roof 5 OVF CBR 1
17 D
ll
BA FL New planter high low
ES TL-07a
L-
B5 CBR SETOUT POINT height wall
0
R OVF EX-COL FL EX-DP EX-COL Gate
FH
0
FL
1:4
EX-DP EX-COL EX-COL FL FL EX-DP Refuse N-DP N-DP GP
New Roof
Planter GP GP
TL-07 SHS
EX-DP EX-COL BAL-01 Suite 2,
36
D
5°
EX-DP in wall Box G.
Existing EX- EX-DP EX-COL TL-07 Male
FL to wall FL DP 1:40 EX-COL BAL- TL-07a 0 Cnr Gard
FL DP/OVF Lift Core 01 Walkway
New Roof
TL-07 02
A
below Roof 6
EX-DP (new tiled finish) EX-DP BAL-04 BAL-ST3 Alexand
CBR
2°
U202 terrace CBR FL
PO Box
O
(new tiled finish)
(new tiled finish) EX-DP EX-COL N-DP KEX
FL FL EX- EX-COL
FHR
Walkway
BAL-ST1
EX-COL
BAL-ST1
DP EX-COL
P 07 54
R
New Roof
TL-07 Blade wall below FL FL Existing
GD fall
U203
BAL-ST1
BAL-ST1
FL New concrete N-COL
admin@
2°
Concealed fascia gutter Lift Core 02 infill to existing
Fascia gutter
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.