Council archive · source document
00154986.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. . . . XX
. . t
INTEGRATED PLANNING ACT 1997 7 ; __ JDAS Assessment Checklist, Version 20, 2 April 2007
‘State-controlled road matters "42. The application involves: (tick applicable box/es) i :
-Formare information refer to Guide 3, (71 (i) development on land contiguous’ to a State controlled road and for -
_ Unless you answered “none of thé above"toQ2,| . . . . ,
the application biggers referral to the Deparment {_] (a) material change of use assessable against the planning scheme; . ;
olMain Roads{OMR) as areferrat agency... [_] (b) reconfiguring a fot unless - oo
In‘certain circumstances DMR.will be an advice . . ' .
agency, while in other circumstances DMR will * the total number of lots is not increased; and oo.
be a concurrence agency. : + the total number of lots abutting the State-controlled road is not increased;
‘Schedule 2 of the'IP. Regulation will assist you to +n a , . . ‘ ..
. deierming wheré DMR is an advice of C) (c) operational work (not associated with a material change of use assessable against the
_ concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above} :
. . — associated with access to a State-controlled road; or
. oo . |. « for filling of excavation; or — ..
|. __ involving the redirection or intensification of site stormwater from the land, through a
. 7 “ | pipe with a cross-sectional area greater than 625 cm: that directs stormwater to a
| State-controlled road. a — ,
: soe FT oy J [1] (ii) development on land not contiguous to a State-controlled road and -
—— 4 C1 (a) material change.ofuse~
. * assessable against the local government's planning scheme; and
: — a . " « mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds.set by ~
| , that schedule; ‘ . .,
- or [_] (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
; , . - 7 : * and exceeding the thresholds set by that schedule; . uo
ee . ; ae | (1) (c) operational work (not associated with a material change of use assessable agains ,
a oe, we - planning scheme or reconfiguring a lot mentioned in (b) above)— . :
, Pye + assessable against the local government's planning scheme; and
OT _ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
a ce that schedule. oo
oo . OO (Aili) none of the above - .
- Clearing vegetation _ . 13. The application involves: (tick applicable box/es) © ~ .
/ For more information refer to Guide 12. ” CI (i) . material change of use - ;
Unless you answered “néne of the above” to 03, , . _ . . -
____+_ the application requires assessment bythe. |... (a)_assessable against the planning scheme;__... sae = .
— Department of Natural Resources and Water ining — :
(RW), as . (b) on a lot containing
if an agency other than NRWis the assessment - « acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
; manager for the application, NRWisa =~ 0 « ‘if there is no property.map of assessable vegetation. for the lot - remnant vegetation;
condlurrence agency forthe application in wletony = (c)_where'the existing use of the land is a rural or environmental use; and
I you licked 49() ori, your pietcn eequies (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of - CL] (ii) . reconfiguring a lot- , :
whether vegetation clearing is proposed ar not. ° - .
(a) ona lot containing a category 1, 2.or 3 area shown on-a properly map of —.
“assessable vegetation or, if there is no property map of assessable vegetation '"@
‘ the lot, remnant vegetation; wo .
; (b)+ where the’ size of the lot before the reconfiguration is 2 hectares or larger; -
, i (c) where 2 or more lots are created; and
to, {d) _ where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
. (_](iii) operational work: - .
. ‘__ (a) for the clearing of native vegetation where the vegetation clearing is made ,
assessable under Schedule 8 of the IPA; and
cS (b} not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
a . oy Form 1 . : .
Oo - (1 (iv) none of the above. ,
. Strategic portland =~. 4." The application involves:
hy ered) me ae ott vist (_] (i) devetopment.on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
. If you ticked (i} --the relevant Port Authority is the at) ; .
“assessment manager forthe pplication. | Act) - complete Part { of Form 1 a -
: "you ticked (fi) Queensland Transport is:a _ ’ [1 (i) a material change of use that is inconsistent with the land use plan approved under the.
__.... Soneurrence.agency for the application. | ———> _T| Act-for-the-strategic-portiand--complete Pan-tof Form-f <->
Se 7 (iii) none of the above oo . . .
went Le LD LEED SE eee Wee SEL ee
aaa . | _ 7
. - 4 Land contiguous io a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controfled road; or that is part of a future State- '
. _ controlled road. Lo : . : a 4
; . . Page 2 : . ‘See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154986.001.pdfRelated documentPublic source context ↗
07/1253 - Op Works - Single House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.