Original source · versioned page text
Decision Notice - Approved by Delegation of Authority MCU21 0157
Officer: Tiani Bird Direct Telephone: 07 5329 6245 Our Reference: MCU21/0157.01 Your Reference: n/a 24 April 2025 Ashburton Pastoral Company P/L C/- R Anderson PO Box 549 TEWANTIN QLD 4565 [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 27 March 2025, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: MCU21/0157.01 Street address: 55 Doonella St, Tewantin Qld 4565 Real property description: Lot 5 RP 73672 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 6 June 2022. Development Permit for Material Change of Use of Premises In relation to the request to make a minor change to the existing approval, Council on 22 April 2025, decided to approve the requested changes. The changes are detailed below. Approve the change. Amend the list of approved plans. Amend condition 8. currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date BA5502 C Site Plan / Roof Plan, prepared by Arco Eco 07/03/2025 BA5503 C Proposed Lower Floor Plan, prepared by Arco Eco 07/03/2025 BA5504 C Proposed Upper Floor Plan, prepared by Arco Eco 07/03/2025 BA5505 C Proposed Elevations 1 / 2, prepared by Arco Eco 07/03/2025 BA5506 C Proposed Elevations 2 / 2, prepared by Arco Eco 07/03/2025 BA5507 C Section and Height, prepared by Arco Eco 07/03/2025 Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Currency Period This development approval lapses if the use has not happened by 6 June 2028, unless an application to extend the currency period is approved by Council. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like, except where required to satisfy any privacy condition of this Decision Notice. Materials and Finishes Buildings and structures must use: natural finishes wherever possible; a mix of lightweight and textured external finishes; masonry construction where variation is provided in texture and the façade uses a variety of finishes to break up the surface; and open or transparent balustrades. Fencing and Walls Any street fencing must be set back 50mm from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 2m. be of open construction The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothesline which is screened from public view. Building Height The maximum height of the development must not exceed 8.7 meters (RL 10.07 AHD) above the finished ground level and the natural ground level as detailed on plan DA5307 Rev D. Certification must be submitted to Council from a Licensed Surveyor which certifies that the buildings do not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan 2020 in particular PSP2 - Landscaping for that specific area and must include: the works shown on the Approved Plans; retention of the existing street tree detailed on plan DA5502 Rev D; landscape plantings along the rear boundary of the site a 500mm landscaping buffer strip along side boundaries of the subject site adjacent to the entrance deck and entry walkway in accordance with the approved plans and conditions of approval for the duration of the use; The buffer strip should include species that will provide an effective buffer for maintaining privacy of adjoining uses. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the ddevelopment site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. Site Access and Driveways A sealed access driveway must be provided from Doonella Street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular any improvements/modifications to the existing access driveway to achieve compliance with Council’s Standard Drawings RS-049 and RS-050 and any associated addendum Car Parking A minimum of 4 car parking spaces must be provided on the site and made available and accessible at all times. The works must be undertaken in accordance with an Operational Works approval and must include in particular dimensions, crossfalls and gradients in accordance with Australian Standard AS/NZS2890.1:2004 Parking Facilities. All vehicles must enter and exit the site in a forward gear. The access driveway must provide sufficient area for vehicles to access the site and space in a forward gear, manoeuvre on site and exit the site in a forward gear in a total of 3 movements. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with: drawing number 20210038, issue B prepared by Recor dated 8 November 2021, and The Stormwater Management Report Project No: 20210038, version 2 prepared by Recor dated 9 November 2021 This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All earthworks and associated batters must be undertaken in accordance with an Operational Works approval and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Stormwater Drainage Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Stormwater Quality 32. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular stormwater quality treatment devices of a size and location generally in accordance with those shown in drawing Drawing Number C10, titled ‘Stormwater Drainage Plan’, prepared by RECOR dated 08/11/2021. 33. All primary stormwater quality treatment devices must be routinely checked, serviced and cleaned in accordance with the manufacturer’s recommendations. Records of all maintenance activities undertaken must be kept and made available to Council upon request. Flood Immunity 34. The minimum finished floor level of all buildings constructed on the site must be in accordance with the Approved Plans. Flood Resilience and Flood Storage 35. The building structures (apart from the carports) are to be provided as pole construction, with the underside of the building set above the 1%AEP flood level at year 2100 (the DFE). The building undercroft is to remain open and able to function to provide floodplain storage during a flood event. All building components located below the DFE, such as the building piers and stairs, are to be designed and constructed to be resilient to the effects of flood water and minimise loss of floodplain storage. Fencing located below the DFE is to be designed to allow the free passage of flood waters, with the design details provided with the development application for Operational Works (Landscaping). referral agencies Not Applicable. advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Assessment Branch to arrange a Development Compliance Inspection. Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges Qualified Person For the purpose of preparing a Landscape Plan, a qualified person is considered to be a landscape architect, landscape designer and/or horticulturist with a minimum of 3 years current experience in the field of landscape design. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. property notes Not applicable. variation approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Stormwater, Earthworks, Landscaping and Access Development Permit for Building Works All building work. submissions Not applicable. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Tiani Bird Development Planner Enc: Appeal Rights Infrastructure Charge Notice Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice – 6 June 2022 Decision Notice - Minor - MCU21/0151.01 – 22 April 2025 with an amendment to conditions 2 & 8. Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 2 of 2 [word/footer2.xml] ABN 97.969.214.121 PO Box 141 noosa.qld.gov.au Tewantin QLD 4565 [email protected] 07 5329 6500 Page 1 of 2 [word/footer3.xml] Page 2 of 2 [word/header2.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.