Skip to the record
Beware of cheap imitations.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                       column 1                                                  column 2
                  Specific outcomes                            Probable solutions (if code assessment)




                                                                                                                            Including amendments to 3 July 2017
          in riparian zones;                                     watercourse for recreational purposes;




                                                                                                                The Noosa Plan
c)        maintaining wildlife corridors along               OR
          watercourses and drainage lines for                S5.2 Where constructing a Detached house
          native fauna movement;                             or Community residence and on an allotment
                                                             situated wholly within the Riparian Buffer Area,
d)        avoiding edge effects and incompatible
                                                             a)    fronting the Noosa River – development
          uses in riparian zones;
                                                                   is setback a minimum of 40m from mean
e)        maintaining bank stability by minimising                 high water spring or as otherwise
          bank erosion and slumping;                               prescribed by the Environmental
f)        maintaining water quality by filtering                   Protection Agency’s Erosion Prone Area
                                                                          13
          sediments, nutrients and other                           Maps;
          pollutants; and                                    b)    not fronting the Noosa River –
g)        removing undesirable plant species and                   development is located outside the
          replacing them with vegetation of local                  riparian zone and setback a suitable
          origin;                                                  distance from the watercourse having
                                                                   regard to the development constraints of
                                                                   the property and the need to protect
                                                                   environmental and riparian values;
                                                             OR
                                                             S5.3 For Animal husbandry on premises in
                                                             the Rural Zone—
                                                             a)    stock proof fencing is installed along
                                                                   watercourses at a distance of no less
                                                                   than 10m from the top of the bank;
                                                             b)    stock watering points are located no less
                                                                   than 15m away from the top of the bank
                                                                   of watercourses; and
                                                             c)    stock crossing points across
                                                                   watercourses are defined and controlled
                                                                   with stock proof fencing,
                                                                   to prevent stock from damaging riparian
                                                                   vegetation or banks to watercourses;
                                                             OR
                                                             S5.4 Recreational facilities (including
                                                             playgrounds, pergolas, barbeques etc) are
                                                             setback a minimum of 30m from the top of the
                                                             bank of a watercourse and 10m from the top of
                                                             the bank of a drainage line;
                                                             OR
                                                             S5.5 For Forestry uses the cultivated area is
                                                             separated from watercourses by a distance not
                                                             less than the distances identified below,
                                                             measured from high water mark or the top of
                                                             the bank, whichever is the greater distance—
                                                                       Feature                Distance
                                                              Stream order 1 or 2               5m
                                                              Stream order 3 or 4              10 m
                                                              Stream order greater than 4       20 m

                                                             AND
                                                             S5.6 Where Forestry is carried out on that
                                                             part of premises indicated as Riparian Buffer
                                                             Area and outside the separation distances

13
     The Erosion Prone Area map for the Noosa River is reproduced in Schedule 5.


                                                         13-11
                                                  Biodiversity Overlay
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.