Council archive · source document
Proposal Plans_Minor Change_Stage 1 & 2 · 51901.3614.03
Plans and drawings: the text below has words only, no drawings.
Very large file (18.6 MB): may take a few minutes to open.
Original PDF page 27, section 1. The text section number identifies this passage in the reader.
fall
Gla icks
KIN
Br
TL
n REV DESCRIPTION DRN DATE
ree
ss
-07
Sc -12
SC A MCU DA Issue MS 25.02.20
1
TL
B MCU DA Issue MS 02.03.20
TI
2
-07
3
C MCU DA Issue MS 06.03.20
up
4
D Client Revisions MS 14.04.20
5
6
E MCU DA MS 05.08.20
7
1:4
Information Response
8
New grated drain with tiled
0
EX
inset as per hydraulic F GIA Issue MS 07.04.21
-C
BA
T1
GP
engineer's requirements
O
L-S
L-S G GIA Variations MS 24.06.21
L
BA
T3
New reinforced concrete H GIA Variations MS 11.08.21
Sc -13
T1 Provide 50 x 50 powdercoated
SC
L-S
ree
Shallow tile insert drainage
Ne p ram
topping slabs as per I Minor Change Revision MS 21.09.21
ste
BA aluminium batten screen between exit 125 mm max. opening
w
n
structural engineer's details. channel. Provide 50 mm Ø J Minor Change - Stage 1 & 2 Works MS 10.12.21
walkway and existing planter. Refer to between wall and floor
1:1 p
Fir R ppro
Ex tair 00
New tiled finish TL.07 CD80.11 for detailed elevation downpipe in column below
e S 15 x.
0
EX
isti 02
U2
14
Ex
EX
13
-C
ng
-C
n
isti
12
N-
16
O
ree
a
0
up
Changes to mechanical
O
1:1 p Provide tactile indicators
L
11
Sc -14
FW
Existing lightweight-
L
TL
ng
10
w vents to be confirmed with as per AS 1428.4.1 and
SC Ne p ram New, reconfigured entry / exit fire
G
-07
framed wall to remain
WT 1
TL
N-
9
mechanical contractor
Gla icks
ste NCC requirements escape stairs, ramps and
Re
-07
Br
DP
ss
platforms to conform with current
La
BA
1:40
s
nd
L-S
building standards to future detail
tau
ing
N-
T3
New blockwork wall (WT1) Existing hot-dipped
EX D
DP
HY
ran
-
extension under to existing shown galvanised steel cross
EX
HY
EX
THR
-
dotted. Wall to support new slab
GP
brace to remain
D
Ne ter
t
-C
Pla
EX
O
w
n
ES
L
31
-C
TL
6S
O
Ga
Screen SC-19
-07
L
te
EX
.S
BAL-ST3
N-
Fall
1700
-C
Fa
SH
Provide 50 x 50 powdercoated
BAL-02
O
sc
Fall
Fall
S
L
aluminium batten screen
ia
Line of bulkhead over
TI
KE
gu
between exit walkway and shown dotted.
of
TGD
tte
X
up
Ro existing planter to future details
(1) 3
(2) 4
(3) 5
(4) 6
(5) 7
(6) 8
(7) 9
(8) 10
(9) 11
(10 12
(11 13
r
w New powdercoated
Ne 30°
La
)
)
2
aluminium screen and
nd
FL
DBM Duct WT 5
(12
ing
gate to fire exit to HD HD
45
DWB
)
0d
future details
TL
BAL-03
HWhelve
s
-07
S s
SD Screen
PW
BAL-ST6
Fe
Ma
SC-21
Fa
N-
External line of blockwall
ll
TL
ma
CO
TL
D
le
to line up with existing
-07
TL
New Stair
-07
CH
TI
L
N-
le
slab / hob edge
-07
a
dn
a
SH
a
GR GR GR GR
I
Fal
Fal
HD
S
l
l
TRH DWC TRH TRH
N-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
N-
Services concealed GR
CO
UR VB WC WC VB WC BAL-ST2
DP
N-
below new floor structure FW TRH Screen
L
GR
DP
SD BM SD
N-
SH
(dashed purple). Drop to BM SC-20
N-
S
DP
SH
plumbing stack below
CO
N-
N-
S
Generally throughout:
DP
CO
L
Line of wall build-out / extended window subsill
N-
L
- New render and paint finish to all external walls
DP
Feature reinforced mass 100 x 25 powdercoated Line of new roof over
concrete stair as per aluminium screen fixed to Sails Service Entry - New anodised aluminium (25µm coating)
J structural engineer's details to slab edge shown dotted sliding doors to terraces / balconies
Hand basin waste
Drainage concealed Line of wall under - New anodised aluminium (25µm coating) windows
to run horizontally New powdercoated Feature frameless glass
within wall cavity shown dotted Line of new roof over
inside wall frame aluminium screen to balustrade fixed to slab edge. - New frameless glass balustrade with
to main stair and
front section of duct Continue panelling beyond
Line of new roof over to
Downpipe to be concealed enclosure upstand wall on ground level
landing shown dotted anodised aluminium (25µm coating) uprights
within structural column as per
amenities shown dotted
hydraulic engineer's details
- New tiles to walkways, terraces and balconies
I
LEVEL 1
Scale 1:50
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.