Council archive · source document
00154986.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
* s.
INTEGRATED PLANNING ACT 1997 *_- . IDAS Assessment Checklist, Version 20, 2 April 2007
integration of{and use and public . |22. The application involves: (tick the applicable box/es)— 7%
ranepe "maton rele’ to Guide 23, schedule (_] (i) a material change of use assessable against the planning scheme for a purpose oo
"BA of the IPA, & schedule 2 of the IP Requiation. | " mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
"+, Unless you answered “none of the.above", the 4 schedule. , :
‘application triggers referral to QT as a ‘ .
concurrence agency. oS C1 (ii) reconfiguring a fot— .
- oo . [1 (a) on land that is completely or partly within a public transport corridor, andthe
; oe ms total number of lots increases; ;
i. oS [J (b) on land that is completely or partly within a future public transport corridor or
; an airport's public safety area; oo,
. te, (©). on land that is within 400m of a public passenger transport facility or a future
BS a , public passenger transport facility, and the total site area is 5000m? or greater;
, Ss [].(d) . for a residential purpose within the 25 ANEF contour for an-airport;
[]{e) fora residential purpose resulting in 100 or more allotments. 7
-_ _ D1 (iii) operational work assessable against the planning scheme, but not associated with a
: material change of use mentioned in (i) above or reconfiguring a lot mentioned:in (ii)
SO os : above, on land that—
o, od. [_] {a} is completely or partly within a-public transport corridor or a future public
. Bs - transport corridor; a, ;
et . [J {b) will result in work that encroaches into an airport's operational airspace.
, a L] {iv) none of the above. , oS @ .
Railway safety and efficiéricy. £93, The application involves: (tick the applicable box/es)~ : - ; .
For more information refer to Guide 23; schedule}. — [“] (i) @ material change of use assessable against the planning scheme for apurpose
BA ofthe [PA & schedule 2 of Wher Reguiaton ulation, oO mentioned in schedule 13D of the IP Regulation and excending the thresholds set by that
/ Uniess you answered “none of the above’, the : . - .
- application triggers referral to QT.as. a , __ Schedule. . : -
. . concurrence agency. (_] (ii) reconfiguring a fot— : ee
oo . re ; (CJ) (a) on land that is completely or partly within a future public transport corridor,
, : : future railway land or a railway tunnel easement;
oe - [2] (b) — on land that is within 400m of a Citytrain. passenger railway station or a future
_ _. _Citytrain passenger railway station, and_the.total.site areais.5000m2or- .. — --.—
rs — greater; ‘. oo, ,
; “(4 (©) _ ontand that abuts rail corridor land, commercial corridor land or future railway
.- land, and the total number of lots increases;
: oo [J (d) on land that abuts rail corridor tand, commercial corridor land or future railway .
fand_and an easement abutting the corridor or future railway land is created;
oo [1 (e) on Jand that is completely or partly within 100m of, and abutting an approach
‘ . Se to, a railway level crossing, and the total number of lots increases; . .
“ L-](f) for a residential purpose resulting in 100 or more allotments. Lo :
- 1 (iii) operational work assessable against the planning scheme, but not associated with a @
mo, material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that— ,
[] {a} is completely or partly within rail corridor land or commercial corridor land, and .
, : - the work is not for rail transport infrastructure or other rail infrastructure; -
. [J (b) is completely or partly within future railway land, or a railway tunnel easement;
ss (J (c) abuts rail corridor land, commercial corridor land or future railway land, and
; , -the work is within 25m of the railway boundary. ,
, [_] {iv) none of the above. . Ce .
Moonie to Brisbane pipeline _ -|24. The application involves the easement for the construction or operation of the Moonie to
. - For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)— ; ,
See enauered snone of the above" the ("] (i) a material change of use assessable against the planning scheme and not associated
. appficaton biggers referral to the holder of wiih reconfiguring a jot, and any structure or work will be located wholly or partly in the
, "pipeline licence No 1 issued under the Petroleum easemeni. : .
‘ Act 1923, currently Santos QNT Pty Ltd, for C] (ii) reconfiguring alot ” .
advice. ae . . ° -. . . .
- [_] (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
a | workis located wholly or partly inthe easement.
_ C1 (iv) none of the above. —- ,
. : : ’ Pages : .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154986.001.pdfRelated documentPublic source context ↗
07/1253 - Op Works - Single House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.