Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Table 14-69—Minimum size of flood free house site areas or development areas for lots
Zone Minimum house site area or other development areas required above
the modelled flood level of the 1% AEP (1:100 year ARI) water surface
levels or where not modelled, above the highest known flood level
Detached Housing 100% of allotment
Semi-attached
100% of allotment
Housing
Attached Housing 100% of allotment
Visitor Mixed Use 100% of allotment
Neighbourhood
100% of allotment
Centre
2
Business Centre 400m
2
Village Mix 400m
2
Community Services 450m
2
Industry 1,000m
2
Rural Settlement 1,000m plus additional area required for effluent disposal
2
Rural 1,000m plus additional area required for effluent disposal
Open Space 2
1,000m or 10% of the total site area, whichever is the greater.
Recreation
Open Space
n/a
Conservation
193
Reconfiguring a Lot Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.