Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

12.3       Relevant assessment criteria for self-assessable development and




                                                                                                                                   Including amendments to 3 July 2017
           assessable development Assessment benchmarks for assessable




                                                                                                                       The Noosa Plan
           development and requirements for accepted development

12.3.1     The relevant assessment criteriabenchmarks are referred to in column 3 of tables 12.1 to
           12.11.

12.3.2     For self-assessableaccepted development development subject to requirements and
           development requiring code assessment, the relevant assessment criteriabenchmarks
                                   3
           are the applicable codes .

12.3.3     For impact assessableimpact assessment development, development is assessed
           against the whole planning scheme.

12.4       Consistent and inconsistent uses in zones

12.4.1     In accordance with the following sections identified for the respective zones, the defined
           use or use class is noted as a consistent use or an inconsistent use in column 1 of the
           assessment table for making a material change of use for the relevant zone—

           a)      Division 17 — Detached Housing Zone (Sections 12.11 and 12.12);

           b)      Division 18 —Semi-Attached Housing Zone (Sections 12.14 and 12.15);

           c)      Division 19 — Attached Housing Zone (Sections 12.18 and 12.19);

           d)      Division 20 — Neighbourhood Centre Zone (Sections 12.22 and 12.23);

           e)      Division 21 — Business Centre Zone (Sections 12.26 and 12.27);

           f)      Division 22 — Community Services Zone (Sections 12.30 and 12.31);

           g)      Division 23 — Rural Settlement Zone (Sections 12.33 and 12.34);

           h)      Division 24 — Rural Zone (Sections 12.36 and 12.37);

           i)      Division 25 — Open Space Recreation Zone (Sections 12.40 and 12.41); and

           j)      Division 26 — Open Space Conservation Zone (Sections 12.44 and 12.45).




3
 Assessment criteriabenchmarks will include matters prescribed by Sections 3.5.4 (Code Assessment) and 3.5.5 (Impact
Assessment) of IPA in addition to the provisions of this planning scheme.



                                                         12-5
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.