Column 1 Column 2 Column 3
Including amendments to 3 July 2017
Type of development Assessment Relevant assessment
The Noosa Plan
categoryCategories of criteriaAssessment benchmarks for
50
development and assessable development -
assessment applicable code if development is
self-assessable or requires code
assessmentand requirements for
accepted development
work for reconfiguring a assessment assessment —
lot where Development a) Landscaping Code; and
Permit for reconfiguring b) Engineering Works Codes
a lot has been issued
Carrying out operational Self-assessableAccepted If self-assessableaccepted
work for the development subject to development subject to
construction of a requirements requirements —
driveway for a Column 2 of Table 14.48 of the
Detached house or Code assessableCode Detached House Driveways Code
Community assessment if not complying with
55
residence column 2 of Table 14-48 of If code assessablecode
Detached House Driveways Code assessment —
Detached House Driveways Code.
Carrying out operational Code assessableCode If code assessablecode
works for prescribed assessment assessment —
56
tidal works a) Noosa Heads Locality Code;
and
b) Table 14.64 of Watercourses
57
Works Code
Excavation or filling of Self-assessableAccepted If self-assessableaccepted
land not associated with development subject to development subject to
58
a material change of requirements if— requirements —
use (not for the purpose a) in either the Detached a) Column 2 of Table 14-52 of the
of constructing a dam) Housing Zone or the Semi- Earthworks Code; and
Attached Housing Zone and b) Column 2 of Table 14-53 of the
3
involving less than 10m of Erosion and Sediment Control
material; or Code
b) in all other zones and
3
involving less than 100m of If code assessablecode
material. assessment —
a) Earthworks Code; and
Code assessableCode b) Erosion and Sediment Control
assessment if— Code.
a) not complying with Column 2
of Earthworks Code; or
b) in either the Detached
Housing Zone and the Semi-
Attached Housing Zone and
3
involving 10m or more of
material; or
c) in all other zones and
3
involving 100m or more of
material.
Excavation or filling of Code assessableCode If code assessablecode
55
A separate operational works approval is not required where the construction of a driveway for a detached house is
associated with a material change of use.
56
Prescribed tidal works is defined in Schedule 4A of the Coastal Protection and Management Regulation 2003 and include
tidal works outside the Noosa Waters lock system.
57
The Prescribed Tidal Works Code under Schedule 4A of the Coastal Protection and Management Regulation 2003 also
applies.
58
This applies only once to any premises.
9-29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.