1 MCU16/0079.02 FURTHER REPORT – REQUEST TO CHANGE A DEVELOPMENT
APPROVAL FOR 5 MEMORIAL DRIVE, TEWANTIN
Cr Pardon declared a perceived conflict of interest in this matter (as defined in section 175D of the
Local Government Act 2009) due to his being a life member of the RSL Sub-branch. Cr Pardon left
the meeting room for the debate and decision on this matter.
Cr Stockwell declared a perceived conflict of interest in this matter (as defined in section 175D of the
Local Government Act 2009) due to the applicant being a sponsor of the Noosa Lions Football Club
of which Cr Stockwell is the Vice President. Cr Stockwell believed that he could consider this item
impartially and in the public interest and requested to remain in the meeting room to participate in the
debate and vote on this matter.
Pursuant to section 175E(4) of the Local Government Act 2009, the remaining Councillors gave
consideration to whether the conflict was a real conflict or perceived conflict and whether Cr Stockwell
may participate in the meeting for the debate and vote on this matter or whether he must leave the
meeting for the debate and vote on this matter.
Committee Recommendation
Moved: Cr Glasgow
Seconded: Cr Jurisevic
That Councillors note the conflict of interest declaration of Cr Stockwell and resolve that this represents
a perceived conflict of interest in this matter and Cr Stockwell may remain in the meeting room to
participate in the debate and vote on this matter.
Carried.
Cr Stockwell did not vote on the above motion.
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Stockwell
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 9 October 2018 regarding Application No.
MCU16/0079.02 for a minor change to Development Permit for Material Change of Use for
extensions to RSL Club situated at 5 Memorial Avenue, Tewantin, described as Lot 10 on
SP 273411 and:
A. Agree to amend condition 3 to read as follows:
3. The proposed development provides for an extension to the Gaming Area
(providing for a maximum of 195 gaming machines and limited to a maximum
floor area of 565m2), Smokers Terrace, Store, Children’s Lounge, basement
carpark area and other internal modifications as shown on the approved plans.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
Cr Stockwell voted against the motion.
Cr Pardon returned to the meeting.
Page 1 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 25 sections
Section 2
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
2 MCU18/0019 – DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
FOR MULTIPLE HOUSING TYPE 3 – RETIREMENT & SPECIAL NEEDS (90 BED AGED
CARE FACILITY) AT 52 – 62 GOODCHAP STREET AND 3 – 11 VAL CRESCENT,
NOOSAVILLE
Refer to further report at Item 4.
3 COOROY HINTERLAND PLAYGROUND PROJECT UPDATE & ESTABLISHMENT OF
PROJECT GROUPS
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Pardon
That Council note the report by the Project Officer to the Services & Organisation Committee
Meeting dated 9 October 2018 regarding the Cooroy Hinterland Playground update and
establishment of project groups and:
A. Note the project update;
B. Approve the establishment and membership of an Internal Working Group for the
remainder of the project; and
C. Appoint Councillors Pardon and Wilkie to the Cooroy Hinterland Playground External
Reference Group.; and
D. Request that a further report be brought back to a future round of Council meetings
detailing the associated works, maintenance and whole of life costs related to the
Playground project.
Carried.
4 FURTHER REPORT - MCU18/0019 DEVELOPMENT APPLICATION FOR A MATERIAL
CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 3 RETIREMENT AND SPECIAL
NEEDS (90 BED AGED CARE FACILITY) AT 52 - 62 GOODCHAP STREET AND 3 - 11
VAL CRESCENT, NOOSAVILLE
Committee Recommendation
Moved: Cr Glasgow
Seconded: Cr Jackson
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 9 October 2018 and the General Committee Meeting dated 15
October 2018 regarding Application No. MCU18/0019 for a Development Permit for Material
Change of Use - Multiple Housing –Type 3 Retirement & Special Needs (90 bed aged care
facility) situated at 52 – 62 Goodchap Street & 3 - 11 Val Crescent, Noosaville and:
A. Approve the application in accordance with the following conditions:
Page 2 of 26
Section 3
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name
A-DA-01.01 D Site Plan, prepared by Elevation Architecture
A-DA-03.01 K Basement GA Floor Plan, prepared by Elevation
Architecture
A-DA-03.02 K Basement GA Floor Plan, prepared by Elevation
Architecture
A-DA-03.03 I Level 1 GA Floor Plan, prepared by Elevation Architecture
A-DA-04.01 F Roof Plan, prepared by Elevation Architecture
A-DA-09.01 G Elevations Plan, prepared by Elevation Architecture
A-DA-10.01 G Site Sections, prepared by Elevation Architecture
A-DA-10.02 F Site Sections (Sheet 02), prepared by Elevation Architecture
A-DA-22.01 G Goodchap Street (south), prepared by Elevation
Architecture
A-DA-22.02 E Goodchap Street (east), prepared by Elevation Architecture
A-DA-22.03 E Porte Cochere (Goodchap St), prepared by Elevation
Architecture
A-DA-22.04 G Goodchap Street (north), prepared by Elevation Architecture
A-DA-22.05 G Val Crescent (north), prepared by Elevation Architecture
A-DA-22.06 G Val Crescent (west), prepared by Elevation Architecture
A-DA-22.07 F Val Crescent (south), prepared by Elevation Architecture
3. The Approved Plans must be amended to incorporate the amendments listed
within this Decision Notice and resubmitted to Council prior to the issue of any
Development Permit for Operational Works.
Nature and Extent of Approved Use
4. The ‘café’ must be used for residents and their guests only and not be for general
public use. No external signage advertising the café is permitted.
Page 3 of 26
Section 4
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Building Height
5. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface except for the lift overruns
and the centrally located skillion roof eaves which must not exceed the height
indicated on the approved plans and not exceed 8.8m above the natural ground
level.
6. The maximum height of the development must be 2 storeys. A 0.75m wide
garden must be provided for the full length of the plant room wall near the
driveway to a height of a maximum of 1m below the ground floor so as to not
constitute a storey pursuant to The Noosa Plan. Amended plans must be
submitted to Council prior to the issue of an operational works approval
demonstrating compliance with the maximum height.
7. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirements of
this Decision Notice.
Performance Bond
8. Security in the form of a cash bond or trading bank guarantee to the sum of
$50,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Street Identification
9. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Building Appearance
10. External finishes must consist of a mix of materials in accordance with the
approved plans. The parapet facing Goodchap Street must be articulated to
break up its length and present a more domestic scale and appearance.
11. All air conditioning units or other mechanical equipment must be fully enclosed
or screened such that they are not visible from the street frontages or adjoining
properties.
Protection of Privacy
12. To ensure privacy is protected between adjoining properties all windows and
glass doors located on the upper level of the southern building face must either:
have a minimum window sill height or 1.5 metres above floor level
be fitted with translucent glazing
be fitted with a fixed external screen
Page 4 of 26
Section 5
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
ENVIRONMENTAL HEALTH
Amenity
13. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants
(including dust or odours) nuisance or any other emissions in accordance with
the nuisance provisions of the Environmental Protection Act 1994.
Noise Nuisance
14. Noise emission from mechanical equipment must comply with the following
requirements:
Air-conditioning, refrigeration, fans including mechanical exhaust
fans/ventilation, plant rooms and refuse compactors:
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
15. Submission of written certification from a suitably qualified person confirming that
the noise levels from all mechanical equipment comply with the noise
requirements of this Decision Notice when measured at either the residential
boundary or outside the most exposed part of an affected building, whichever is
the closest to the equipment.
The assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format approved
by Council. All equipment should be operating at the same time to test the overall
noise level created.
Kitchen Exhaust
16. Kitchen exhaust points for the development must be located and operated in
accordance with Australian Standard AS1668.2-2002 “The use of ventilation and
air-conditioning in buildings” (specifically Section 5.10 – Air Discharges).
17. The development must be constructed with reticulated ducting inside the building
to transfer kitchen exhaust fumes to a discharge point on the roof.
18. Submission of written certification must be provided from a suitably qualified
person confirming that the kitchen exhaust is constructed, installed and is
operating in accordance with Australian Standard AS1668.2-2002.
The assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format approved
by Council.
Service Vehicles
19. Deliveries to the site must be between 7.00am and 6.00pm Monday to Saturday
and not permitted on Sunday or public holidays.
Page 5 of 26
Section 6
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Building Demolition/Removal/Relocation
20. Where the development involves the removal, relocation or demolition of a
building, a Waste Management Plan (construction and demolition) in accordance
with Planning Scheme Policy 11, Waste Management Plans must be submitted
and approved by Council’s Environmental Health Officer prior to issue of a
development permit for operational works for demolition, removal or relocation of
any building other than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of
waste for the effective reuse and recycling of such materials. Segregated wastes
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste storage areas must provide adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are
convenient and safe to use.
The Plan must contain the following information:
The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application
A waste management table as indicated below is to be completed showing
how waste material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify contractor
waste volume(m³) *specify proposed *specify and landfill site or
materials re-use or on-site contractor and other disposal site
recycling methods recycling outlet
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste
Management table is to be completed by the demolition contractor.
Page 6 of 26
Section 7
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Waste Storage & Disposal
21. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties.
22. Waste collection services are limited to between 6.30am and 6.30pm Monday to
Saturday and not permitted on Sunday or public holidays.
Outdoor Lighting Devices
23. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
obtrusive effects of outdoor lighting” using a control level of 1.
24. Certification must be submitted to Council from a qualified person which certifies
that all outdoor lighting devices comply with the requirements of this Decision
Notice at the time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a
qualified person is:
a Registered Professional Engineer of Queensland;
an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
LANDSCAPING
25. The development site must be landscaped in accordance with Planning Scheme
Policy PSP 3 – Landscaping Plants and Guidelines and an Operational Works
approval and must include local native species and in particular:
any boundary fencing must be setback a minimum of 1m from the boundary
and/or covenant areas. The area of land between the boundary or covenant
areas and the fence must be densely landscaped to screen the fence from
the street. The landscaped area must include 1 feature tree every 3m;
dense landscaping must be provided along the southern boundary to
effectively screen the development from the adjoining residential dwellings;
dense landscaping must be planted for the full frontage of Val Crescent to
screen the development. The plantings must include a mix of low, medium
and tall shrubs and trees and in particular;
i. include 12 x 100 litre native tree species along the Val Crescent
frontage between the driveway and the southern boundary of the site.
Proposed species must be submitted for operational works approval;
shrubs and trees along the Goodchap Street frontage must have a
minimum pot size of 200mm and must include 5 feature trees with a pot
size of 100 litres;
2 x 100 litre feature trees planted in each garden located near the building
either side of the porte cochere. The tree species chosen must have a
mature height of 8m or more;
provision of 1 street tree with a pot size of 100 litres for every 8 metres of
frontage;
Page 7 of 26
Section 8
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
provide a survey plan prepared by a suitably qualified person which
identifies the mature trees on site and their possible retention in particular
the trees near the site boundaries;
the large eucalypt tree near the proposed driveway in Val Crescent must
be retained. In this regard, an arborist report outlining measures to maintain
the health of the tree during the design, construction and operational phase
of the development must be submitted for operational works approval;
any vegetated water quality treatment system must be located to allow for
landscape screening of the development.
ENGINEERING
External Works
26. Goodchap Street and Val Crescent must be upgraded for the length of their
frontage to the subject site. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
reconstruction of any damaged kerb and channelling;
construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice;
removal of the existing property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including
the provision of topsoil and turf where the existing verge is grassed;
relocation/reinstatement of existing on-street parking bays required as a
result of development works;
linemarking for any potential additional on street parking spaces.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure and s128 being necessary trunk infrastructure identified by
Council’s LGIP to service the development.
27. The existing formation in Val Crescent must be upgraded from the existing
formation in Goodchap Street and extending to the tangent point in the kerb line
adjacent to the northern boundary of No 3 Val Crescent. The works must be
undertaken in accordance with an Operational Works approval and must include
but not be limited to:
works designed and constructed in accordance with Council’s Planning
Scheme Policy PSP 5 – Engineering Design Standards – Roads, Drainage
and Earthworks (section 3.19(d) – Industrial/Commercial – Local road);
the full width of the formation in Val Crescent;
reinstatement of existing linemarking.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Page 8 of 26
Section 9
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Bus Stop relocation
28. The bus stop and associated infrastructure must be relocated in accordance with
Translink’s requirements. These works must also include the installation of a new
shelter in accordance with Council’s standard drawings. In this regard please
note that Council has a contract with a 3rd party to manufacture and install bus
shelters. The developer must:
carryout adjustment works to the kerb line and/or road linemarking along
the new bus stop bay as necessary to achieve compliance with the
applicable standards for cycle lanes requirements. The works must be
included as part of the Operational Works application.
liaise with the bus shelter manufacturer/installer and create all necessary
conditions for their works (i.e. concrete slab, etc.);
advise Council of timing for the installation of the bus shelter and report as
soon as possible any changes to the programme.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure. The relocation of the bus stop is only to facilitate the
development and therefore no offset of the Infrastructure Charges is applicable.
29. Written approval from Translink’s Temporary Closures Team must be provided
as part of the Operational Works application, confirming that the application for
impact to the public transport bus network has been accepted and complies with
DTMR’s “Industry Guideline: A guide to managing public transport impacts”.
Site Access and Driveways
30. Sealed access driveways must be provided from Goodchap Street and Val
Crescent to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
driveway crossovers generally in accordance with Council’s standard
drawing RS-051
suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning
signage must be provided near the exit driveways to warn motorists of
pedestrian movement along the frontage street
Car Parking
31. A minimum of 523 car parking spaces and 4 motorcycle spaces must be provided
and marked on the site and made available and accessible at all times while the
use is open for business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
523 visitor and staff parking spaces within the total and 4 motorcycle
spaces, which are clearly marked for that purpose and accessible at all
times for visitor use
1 disabled parking space within the total
1 space for an emergency vehicle
crossfalls, dimensions and gradients in accordance with Australian
Standard AS2890: Parking Facilities
Page 9 of 26
Section 10
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
32. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
33. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Paving Treatment of Vehicle Movement Areas
34. Alternative materials, patterns, or threshold treatments must be used to articulate
the pavement treatment of vehicle movement areas.
Service Vehicles
35. Service vehicle parking, manoeuvring and standing spaces must be provided on
the site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
36. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a 2.0 metre wide concrete footpath within the road verge for the entire
length of the site’s frontage to Goodchap Street including a new pram ramp
at the intersection with Val Crescent
a 1.5 metre wide concrete footpath within the road verge for the entire
length of the site’s frontage to Val Crescent. This path must be widened to
1.8m where not constrained by services or vegetation in the road reserve.
adequate separation of all specific pedestrian routes from vehicle access
and manoeuvring areas, and clear demarcation by pavement marking,
signposts or changes in surface materials or levels
signage and lighting at strategic locations to direct people to building
entries and public toilet facilities
A pram crossing at the southern end of the path in Val Crescent
Joining smoothly to existing paths, services and verge areas
10 bicycle spaces provided in accordance with AS2890.3 Bicycle Parking
Facilities; and AUSTROADS Guide to Traffic Engineering Practice, Part 14
– Bicycles, Section 10.
end of trip facilities of one locker per two bicycle space and one shower
cubicle with ancillary change room per 10 bicycle spaces or part thereof.
Condition a is imposed pursuant to s128 of the Planning Act 2016 being
necessary trunk infrastructure identified by Council’s LGIP to service the
development.
Condition b is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Page 10 of 26
Section 11
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Stormwater Drainage
37. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval that is issued only where the Operational Works
application demonstrates the following in particular:
Stormwater quantity managed as described in section 4 of the Site Based
Stormwater Management Plan for Knowles Group Proposed Aged Care
Facility at Goodchap Street by Empire Engineering Revision B dated 3 May
2018, with the exception of the following:
i. a stormwater quality treatment system designed in accordance with
a MUSIC model prepared in accordance with the Water By Design
Guidelines which demonstrates that pollutant reduction targets of
90% reduction in Gross Pollutants, 80% reduction in Total
Suspended Solids, 60% reduction in Total Phosphorous and 45%
reduction in Total Nitrogen can be achieved.
ii. To satisfy Section 4.8 of the MUSIC modelling Guidelines, the nodes
provided in the MUSIC model for any proprietary stormwater quality
treatment device must be verified by Stormwater Australia as
achieving the pollutant reduction and design parameters attributed to
the node included in the MUSIC model. Where Stormwater Australia
is unable to endorse the node for the proprietary stormwater quality
treatment device, the industry accepted bioretention basin node must
be provided in the MUSIC model, and redesign of landscaping layout
to incorporate any required bio retention device must be provided.
38. All vegetated stormwater quality treatment devices must be:
designed consistent with the Bioretention Technical Design Guidelines
(Water by Design, 2012); and
maintained in accordance with the Water by Design (2009) - Maintaining
Vegetated Stormwater Assets (Version 1). A copy of this document must
be retained on the site together with the approved Operational Works
drawings for the stormwater quality treatment system and a detailed life
cycle costing of the system attached as an addendum. Records of all
maintenance activities undertaken must be kept and made available to
Council upon request.
39. Any proprietary stormwater quality treatment devices must be routinely checked,
serviced and cleaned in accordance with the manufacturer’s recommendations.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request. Where replacement cartridges or other
necessary components for the system become unavailable, an alternative
system is required to be retrofitted into the development to achieve an equivalent
pollutant reduction outcome.
40. Any Site Operator Management Strategy must include the Water by Design
(2009) – Maintaining Vegetated Stormwater Assets (Version 1) document and/or
maintenance manual for the proprietary device as appropriate and must include
the full cost of maintaining the system in accordance with that document.
Page 11 of 26
Section 12
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
41. Where proprietary devices are endorsed as part of the Operational Works
Approval, a copy of a signed supply agreement between the body corporate/site
operator and the stormwater filtration system supplier for the maintenance of the
proprietary devices must be provided to Council prior to the pre-start meeting for
the development. The supply agreement must be for at least 10 years.
Acid Sulfate Soils
42. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified
person* and provided in the application for the Development Permit for
Operational Works.
43. All waters, including stormwater runoff, groundwater seepage and leachate from
acid sulfate soils must achieve the following quality prior to release from the site:
a pH range of 6.5-8.5 pH units;
50mg/L maximum total suspended solids concentration;
0.3mg/L maximum total iron concentration;
0.2mg/L maximum total aluminium concentration;
no visible plume at either the point of release from the site or within a
waterway.
44. The basement must be designed and constructed as a water excluding structure
in accordance with Australian Standard AS3735 “Concrete Structures for
Retaining Liquids” to ensure groundwater does not enter the basement after
construction is completed.
45. All treated material must undergo verification undertaken by a qualified person*
using the SPOCAS or Chromium Reducible Sulphur testing suite, and the results
must be submitted to Council for appraisal.
46. The application for Operational Works must demonstrate that continual
dewatering of groundwater’s will not occur as a result of groundwater movement
along any bedding material associated with pipes and around the basement of
the development.
Electricity and Telecommunication Services
47. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
48. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements/Covenants
49. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
Page 12 of 26
Section 13
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
50. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
51. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
52. Covenants for the preservation of sight lines distances must be created at the
intersection of Goodchap Street and Val Crescent and at the bend in Val
Crescent. The covenant areas must be generally in accordance with the QTraffic
plan SK.01A in the report dated 3 August 2018, and as modified in red by Council
in the reference documents. The covenant must be in favour of Council and the
terms must include but not be limited to:
No structures or fencing
No landscaping other than grasses, excluding the existing gum tree
The areas to be maintained at all times by the property owner.
Earthworks and Retaining Walls
53. All earthworks and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site (both
above and below ground) unless written permission from the respective
landowner(s) is provided to Council.
54. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
55. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department
of Transport and Main Roads (DTMR) for any works on State
controlled roads
v. provision for worker car parking
maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
Page 13 of 26
Section 14
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
works programme identifying key components of the works and their
respective durations
establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic, services and other relevant
issues
identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
details on the location of external fill/dump sites, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB
any damage to the existing road system as a result of haulage operations
shall be fully repaired at the applicant’s expense
it is acknowledged that the preliminary Construction Management Plan will
be a draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be
required to be submitted at the Pre-Start Meeting for the project.
Damage to Services and Assets
56. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
where otherwise, upon completion of the works associated with the
development.
57. Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. There is a significant need for aged care facilities within the Noosa region and
the proposal will in part satisfy this need.
2. The use is compatible with surrounding residential uses and will not significantly
impact on the amenity of the area. Further conditions are proposed to mitigate
and address any potential amenity impacts.
3. The proposal being low rise and articulated with a variety of external finishes will
sit reasonably well within the streetscape without being overly dominant.
4. The proposal provides extensive landscaping to the Val Crescent frontage to
screen the development from the street.
5. There are limited opportunities of appropriately zoned land for the development
of aged care facilities and overall the proposal is a good response for this site,
considering the Noosa Hospital opposite and Goodchap Street medical centre
nearby.
Page 14 of 26
Section 15
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
6. The applicant has demonstrated that vehicles can enter and exit the Val Crescent
driveway safely.
7. The development will not adversely affect the broader road network.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Cr Jackson called for a division on the voting. The motion was carried 5/1.
For: Crs. Stockwell, Jurisevic, Pardon, Jackson and Glasgow
Against: Crs. Wilkie
The meeting adjourned at 11.43am
The meeting re-opened at 11.50am
5 MCU18/0094 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE -
MULTIPLE HOUSING TYPE 4 (4 DWELLING UNITS), 15 GARNET STREET, COOROY
Motion
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 October 2018 regarding Application No. MCU18/0094 for a Development Permit for
Material Change of Use for Multiple Housing - Type 4 Conventional. (4 Dwelling Units)
situated at 15 Garnet St, Cooroy and
A. Approve the application and grant a Preliminary Approval subject to with the following
conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
A10 F Ground – Site Plan, drawn by Morriarchi Architecture 3 July 2018
A11 E Level 1 – Roof – Site Plan, drawn by Morriarchi 3 July 2018
Architecture
A12 C Townhouse Type A (3 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
Page 15 of 26
Section 16
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
A13 C Townhouse Type B (2 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A14 A Landscape Plan, drawn by Morriarchi Architecture 3 July 2018
A20 E Elevations, drawn by Morriarchi Architecture 3 July 2018
A30 E Sections, drawn by Morriarchi Architecture 3 July 2018
A80 E Perspective Images, drawn by Morriarchi Architecture 3 July 2018
SD-1 C Landscape Concept Plan, prepared by Project Urban 18 May 2018
Prior to the issue of a Development Permit for Material Change of Use, these
plans must be amended in accordance with the following:
a. All buildings and structures must be setback a minimum of 6m from the
front boundary to Garnet St and Wattle St;
b. Additional architectural design features must be incorporated into the
design to better reflect the traditional built form of Cooroy;
c. All buildings must be varied in line and plane to better reflect the original
vernacular architecture of Cooroy;
d. The site layout must be amended to preserve the existing mango tree to
Wattle Street and allow for additional landscaping between buildings;
e. The gable end components facing Wattle St must be redesigned to better
reflect the traditional built form of Cooroy; and
f. The driveway must be redesigned to provide a one lane entrance on Wattle
St with an exit only to Garnet St. The driveway design must be setback to
maintain the existing mango tree to Wattle St to ensure its long term health.
Nature and Extent of Approved Use
3. This approval is for 1 x 3 bedroom unit and 3 x 2 bedroom units. The TV/Study
room is not permitted to be fully enclosed for use as a bedroom.
Building Height
4. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to pre-start meeting. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Street Identification
6. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Page 16 of 26
Section 17
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Building Appearance
7. All air conditioning units or other mechanical equipment must be located at
ground level, or otherwise fully enclosed or screened such that they are not
visible from the street frontages nor adjoining properties.
Fencing and Walls
8. Any street fencing must be set back an average of 1 metre from the front property
boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
9. The area of land between the fence and the front property boundary must be
densely landscaped to screen any fencing from the street.
Clothes Drying Areas
10. Each dwelling unit must be provided with access to an outdoor clothes line which
is screened from public view.
Protection of Privacy
11. To ensure privacy is protected between adjoining properties, the windows
located on the upper western building face of the building must either:
a. have a minimum window sill height or 1.5 metres above floor level;
b. be fitted with translucent glazing;
c. be fitted with a fixed external screen.
12. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the
Building Format Plan (or similar) to Council for compliance assessment.
13. All clauses and by-laws of the proposed Community Management Statement
must accord with the requirements of this Decision Notice.
Landscaping Works
14. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan Planning
Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in
particular:
a. the works shown on the approved Landscape Concept Plan using
predominately local native species;
b. The provision of 6 x 100L local native street trees to the road frontages
suitable for the location and sight lines.
15. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
16. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
Page 17 of 26
Section 18
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
ENGINEERING
External Works
17. A 2.0m wide concrete footpath must be provided within the road verge for the
entire length of the frontage of the site to Wattle Street. The path must generally
match with the existing grassed verge without causing a trip hazard. The works
must be undertaken in accordance with an Operational Works approval and must
include/address the following:
a. Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
Pathway Construction Details;
b. Be extended to smoothly tapered and join with the existing path along
Garnet Street.
Reinstatement Works
18. Any redundant driveway and/or kerb layback must be removed, and the kerb line
and verge area reinstated and landscaped to match the existing kerb and/or
verge treatments. Grassed verge areas to be reinstated must be provided with
100 mm topsoil and turf, and must be maintained by the developer until
established.
19. The redundant private pathway connection within the grassed verge of Garnet
Street must be removed, and verge area reinstated and landscaped to match the
verge treatments.
20.19. Any badly damaged kerb and channel along the frontage of the site must
be repaired to the reasonable satisfaction of Council’s representative.
Site Access and Driveways
21.20. A sealed one way access driveway must be provided from Wattle Street to
all parking and manoeuvring areas of the development with an exit only to Garnet
St. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-
049 and R-050 to grades prevent vehicles from scraping and/or bottoming
whilst also allowing for compliant grades for the footpath and pedestrians
movements along the footpath and the grassed verge without any step or
trip hazard.
Car Parking
22.21. Car parking must be provided within the site generally as shown on the
approved plans. The works must be undertaken in accordance with an
Operational Works approval and must be in compliance with the provisions of
AS/NZS 2890.1-2004 with allowance for standard vehicle to enter and leave the
site in a forward gear and with a minimum head clearance (headroom) at any
point of 2.2m.
23.22. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times
Page 18 of 26
Section 19
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Stormwater Drainage
24.23. The site must be provided with a stormwater drainage system connecting
to a lawful point/s of discharge in Garnet Street and/or Wattle Street. The works
must be undertaken in accordance with an Operational Works approval in
compliance with the relevant sections of Queensland Urban Drainage Manual
and supported by a detailed stormwater drainage design prepared and certified
by a suitably qualified and experienced Registered Professional Civil Engineer
(RPEQ).
25.24. The development of the site must not worsen existing drainage conditions
on other properties by diverting stormwater runoff or cause additional stormwater
ponding on any other property.
26.25. Stormwater runoff from the development must be disposed of on-site
without causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
27.26. All earthworks must be carried out in compliance with an Operational
Works Development Permit.
28.27. All earthworks and associated batters/retaining walls must be contained
entirely within the subject site unless written permission from the respective
landowner(s) is provided to Council.
29.28. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments, Council’s codes and relevant government regulations
and guidelines. Certification must be provided by an RPEQ and submitted to
Council prior to the issue of the Certificate of Classification for the building.
30.29. The development works must not adversely impact on the stability of the
subject site, any other property or private or public structure.
31.30. Earthworks and development works carried out on site must not affect the
structural integrity of any of the existing fences or structures that border the site.
Fences that are affected shall be replaced prior to the Building Certifier issuing
the Certificate of Classification.
Telecommunication Services
32.31. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Lost.
Page 19 of 26
Section 20
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Motion
Moved: Cr Jackson
Seconded: Cr Pardon
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 October 2018 regarding Application No. MCU18/0094 for a Development Permit for
Material Change of Use for Multiple Housing - Type 4 Conventional. (4 Dwelling Units)
situated at 15 Garnet St, Cooroy and:
A. Approve the application subject to the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
A10 F Ground – Site Plan, drawn by Morriarchi 3 July 2018
Architecture
A11 E Level 1 – Roof – Site Plan, drawn by Morriarchi 3 July 2018
Architecture
A12 C Townhouse Type A (3 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A13 C Townhouse Type B (2 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A14 A Landscape Plan, drawn by Morriarchi Architecture 3 July 2018
A20 E Elevations, drawn by Morriarchi Architecture 3 July 2018
A30 E Sections, drawn by Morriarchi Architecture 3 July 2018
A80 E Perspective Images, drawn by Morriarchi 3 July 2018
Architecture
SD-1 C Landscape Concept Plan, prepared by Project 18 May 2018
Urban
Nature and Extent of Approved Use
3. This approval is for 1 x 3 bedroom unit and 3 x 2 bedroom units. The TV/Study
room is not permitted to be fully enclosed for use as a bedroom.
Building Height
4. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
Page 20 of 26
Section 21
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to pre-start meeting. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Street Identification
6. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Building Appearance
7. All air conditioning units or other mechanical equipment must be located at
ground level, or otherwise fully enclosed or screened such that they are not
visible from the street frontages nor adjoining properties.
Fencing and Walls
8. Any street fencing must be set back an average of 1 metre from the front property
boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
9. The area of land between the fence and the front property boundary must be
densely landscaped to screen any fencing from the street.
Clothes Drying Areas
10. Each dwelling unit must be provided with access to an outdoor clothes line which
is screened from public view.
Protection of Privacy
11. To ensure privacy is protected between adjoining properties, the windows
located on the upper western building face of the building must either:
a. have a minimum window sill height or 1.5 metres above floor level;
b. be fitted with translucent glazing;
c. be fitted with a fixed external screen.
12. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the
Building Format Plan (or similar) to Council for compliance assessment.
13. All clauses and by-laws of the proposed Community Management Statement
must accord with the requirements of this Decision Notice.
Page 21 of 26
Section 22
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Landscaping Works
14. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan Planning
Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in
particular:
a. the works shown on the approved Landscape Concept Plan using
predominately local native species;
b. The provision of 6 x 100L local native street trees to the road frontages
suitable for the location and sight lines.
15. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
16. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
ENGINEERING
External Works
17. A 2.0m wide concrete footpath must be provided within the road verge for the
entire length of the frontage of the site to Wattle Street. The path must generally
match with the existing grassed verge without causing a trip hazard. The works
must be undertaken in accordance with an Operational Works approval and must
include/address the following:
a. Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
Pathway Construction Details;
b. Be extended to smoothly tapered and join with the existing path along
Garnet Street.
Reinstatement Works
18. Any redundant driveway and/or kerb layback must be removed, and the kerb line
and verge area reinstated and landscaped to match the existing kerb and/or
verge treatments. Grassed verge areas to be reinstated must be provided with
100 mm topsoil and turf, and must be maintained by the developer until
established.
19. The redundant private pathway connection within the grassed verge of Garnet
Street must be removed, and verge area reinstated and landscaped to match the
verge treatments.
20. Any badly damaged kerb and channel along the frontage of the site must be
repaired to the reasonable satisfaction of Council’s representative.
Site Access and Driveways
21. A sealed access driveway must be provided from Wattle Street to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
Page 22 of 26
Section 23
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-
049 and R-050 to grades prevent vehicles from scraping and/or bottoming
whilst also allowing for compliant grades for the footpath and pedestrians
movements along the footpath and the grassed verge without any step or
trip hazard.
Car Parking
22. Car parking must be provided within the site generally as shown on the approved
plans. The works must be undertaken in accordance with an Operational Works
approval and must be in compliance with the provisions of AS/NZS 2890.1-2004
with allowance for standard vehicle to enter and leave the site in a forward gear
and with a minimum head clearance (headroom) at any point of 2.2m.
23. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a
lawful point/s of discharge in Garnet Street and/or Wattle Street. The works must
be undertaken in accordance with an Operational Works approval in compliance
with the relevant sections of Queensland Urban Drainage Manual and supported
by a detailed stormwater drainage design prepared and certified by a suitably
qualified and experienced Registered Professional Civil Engineer (RPEQ).
25. The development of the site must not worsen existing drainage conditions on
other properties by diverting stormwater runoff or cause additional stormwater
ponding on any other property.
26. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
27. All earthworks must be carried out in compliance with an Operational Works
Development Permit.
28. All earthworks and associated batters/retaining walls must be contained entirely
within the subject site unless written permission from the respective landowner(s)
is provided to Council.
29. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments, Council’s codes and relevant government regulations
and guidelines. Certification must be provided by an RPEQ and submitted to
Council prior to the issue of the Certificate of Classification for the building.
30. The development works must not adversely impact on the stability of the subject
site, any other property or private or public structure.
31. Earthworks and development works carried out on site must not affect the
structural integrity of any of the existing fences or structures that border the site.
Fences that are affected shall be replaced prior to the Building Certifier issuing
the Certificate of Classification.
Page 23 of 26
Section 24
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Telecommunication Services
32. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Amendment
Moved: Cr Jurisevic
Seconded: Cr Stockwell
That condition 19 be deleted, and Item A and conditions 2 and 21 of the motion be amended
to read as follows:
A. Approve the application and grant a Preliminary Approval subject to with the following
conditions:
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table. unless otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
A10 F Ground – Site Plan, drawn by Morriarchi Architecture 3 July 2018
A11 E Level 1 – Roof – Site Plan, drawn by Morriarchi 3 July 2018
Architecture
A12 C Townhouse Type A (3 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A13 C Townhouse Type B (2 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A14 A Landscape Plan, drawn by Morriarchi Architecture 3 July 2018
A20 E Elevations, drawn by Morriarchi Architecture 3 July 2018
A30 E Sections, drawn by Morriarchi Architecture 3 July 2018
A80 E Perspective Images, drawn by Morriarchi Architecture 3 July 2018
SD-1 C Landscape Concept Plan, prepared by Project Urban 18 May 2018
Prior to the issue of a Development Permit for Material Change of Use, these
plans must be amended in accordance with the following:
a. The driveway must be redesigned to provide a one lane entrance on Wattle
St with an exit only to Garnet St. The driveway design must be setback to
maintain the existing mango tree to Wattle St to ensure its long term health.
19. The redundant private pathway connection within the grassed verge of Garnet
Street must be removed, and verge area reinstated and landscaped to match the
verge treatments.Deleted.
Page 24 of 26
Section 25
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Site Access and Driveways
21. A sealed one way access driveway must be provided from Wattle Street to all
parking and manoeuvring areas of the development with an exit only to Garnet
St. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-
049 and R-050 to grades prevent vehicles from scraping and/or bottoming
whilst also allowing for compliant grades for the footpath and pedestrians
movements along the footpath and the grassed verge without any step or
trip hazard.
Lost.
Committee Recommendation
Moved: Cr Jackson
Seconded: Cr Pardon
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 October 2018 regarding Application No. MCU18/0094 for a Development Permit for
Material Change of Use for Multiple Housing - Type 4 Conventional. (4 Dwelling Units)
situated at 15 Garnet St, Cooroy and:
A. Approve the application subject to the following conditions contained in the General
Committee Agenda dated 15 October 2018.:
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
Cr Stockwell voted against the motion.
Cr Jackson voted in favour of the motion.
6 NOOSA GYMNASTICS CLUB CAPITAL CONTRIBUTION PAYMENT AND NEW LEASE
Cr Wilkie declared a conflict of interest in this matter (as defined in section 175D of the Local
Government Act 2009) due to his role as Secretary of the Noosa Gymnastics Club. Cr Wilkie left the
meeting room for the debate and decision on this matter.
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Cr Pardon be appointed as Acting Chairperson of the meeting for this item.
Carried.
Page 25 of 26
Section 26
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Community Facilities Manager to the General Committee
Meeting dated 15 October 2018 and:
A. Authorise a one-off capital contribution payment of $100,000 to Noosa Gymnastics
Club to assist with the unexpected cost of rectifying the non-compliant fire booster
pump at the Bicentennial Community Centre.
B. Authorise the Chief Executive Officer to enter into a new lease with Noosa Gymnastics
Club for the expanded main hall with an initial term of 10 years and two further options
of five years each.
C. Apply the exception to the requirement for tendering of this lease under Section 236
(1) (b) (ii) of the Local Government Regulation 2012, as the site will be leased to a
community organisation.
Carried.
Cr Wilkie returned to the meeting and resumed the Chair.
7 CAPITAL PROGRAM DELIVERY STATUS - SEPTEMBER 2018
Committee Recommendation
Moved: Cr Glasgow
Seconded: Cr Jurisevic
That Council note the report by the Asset Planning Manager and the Infrastructure Planning,
Design and Delivery Manager to the General Committee Meeting dated 15 October 2018
providing an update on the projects being delivered throughout the 2018/19 Capital Program.
Carried.
8 FINANCIAL PERFORMANCE REPORT - SEPTEMBER 2018
Committee Recommendation
Moved: Cr Jackson
Seconded: Cr Stockwell
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 15 October 2018 outlining September 2018 year to date financial performance
against budget.
Carried.