Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file: it may take a few minutes
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
b) Carrying out building work if demolition, relocation or removal of a building and not
Including amendments to 3 July 2017
associated with a material change of use;
The Noosa Plan
c) Placing an advertising device on premises;
d) Reconfiguring a lot;
e) Carrying out operational work associated with a material change of use where a
Development Permit for material change of use has been issued;
f) Carrying out operational work associated with reconfiguring a lot where a
Development Permit for reconfiguring a lot has been issued;
g) Carrying out operational work for the construction of a driveway for a Detached
House;
h) Carrying out operational works for prescribed tidal works;
i) Excavating or filling of land not associated with material change of use; and
j) Other.
5.3 Relevant assessment criteriaAssessment benchmarks for for self-
assessable development and assessable development and
requirements for accepted development
5.3.1 The relevant assessment criteriarelevant assessment benchmarks for development are
referred to in column 3 of Ttables 5.1 to 5.6.
5.3.2 For self-assessableaccepted developmendevelopment subject to requirements t and
development requiring code assessment, the relevant assessment criteriaassessment
4
benchmarks and requirements for accepted development are the applicable codes .
5.3.3 For impact assessableimpact assessment development, the development is assessed
against the whole planning scheme.
5.4 Consistent and inconsistent uses
5.4.1 In accordance with the following sections identified for the respective zones, a defined
use or use class is noted in column 1 of the assessment table for making a material
change of use for the relevant zone as either a consistent use or an inconsistent use in
that zone—
a) Division 12 —Detached Housing Zone (Sections 5.11 and 5.12);
b) Division 13 — Neighbourhood Centre Zone (Sections 5.15 and 5.16);
c) Division 14 — Rural Settlement Zone (Sections 5.19 and 5.20);
d) Division 15 — Rural Zone (Sections 5.23 and 5.24); and
e) Division 16 — Open Space Conservation Zone (Sections 5.27 and 5.28).
4
Assessment criteria benchmarks will include matters prescribed by Sections 3.5.4 (Code Assessment) and 3.5.5 (Impact
Assessment) of IPA in addition to the provisions of this planning scheme.
5-4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.