                                                                          column 1                                                     column 2
                                                                      Specific outcomes                                    Acceptable solutions (if accepted
            Including amendments to 3 July 2017
The Noosa Plan



                                                                                                                                    development )
                                                                                                                        Probable solutions (if code assessment)
                                                                                                                       c)       the community infrastructure will not
                                                                                                                                be adversely affected by landslides
                                                                                                                                originating on sloping land above the
                                                                                                                                    39
                                                                                                                                site .
                                                                                               40
                                                  Table 13.9 Bushfire hazard areas
                                                                       column 1                                                         column 2
                                                                   Specific Outcomes                                                Probable solutions
                                                  13.33       Effects of use and works
                                                  New Uses
                                                  O4 The proposed use does not compromise                        S4.1 The use is sited on land that is not in a
                                                                                                                                        41
                                                  the safety of people or property from bushfire.                Bushfire Hazard Area ;
                                                                                                                 OR
                                                                                                                 S4.2 The use is sited on land that is determined
                                                                                                                 as low bushfire risk by a site specific bushfire
                                                                                                                                      42
                                                                                                                 hazard assessment;
                                                  Protection of Infrastructure and Community
                                                  Uses
                                                  O5 Community Uses and Infrastructure Uses,                     S5.1 Community Uses and Infrastructure Uses
                                                  including that identified below, are able to                   are not located in Bushfire Hazard Area ;
                                                  function effectively during and immediately                    OR
                                                  after bushfire events—                                         S5.2 Building work will not involve more than an
                                                                                                                                2
                                                  a) Emergency service facilities;                               additional 20m of gross floor area to an existing
                                                  b) Hospitals;                                                  building;
                                                  c) Education Type 4 uses, including stores                     OR
                                                      for valuable records or items of historic or               S5.3 Where located in a Bushfire Hazard Area ,
                                                      cultural significance; and                                 uses are designed to function effectively during
                                                  d) Service and utility uses, including                         and immediately after bushfire events and have
                                                                                                                                                                43
                                                      electricity substations, major electrical                  direct access to low hazard evacuation routes .
                                                      depots and water treatment plants.




                                                  39
                                                     PSP1 details information Council may request including the preparation of a site specific geotechnical analysis prepared
                                                  by a registered professional to demonstrate the achievement of the solution to the satisfaction of the Council.
                                                  40
                                                     In accordance with Section 12 of the Building Regulation 2006, any building assessment work in a designated bush fire
                                                  prone area must comply with the bushfire protection provisions of the BCA. Land shown as Bushfire Hazard Area on the
                                                  overlay maps is designated as the bushfire prone area for the purposes of the Building Regulations 2006. The bushfire
                                                  hazard area includes land covered by the very high, high and medium bushfire hazard areas as well as the buffer area
                                                  category on the overlay maps.
                                                  41
                                                     If probable solution S4.1 or S4.2 is complied with no further action is required. PSP1 details information Council may
                                                  request to determine whether or not the site is in a Bushfire Hazard Area, as well as information relating to the preparation a
                                                  Bushfire Management Plan. Appendix 9 of the SPP Guidelines: Mitigating the Adverse Impacts of Flood, Bushfire and
                                                  Landslide provides more information on Bushfire Management Plans.
                                                  42
                                                     A site specific bushfire hazard assessment is necessary to demonstrate that although the site is identified within a
                                                  Bushfire Hazard Area, the bushfire risk is low as per PSP1 detailing the site specific assessment of bushfire risk prepared
                                                  in accordance with Appendix 3 of the SPP Guidelines: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide.
                                                  43
                                                     PSP1 details information Council may request for determining whether or not the site is in a Bushfire Hazard Area, as well
                                                  as information relating to the preparation a Bushfire Management Plan. Appendix 9 of the SPP Guidelines: Mitigating the
                                                  Adverse Impacts of Flood, Bushfire and Landslide provides more information on Bushfire Management Plans.

                                                                                                            13-40
                                                                                        Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.