Skip to the record
The only place to find full transcripts.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                   column 1                                               column 2
            Including amendments to 3 July 2017




                                                               Specific Outcomes                      Probable solutions (if code assessablecode
The Noosa Plan



                                                                                                                        assessment)
                                                                                                     inspection points are altered to match the new
                                                                                                     surface level;
                                                                                                     AND
                                                                                                     S1.5 Alterations are constructed in accordance
                                                                                                     with Section 4 of PSP5 –Engineering Design
                                                                                                     Standards – Roads, Drainage and Earthworks
                                                                                                     and applicable water and sewerage design
                                                                                                     standards;
                                                                                                     OR
                                                                                                     S1.6 Existing services are relocated and the
                                                                                                     design and construction of the relocated
                                                                                                     services is in accordance with Section 4 of
                                                                                                     PSP5 –Engineering Design Standards – Roads,
                                                                                                     Drainage and Earthworks and applicable water
                                                                                                     and sewerage design standards.
                                                  O2 Maintenance access is provided to all           S2.1 For trunk infrastructure a registered
                                                  sewers, water mains, stormwater drains,            easement in favour of Council is created over all
                                                  overland flow paths and associated structures.     underground infrastructure located in private
                                                                                                     property;
                                                                                                     AND
                                                                                                     S2.2 The width of the easement is the greater
                                                                                                     of 3m or the width of the zone of influence;
                                                                                                     AND
                                                                                                     S2.3 The easement is centred over the
                                                                                                     centreline of the infrastructure.




                                                                                                   134
                                                                                         Existing Services Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.