Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Acceptable solutions (if self-
The Noosa Plan
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
60,000 litres;
AND
S21.1 If not in a reticulated water service
area— there is, on the lot, a dam, swimming
O21 Detached houses and Ancillary
pool or water tank accessible for use by the fire
dwelling units
21 brigade, that contains at least 5,000 litres of
within Bushfire Hazard Areas have sufficient
water.
water supply for fire fighting purposes.
Editor’s note:
The 5,000 litres required in S20.1 can be included
within the water required in S21.1 providing it is
accessible for the purpose of fire fighting at all times
and not used for other domestic purposes.
Advisory note
The 5,000 litres required in S23.1 can be included
within the water required in S22.1 providing it is
accessible for the purpose of fire fighting at all
times and not used for other domestic purposes.
Effluent Disposal
O22 Effluent disposal does not have a No solution provided (no requirement for self-
significant adverse effect on biodiversity, natural assessableaccepted development development)
22
vegetation or water quality .
Editor’s note:
O23 Treatment and disposal of wastewater PSP24 – Effluent Disposal details requirements for
does not have any detrimental impact on the design and siting of effluent disposal systems
Noosa’s major water storage and supply - Lake where located outside a sewerage service area.
Compliance with PSP24 will be considered as part of
Macdonald. Council’s assessment of the plumbing and drainage
application.
Advisory note
PSP24 – Effluent Disposal details
requirements for the design and siting of
effluent disposal systems where located
outside a sewerage service area. Compliance
with PSP24 will be considered as part of
Council’s assessment of the plumbing and
drainage application.
Environmental Protection
O24 The design, siting and construction of S24.1 Where there is an existing building
buildings and structures minimise the clearing of envelope on the lot that contains vegetation
vegetation and where there is an existing protection measures, clearing of native
preliminary approval that includes vegetation vegetation and building works do not extend
protection measures for the property, the beyond the building envelope, except for the
proposal is consistent with those measures. purposes of a driveway access;
AND
21
Land shown as Bushfire Hazard Area on the overlay maps is designated as bushfire prone area for the purposes of the
Building Regulations 2006. The bushfire hazard area includes land covered by the very high, high and medium bushfire
hazard areas as well as the buffer area category on the overlay maps
22
Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.
71
Detached House Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.