Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                      column 1                                                        column 2
                  Specific Outcomes                                               Probable solutions
Sloping sites




                                                                                                                                        Including amendments 3 July 2017
                                                                                                                       The Noosa Plan
O14 On sloping sites, buildings and structures are                S14.1 Buildings are of split level design that
designed to maximise the use of natural slope and                 step down the slope or have suspended floor
minimise the need for cut and fill.                               construction; (See Figure 4-1 below)
                                                                  AND
                                                                  S14.2 Cut or fill is less than 2m in depth
                                                                  relative to natural ground surface;
                                                                  AND
                                                                  S14.3 The distance between the ground and
                                                                  the lowest part of the floor of the building
                                                                  does not exceed 3m to avoid large under
                                                                  building areas.

                                                                  Figure 4.1 Design for sloping site
                                                                  (suspended floor)




4.10       Environment, conservation and recreation
Environment & cultural heritage values
O15 There are no significant adverse effects on                   No solution provided
the biodiversity, natural vegetation, native wildlife,
habitats, landscape quality, water quality or                     Editor’s note
cultural heritage values, including those related
to—                                                               PSP24 – Effluent Disposal details
a)    changes to natural drainage;                                requirements for the design and siting of
b)    disturbance to any of the wetland systems;                  effluent disposal systems where located
c)    management of landslide and fire risk;                      outside a sewerage service area.
d)    erosion and the transport of sediments off                  Compliance with PSP24 will be
      site;                                                       considered as part of Council’s
e)    unmanaged public access;                                    assessment of the plumbing and drainage
                        57
f)    effluent disposal ;                                         application.
g)    changes to fauna habitat and behaviour; and
h)    disturbance of buildings and features,
      including natural features, of cultural heritage              Advisory note
      significance.                                                 PSP24 – Effluent Disposal details
                                                                    requirements for the design and siting of
                                                                    effluent disposal systems where located
                                                                    outside a sewerage service area. Compliance
                                                                    with PSP24 will be considered as part of
                                                                    Council’s assessment of the plumbing and
                                                                    drainage application.




57
  Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.



                                                           4-43
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.