Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file: it may take a few minutes
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
column 1 column 2
Specific Outcomes Probable solutions
Sloping sites
Including amendments 3 July 2017
The Noosa Plan
O14 On sloping sites, buildings and structures are S14.1 Buildings are of split level design that
designed to maximise the use of natural slope and step down the slope or have suspended floor
minimise the need for cut and fill. construction; (See Figure 4-1 below)
AND
S14.2 Cut or fill is less than 2m in depth
relative to natural ground surface;
AND
S14.3 The distance between the ground and
the lowest part of the floor of the building
does not exceed 3m to avoid large under
building areas.
Figure 4.1 Design for sloping site
(suspended floor)
4.10 Environment, conservation and recreation
Environment & cultural heritage values
O15 There are no significant adverse effects on No solution provided
the biodiversity, natural vegetation, native wildlife,
habitats, landscape quality, water quality or Editor’s note
cultural heritage values, including those related
to— PSP24 – Effluent Disposal details
a) changes to natural drainage; requirements for the design and siting of
b) disturbance to any of the wetland systems; effluent disposal systems where located
c) management of landslide and fire risk; outside a sewerage service area.
d) erosion and the transport of sediments off Compliance with PSP24 will be
site; considered as part of Council’s
e) unmanaged public access; assessment of the plumbing and drainage
57
f) effluent disposal ; application.
g) changes to fauna habitat and behaviour; and
h) disturbance of buildings and features,
including natural features, of cultural heritage Advisory note
significance. PSP24 – Effluent Disposal details
requirements for the design and siting of
effluent disposal systems where located
outside a sewerage service area. Compliance
with PSP24 will be considered as part of
Council’s assessment of the plumbing and
drainage application.
57
Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.
4-43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.