Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
58
Table 13.19 Areas in proximity to gas pipelines
Including amendments to 3 July 2017
column 1 column 2
The Noosa Plan
Specific Outcomes Probable solutions
13.48 Effects of uses and works
General
O16 Adequate separation is provided between the S16.1 The use does not result in an
use or works and the gas pipeline. increase in the number of people living or
congregating within 200m of the gas pipeline
shown on Overlay Maps OM3.5 or OM5.5;
AND
S16.2 The use does not involve the storage
of flammable, explosive or other hazardous
materials within 200m of the gas pipeline
shown on Overlay Maps OM3.5 or OM5.5.
O17 Uses and works are constructed and operated S17.1 No solution provided
to avoid damaging or adversely affecting the
operation of the pipeline and the supply of gas.
58
PSP1 outlines information Council may request in relation to development in proximity to gas pipelines.
13-58
Natural Hazards and Natural Resources Overlays
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.