17. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the Nature Conservation Act 1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Protect and recover fauna during clearing operations (not previously removed).
e. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
*(Refer to Advisory Note)
Fencing
18. Any proposed new fencing to delineate boundary alignments within the Biodiversity Overlay
and/or Koala Priority and Koala Habitat Areas must be constructed to allow for the movement
of fauna. Such fencing must:
a. allow adequate clearance at ground level for local macropods
b. not include any use of barbed wire or similar materials
c. provide regular opportunities for passage over and through
d. be agreed by Council
Bushfire Management
19. The development must be carried out in accordance with the Bushfire Management Plan,
prepared by North Coast Environmental, dated 22/11/2021.
*(Refer to Advisory Note)
20. A copy of the Bushfire Management Plan report listed within this Decision Notice must be
provided to the nearest fire authority.
21. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice.
*(Refer to Advisory Note)
Property Access and Driveways
22. The existing crossover must be upgraded to be generally in accordance with:
a. Councils standard drawing RS-056 (and associated addendums);
b. The approved plan B210717 (Rev B); and
c. Include a compacted road base surfacing within the road reserve.
The works must be undertaken with written approval in accordance with Noosa Council
driveway crossover approval conditions and adopted standard drawings for the crossover
type as required by the Planning Scheme. Construction, modification or alteration of a vehicle
crossover must not commence until approval has been received from Council.
Stormwater Drainage.
23. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Page 4 of 17
Document Set ID: 21734524
Version: 3, Version Date: 22/12/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.