Skip to the record
Search everything, all in one place.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                  column 1                                          column 2
              Specific Outcomes                    Probable solutions (if code assessablecode




                                                                                                                    Including amendments to 3 July 2017
                                                                  assessment)




                                                                                                        The Noosa Plan
                                                   Figure 14-33




                                                   AND

                                                   S10.5 The boat ramp surface profile shall be
                                                   concave to allow concentration of water to the
                                                   centre of the ramp.


Table 14-65 Operational Works within Noosa Waters canal
                 column 1                                           column 2
             Specific Outcomes                     Probable solutions (if code assessablecode
                                                                  assessment)
14.167 Character and Amenity
O11 Works are designed and sited to ensure—        S11.1 For lots with frontages greater than 15m or
a) they are contained within the prolongation      greater in width, jetties are setback a minimum of
   of boundaries of the lot;                       3m from the prolongation of the boundaries,
b) that when a vessel is berthed it does not       except as allowed for in S11.2 and S11.3 (Refer
   encroach over the prolongation of               Figure 14-34);
   boundaries of the lot;
                                                   Figure 14-34
c) a high level of visual amenity is maintained
   when viewed from the watercourse and
   adjoining lands;
d) the works avoid conflicts with uses in the
   water and on the foreshore and adjoining
   lands;
e) materials blend with the natural surrounds;
f) cluttering of watercourses is avoided;
g) excessive traffic volumes within foreshore
   areas, on adjoining lands and in the water
   are avoided; and
h) they reflect the character and setting of the
   work’s immediate surrounds or the locality      OR
                                                   S11.2 For lots less than 15m in width (including
                                                   lots located in canal bends or on lots located in
                                                   the head of the canal)—
                                                        a) a joint application is made with the
                                                             adjoining owner; or
                                                        b) where a joint application is not possible,
                                                             jetties—
                                                        i.        are setback a minimum of 1m from
                                                                  the prolongation of the boundaries;
                                                        ii.       are not more than 1.5m in width;
                                                        iii.      have no jetty head;
                                                        iv.       allow for safe access and
                                                                  manoeuvrability for both the
                                                                  neighbouring property and the

                                                167
                                      Watercourses Works Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.