Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

         Division 2—General provisions for assessment tables




                                                                                                                          Including amendments to 3 July 2017
                                                                                                         The Noosa Plan
8.2          Assessment categories and types of developmentCategories of
             development and assessment
             The assessment categoriescategories of development and assessment for each type of
             development are identified in column 2 of Tables 8.1 to 8.10. The types of development
             are as follows—

8.2.1        Tables 8.1 to 8.9 – making a material change of use for a defined use, another use in a
             defined use class or an undefined use, listed in column 1; or

8.2.2        Table 8.10 –development other than a material change of use, listed in column 1 and
             including—

        a)       Carrying out building work not associated with a material change of use;

        b)       Carrying out building work if demolition, relocation or removal of a building and not
                 associated with a material change of use;

        c)       Placing an advertising device on premises;

        d)       Reconfiguring a lot;

        e)       Carrying out operational work associated with a material change of use where a
                 Development Permit for material change of use has been issued;

        f)       Carrying out operational work associated with reconfiguring a lot where a
                 Development Permit for reconfiguring a lot has been issued;

        g)       Carrying out operational work for the construction of a driveway for a Detached
                 house;

        h)       Carrying out operational works for prescribed tidal works;

        i)       Excavating or filling of land not associated with a material change of use; and

        j)       Other.




                                                    8-5
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.