Skip to the record
Search everything, all in one place.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                  Table 13.10 Flood Hazard areas
            Including amendments to 3 July 2017




                                                                         column 1                                                    column 2
The Noosa Plan



                                                                     Specific Outcomes                                           Probable solutions
                                                  13.38      Flood Plain Protection, Immunity and Safety
                                                  Hazardous materials                                        S14.1 Materials manufactured or stored on-site
                                                  O14 Development avoids the release of                      are not hazardous or noxious, or comprise
                                                  hazardous materials into floodwaters and the               materials that may cause a detrimental effect on
                                                  environment.                                               the environment if discharged in a flood event; or

                                                                                                             S14.2 Structures used for the manufacture or
                                                                                                             storage of hazardous materials are—
                                                                                                             a) located above the defined flood level; or
                                                                                                             b) designed to prevent the intrusion of
                                                                                                                             48
                                                                                                                  floodwaters .

                                                  Essential network infrastructure
                                                  O15 Essential network infrastructure (e.g.                 S15.1 Components of the essential network
                                                  electricity, water supply, sewerage and                    infrastructure that are likely to fail or may result in
                                                  telecommunications) maintains effective                    contamination when affected by flood water—
                                                  function during and immediately after flood                a) comply with Table 13.12; or
                                                  events.                                                    b) are designed and constructed to exclude
                                                                                                                  water inundation or infiltration and resist
                                                                                                                  hydrostatic and hydrodynamic forces as a
                                                                                                                  result of inundation.
                                                  O16 Community Uses and Infrastructure Uses                 S16.1 Community Uses and Infrastructure
                                                  are able to function effectively during and                Uses are sited and constructed to ensure that
                                                  immediately after flood events.                            floor levels comply with flood immunity
                                                                                                             requirements specified in Table 13.12;

                                                                                                             OR

                                                                                                             S16.2 Essential community infrastructure which
                                                                                                             is located below the specified flood immunity
                                                                                                             requirements—
                                                                                                             a)      is designed and constructed to function
                                                                                                                     effectively during and immediately after the
                                                                                                                     recommended flood level flood event; and

                                                                                                             b)      has an emergency rescue area above the
                                                                                                                     probable maximum flood if it is for
                                                                                                                     emergency services (including emergency
                                                                                                                     shelters, police facilities, hospitals and
                                                                                                                     associated facilities).




                                                  48
                                                    Refer to the Work Health and Safety Act 2011 and associated Regulation and Guidelines, the Environmental Protection
                                                  Act 1994 and the relevant building assessment provisions under the Building Act 1975 for requirements related to the
                                                  manufacture and storage of hazardous substances.

                                                                                                         13-46
                                                                                     Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.