Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Column 1 Column 2 Column 3
Type of development Assessment Relevant assessment
Including amendments to 3 July 2017
categoryCategories of criteriaAssessment benchmarks for
The Noosa Plan
development and
assessable development -
39
assessment
and requirements for accepted
developmentapplicable code if
development is
self-assessable or requires code
assessment
Carrying out operational Self-assessableAccepted If self-assessableaccepted
work for the development subject to development subject to
construction of a requirements requirements—
driveway for a Column 2 of Table 14.48 of the
Detached house or Code assessableCode Detached House Driveways Code
Community assessment if not complying with
44
residence column 2 of Table 14.48 of If code assessablecode
Detached House Driveways Code assessment—
Detached House Driveways Code.
Carrying out operational Code assessableCode If code assessablecode
works for prescribed assessment assessment—
45
tidal works a) Noosa North Shore Locality
Code; and
b) Table 14.64 of Watercourses
46
Works Code
Excavation or filling of Self-assessableAccepted If self-assessableaccepted
land not associated with development subject to development subject to
47
a material change of requirements if— requirements- —
use (not for the purpose a) Detached Housing Zone and Column 2 of Table 14-52 of
3
of constructing a dam) involving less than 10m of Earthworks Code; and
material; or d)a)Column 2 of Table 14-53 of the
b) in all other zones and Erosion and Sediment Control
3
involving less than 100m of Code
material.
If code assessablecode
Code assessableCode assessment—
assessment if— a) Earthworks Code; and
a) not complying with column 2 b) Erosion and Sediment Control
of the Earthworks Code; or Code.
b) Detached Housing Zone and
3
involving 10m or more of
material; or
c) in all other zones and
3
involving 100 m or more of
material.
44
A separate operational works approval is not required where the construction of a driveway for a detached house or
community residence is associated with a material change of use.
45
Prescribed tidal works is defined in Schedule 4A of the Coastal Protection and Management Regulation 2003 and
includes tidal works outside the Noosa Waters lock system.
46
The Prescribed Tidal Works Code under Schedule 4A of the Coastal Protection and Management Regulation 2003 also
applies.
47-48
This applies only once to any premises.
10-19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.