Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions
The Noosa Plan
Noosa Trail Network
O17 A comprehensive network of bridle trails and S17.1 No solution provided
pedestrian and bicycle links is established,
enhanced and protected incorporating road
reserves, State forests, Council owned land and
private lands consistent with the lifestyle and
outdoor recreation needs of Noosa’s residents
and visitors;
AND
O18 Existing and future pedestrian, bridle trail or S18.1 Development includes linkages to or
bicycle linkages are retained as part of a Shire between existing or future components of the
wide trail network. Noosa Trail Network, as indicated in Schedule
5 – Map 2;
AND
S18.2 Development does not have an adverse
impact on the access functions of the Noosa
Trail Network as indicated in Schedule 5 –
Map 2, including severing of existing or future
linkages; or
S18.3 Alternative linkages to those indicated
in Schedule 5 – Map 2 are provided;
AND
S18.4 Linkages to the Noosa Trail Network
are designed and constructed in accordance
with—
a) Australian Standard 2156.1 Walking
Tracks Part 1: Classification and Signage
to a minimum of a Class 4 Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2: Infrastructure Design.
Pedestrian and bicycle pathways
O19 Safe and convenient pedestrian and bicycle S19.1 Pedestrian and bicycle pathways are
pathways are provided and retained between and provided and retained where indicated in the
around key destinations including— Priority Infrastructure Plan in Part 15;
a) within Pomona, including the Pomona State AND
Primary School, Pomona State High School, S19.2 Contributions toward pedestrian and
the town centre, showgrounds and sport bicycle pathways are provided in accordance
and recreation facilities; and with the Priority Infrastructure Plan in Part 15.
b) within Cooran, including Cooran State
Primary School, sporting and associated
facilities at Railway Road and Bridge Street,
and the village centre.
Division 16—Specific Outcomes and Probable Solutions for the
Detached Housing Zone
Table 8.11
column 1 column 2
Specific Outcomes Probable solutions
8-46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.