Skip to the record
Beware of cheap imitations.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                                                   58
                                                  Table 13.19 Areas in proximity to gas pipelines
            Including amendments to 3 July 2017




                                                                            column 1                                                        column 2
The Noosa Plan



                                                                        Specific Outcomes                                               Probable solutions
                                                  13.48         Effects of uses and works
                                                  General
                                                  O16 Adequate separation is provided between the                        S16.1 The use does not result in an
                                                  use or works and the gas pipeline.                                     increase in the number of people living or
                                                                                                                         congregating within 200m of the gas pipeline
                                                                                                                         shown on Overlay Maps OM3.5 or OM5.5;
                                                                                                                         AND
                                                                                                                         S16.2 The use does not involve the storage
                                                                                                                         of flammable, explosive or other hazardous
                                                                                                                         materials within 200m of the gas pipeline
                                                                                                                         shown on Overlay Maps OM3.5 or OM5.5.

                                                  O17 Uses and works are constructed and operated                        S17.1 No solution provided
                                                  to avoid damaging or adversely affecting the
                                                  operation of the pipeline and the supply of gas.




                                                  58
                                                       PSP1 outlines information Council may request in relation to development in proximity to gas pipelines.

                                                                                                              13-58
                                                                                          Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.