REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
G GIA Variations MS 24.06.21
H GIA Variations MS 11.08.21
I Minor Change Revision MS 21.09.21
J Minor Change - Stage 1 & 2 Works MS 10.12.21
Key Changes - Legend
Stage 1 Works
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout: 7 New covered walkway links to the fire stairs
- New non combustible render (similar to on Level 4 for increased weather protection
Rockcote Q render) and waterproof 8 New feature pergolas to the rooftop terraces
membrane paint system to all external walls for increased shade protection
- New anodised aluminium (25µm coating) 9 A new cantilevered awning above the north
sliding doors to terraces / balconies facing units on the beach side for increased
weather protection
BUILDING A BUILDING B
- New anodised aluminium (25µm coating) windows
- New balustrades throughout entire building 10 A new awning structure above the U205
terrace for increased weather protection
- New tiles to walkways, terraces and balconies
11 A new rear entry structure between the
building and the beach for increased
weather protection
12 A new plunge pool and pergola over
to existing U205 terraced
13 New stair, substation, amenities and roof
structure to the eastern side of the building /
Sails entry
14 New shopfront and roof over 'Rumba Bar'
as well as extension of Fire Stair 01
J Stage 2 Works
15 New feature awnings and entry stairs,
landscaped planter reconfiguration to
Tenacies 3, 4 & 5 as part of Stage Works
SETOUT POINT
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
NEW WORKS - THIRD FLOOR
SITE PLAN
AS SHOWN
date 10/12/2021 drawn JP scale @A1
drawing no. 19021 SD10.03 revision J
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 3 Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.