Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                          column 1                                            column 2
                 Including amendments 3 July 2017




                                                                     Specific Outcomes                                    Probable solutions
The Noosa Plan




                                                    Noosa Trail Network
                                                    O21 A comprehensive network of bridle trails            S21.1 Development includes linkages to or
                                                    and pedestrian and bicycle linkages is                  between existing or future components of the
                                                    established, enhanced and protected                     Noosa Trail Network, as indicated in Schedule
                                                    incorporating road reserves, State forests,             5 – Map 2;
                                                    Council owned land and private lands consistent         AND
                                                    with the lifestyle and outdoor recreation needs of      S21.2 Development does not have an adverse
                                                    Noosa’s residents and visitors;                         impact on the access functions of the Noosa
                                                                                                            Trail Network, as indicated in Schedule 5 –
                                                                                                            Map 2, including severing of existing or future
                                                                                                            linkages;
                                                                                                            OR
                                                                                                            S21.3 Alternative linkages to those indicated
                                                                                                            in Schedule 5 – Map 2 are provided;
                                                                                                            AND
                                                                                                            S21.4 Linkages to the Noosa Trail Network
                                                                                                            are designed and constructed in accordance
                                                    AND                                                     with—
                                                                                                            a) Australian Standard 2156.1 Walking
                                                                                                                  Tracks Part 1: Classification and Signage
                                                                                                                  to a minimum of a Class 4 Standard; and
                                                                                                            b) Australian Standard 2156.2 Walking
                                                                                                                  Tracks Part 2: Infrastructure Design;
                                                    O22 The Noosa Trail Network in the locality is          S22.1 No solution provided
                                                    supported by overnight camping facilities, home-
                                                    hosted accommodation and signage, allowing
                                                    local residents and visitors to experience the
                                                    natural values of the area and to access key
                                                    destinations including—
                                                    a)     the town of Cooroy;
                                                    b)     Lake Macdonald;
                                                    c)     the Botanic Gardens; and
                                                    d)     State forests, conservation parks and other
                                                           recreation facilities in the locality.
                                                    Pedestrian and bicycle pathways
                                                    O23 Safe and convenient pedestrian and bicycle          S23.1 Pedestrian and bicycle pathways are
                                                    pathways are provided and retained between and          provided and retained where indicated in the
                                                    around key destinations, including—                     Priority Infrastructure Plan in Part 15;
                                                    a) between Cooroy and Tewantin;                         AND
                                                    b) between Cooroy and the Noosa Botanical               S23.2 Contributions toward pedestrian and
                                                        Gardens; and                                        bicycle pathways are provided in accordance
                                                    c) within and around the town of Cooroy.                with the Priority Infrastructure Plan in Part 15.




                                                                                                     6-50
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.