Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions
The Noosa Plan
d) Industrial business Type 3;
e) Retail business Type 1 if a roadside stall;
f) Retail business Type 3;
g) Emergency service Type 2;
h) Open space Type 2;
i) Detached house;
j) Community residence;
k) Ancillary dwelling unit; and
l) Visitor accommodation Types 1, 2 or 3.
8.35 Inconsistent uses
O64 The following defined uses and use classes
are inconsistent uses and are not located in the No solution provided
Rural Zone—
a) Commercial business Types 1 or 2;
b) Entertainment and dining business;
c) Industrial business Type 1;
d) Retail business Type 1 if not a roadside stall
e) Retail business Types 2, 4, 5, 6 or 7;
f) Education;
g) Emergency service Type 1;
h) Open space Type 1;
i) Wellbeing;
j) All Infrastructure Uses;
k) Multiple housing ; and
l) Visitor accommodation Type 4.
8.36 Built form
Sloping sites & ridgelines
O65 Development on sloping sites— S65.1 Buildings and associated
a) is responsive to the natural topography of the accessways are not constructed on land
site and minimises the need for cut and fill with a slope greater than 1 in 4 (25%);
(eg. by stepping down the site or using
suspended floor construction);
b) does not visually dominate the hill slope or
interrupt the skyline;
c) is integrated with the natural site
characteristics including vegetation; AND
AND S66.1 Buildings present no more than 2
O66 The landscape character and visual amenity storeys at any one point when viewed from
quality of hill slopes and ridgelines are retained. the road or other public space;
AND
S66.2 On properties with a slope exceeding
1 in 4 (25%) or located on ridgelines visible
from the major road network the roofline of
buildings should not protrude above the
ridgeline or tree canopy.
Editor’s note:
On visually prominent hill slopes or ridgelines
buildings should be predominantly finished in
8-63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.