2018-10-15 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-
049 and R-050 to grades prevent vehicles from scraping and/or bottoming
whilst also allowing for compliant grades for the footpath and pedestrians
movements along the footpath and the grassed verge without any step or
trip hazard.
Car Parking
22. Car parking must be provided within the site generally as shown on the approved
plans. The works must be undertaken in accordance with an Operational Works
approval and must be in compliance with the provisions of AS/NZS 2890.1-2004
with allowance for standard vehicle to enter and leave the site in a forward gear
and with a minimum head clearance (headroom) at any point of 2.2m.
23. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a
lawful point/s of discharge in Garnet Street and/or Wattle Street. The works must
be undertaken in accordance with an Operational Works approval in compliance
with the relevant sections of Queensland Urban Drainage Manual and supported
by a detailed stormwater drainage design prepared and certified by a suitably
qualified and experienced Registered Professional Civil Engineer (RPEQ).
25. The development of the site must not worsen existing drainage conditions on
other properties by diverting stormwater runoff or cause additional stormwater
ponding on any other property.
26. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
27. All earthworks must be carried out in compliance with an Operational Works
Development Permit.
28. All earthworks and associated batters/retaining walls must be contained entirely
within the subject site unless written permission from the respective landowner(s)
is provided to Council.
29. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments, Council’s codes and relevant government regulations
and guidelines. Certification must be provided by an RPEQ and submitted to
Council prior to the issue of the Certificate of Classification for the building.
30. The development works must not adversely impact on the stability of the subject
site, any other property or private or public structure.
31. Earthworks and development works carried out on site must not affect the
structural integrity of any of the existing fences or structures that border the site.
Fences that are affected shall be replaced prior to the Building Certifier issuing
the Certificate of Classification.
Page 23 of 26