Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

     Column 1                         Column 2                               Column 3




                                                                                                                      Including amendments to 3 July 2017
Type of development                  Assessment                        Relevant assessment




                                                                                                     The Noosa Plan
                                categoryCategories of           criteriaAssessment benchmarks
                                                                                               55
                             development and assessment           for assessable development
                                                                - applicable code if development
                                                                  is self-assessable or requires
                                                                       code assessmentand
                                                                    requirements for accepted
                                                                           development
                                               3
                                 involving 100m or more of
                                 material.

Excavation or filling not   Self-assessableAccepted            If self-assessableaccepted
associated with a           development subject to             development subject to
                                        62
material change of use      requirements if—                   requirements—
for the purpose of                                             a) Column 2 of Table 14-52 of
constructing a dam          a)   Rural Settlement Zone and            the Earthworks Code; and
                                                          3
                                 involving less than 500m of   b) Column 2 of Table 14-53 of
                                 material; or                         the Erosion and Sediment
                            b)   Rural Zone where the lot is          Control Code
                                 5ha or greater; or
                            c)   Rural Zone where the lot is   If code assessablecode
                                 less than 5ha and involving   assessment —
                                                  3
                                 less than 500m of material.   a) Earthworks Code; and
                                                               b) Erosion and Sediment Control
                            Code assessableCode                      Code.
                            assessment if—
                            a) not complying with column 2
                                of Table 14-52 of the
                                Earthworks Code; or
                            b) Rural Settlement Zone and
                                               3
                                involving 500m or more of
                                material; or
                            c) Rural Zone where the lot is
                                less than 5ha and involving
                                      3
                                500m or more of material;
                                or
                            d) in all other zones.


   Division 13—General provisions for the Mary River Catchment
                             Locality Code

8.5       Mary River Catchment Locality Code

          The following provisions comprise the Mary River Catchment Locality Code—

8.5.1     compliance with the Mary River Catchment Locality Code (Section 8.7);

8.5.2     overall outcomes for the Mary River Catchment Locality, including for each zone in the
          locality (Division 14);

8.5.3     specific outcomes and probable solutions for the Mary River Catchment Locality (Division
          15); and




                                                8-33
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.