Column 1 Column 2 Column 3
Type of Development Categories of development Assessment benchmarks for
35
Including amendments to 3 July 2017
and assessment assessable development
The Noosa Plan
and requirements for
accepted development
c) excavating land within
the gas pipeline
easement.
Coastal Protection Areas
Carrying out building work Accepted development if the If accepted development – no
where not associated with a criteria for code assessment assessment benchmarks apply
material change of use, except does not apply
demolition work
Code assessment if within a If code assessment –
Coastal Protection Area Natural Resources Overlay
identified on Overlay Map Code
OM4.5
All Natural Hazards and Natural Resources Overlays
Other Accepted development from If accepted development – no
overlay assessment benchmarks apply
Figure 13.2 — Works that may disturb acid sulfate soils and may require assessment
Surface elevation is greater
Surface elevation > 5 m AHD than 5 m AHD and less than 20 Surface elevation is > 20 m
Filling or excavation may be m AHD AHD
AHD assessable Excavation may be assessable
+20
Excavations of <100 m3 from
Filling or
below 5 m AHD are not
excavation is not
assessable
assessable.
+8
+7
+6
3
+5 Filling > 500 m and average > 100m3
depth of > 0.5 m is
+4 assessable.
+3 Excavations above 5 m AHD
are not assessable.
+2
+1
0m If excavation is > 100 m3 it is
-1 assessable
-2
-3
13-37
Natural Hazards and Natural Resources Overlays
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.