Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file: it may take a few minutes
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Column 1 Column 2 Column 3
Including amendments to 3 July 2017
Type of development Assessment Relevant assessment
The Noosa Plan
categoryCategories of criteriaAssessment benchmarks
60
development and assessment for assessable development -
applicable code if development
is self-assessable or requires
code assessmentand
requirements for accepted
development
Excavation or filling not Self assessableAccepted If self-assessableaccepted
associated with a development subject to development subject to
67
material change of use requirements if— requirements—
for the purpose of a) Column 2 of Table 14-52 of the
constructing a dam a) Rural Settlement Zone and Earthworks Code; and
3
involving less than 500m of b) Column 2 of Table 14-53 of the
material; or Erosion and Sediment Control
b) Rural Zone where the lot is Code
5ha or greater; or
c) Rural Zone where the lot is
less than 5ha and involving
3
less than 500m of material.
If code assessablecode
Code assessableCode assessment —
assessment if— a) Earthworks Code; and
a) not complying with column 2 b) Erosion and Sediment Control
of Table 14-52 of the Code.
Earthworks Code; or
b) Rural Settlement Zone and
3
involving 500m or more of
material; or
c) Rural Zone where the lot is
less than 5ha and involving
3
500m or more of material;
or
d) in all other zones.
Division 14—General Provisions for the Cooroy & Lake
Macdonald Locality Code
6.5 Cooroy & Lake Macdonald Locality Code
The following provisions comprise the Cooroy & Lake Macdonald Locality Code—
6.5.1 Compliance with the Cooroy & Lake Macdonald Locality Code (Section 6.7);
6.5.2 Overall outcomes for the Cooroy & Lake Macdonald Locality including for each zone in
the locality (Division 15);
6.5.3 Specific outcomes and probable solutions for the Cooroy & Lake Macdonald Locality
(Division 16);
6.5.4 Specific outcomes and probable solutions for each zone in the Cooroy & Lake Macdonald
Locality (Divisions 17 to 26).
6-37
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.