Attachments B, C & D - MCU16/0120
Attachments ______________________________________________________________________________________ Attachment B – Soil Stability Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 23 pages
Page 2
WORKING FOR YOUR PROJECTS SUCCESS
SLOPE STABILITY ASSESSMENT
Address : Lot 27 Noosa Dunes
Marcus Beach
Client : K & B Monahan
Date : 8 September 2016
Report No : 26250(S)
Page 3
INTRODUCTION
SCG Consulting Engineers have been commissioned to provide a Slope Stability Assessment for the above
allotment. The assessment considers only the existing state of the allotment and any possible effects that the
proposed works will have on this site.
The proposed works are detailed by Aboda Design Group in plans WD.01 thru WD.604.
SITE DESCRIPTION
A desk top study of the site confirms the following:-
- The site is located in an area identified as ‘Sand Dune Problem Area’ on the Noosa Shire Council’s
Landslip Maps.
- Reference to the Australian Geological Map 1:100000 Gympie Special confirms the site is located within
the Quaternary Sandbed.
Field work has been undertaken which included explorative testpits/boreholes by 1st Independent Soil Testing,
together with a walkover of the site by SCG Consulting Engineers.
The borehole logs contained in 1st Independent Soil Testing report No.16/359 dated 26 April 2016 confirms the
soil profile to consist of the following –
: LOOSE SILTY SANDS INCREASING IN DENSITY WITH DEPTH
Our walkover confirmed the following characteristics-
Site Slope : A visual assessment of the surface grades within the allotment using
a hand held inclometer suggests grades in the order of 18% exist
across the proposed construction site.
Vegetations : Vegetation consists of scattered trees and dense undergrowth.
Slope Shape/Location : The surface profile across the allotments slope faces are generally
LINEAR PLANAR.
Drainage : The surface drainage is good, sub-surface drainage is good. There was
no indication of ground water seepage or rising water pressure.
Stormwater flows from upslope of the allotment will be intersected and
captured by the road reserve.
Earthworks : There is no existing earthworks apparent.
Adjacent Structures : Adjacent structures on the neighbouring properties appear to be a mix of
slab on ground and suspended timber framed floors.
Evidence of previous
Soil Movements : None apparent.
LANDSLIP MECHANISMS
Landslip is generally defined as the movement of a mass of rock or soil down a slope.
It is generally considered to occur when the strength of the soil or rock mass to support itself is exceeded
causing movement to occur within the mass.
This loss of strength can occur as a result of numerous circumstances. These include, but are not limited to the
following:-
Page 4
- Siesmic Activity
- Erosions effects such as wind or fluid scour
- Soil Saturation from rainfall events or defective drainage measures
- Construction/Earthworks activities
- Groundwater variations/movements
- Previous Landslips
The nature of landslips vary with site specific conditions and failure mechanisms that cause the slips to occur.
Appendix B provides some diagrammatic examples of various landslips.
The speed of landslips can vary greatly from millimetres per year to a number of meters in a matter of minutes.
Once again this characteristic is governed by site specific conditions and the failure mechanism causing the slip
to occur.
The allotment is situated within a massive aeolian sand bed of Quaternary age. As a general observation dunal
horizons such as these are stable where;
- The natural slope is less than the angle of repose for sand (30)
- Vegetation exists to protect from wind generated scour
- The drainage pattern is such that there is no risk of fluvial scour.
These horizons can become unstable when aeolian or fluvial scour erode slopes to angles greater than 30,
particularly when coincident with vegetation removal.
LANDSLIP HAZARD ASSESSMENT
For our assessment we utilise the Guidelines For Landslip Risk Management Framework as provided by the
Australian Geomechanics Society, in their journal of March 2007. Descriptions used by this framework can be
found appended to this report.
Using the Qualitive Risk Analysis Matrix (refer appendix) we have established the following characteristics for
the allotment.
Landslip Mechanism : Translational, Rotational or Creep Flow
We consider a potential landslip mechanism will consist of either a Rotational or Translational Landslide or
Creep movement within the sloping profile. Diagramation representation of these mechanisms are
appended to this report. We are of the opinion that this movement could occur following over excavation
or scour.
Likelihood of Landslip : Likely
This is due to the evidence during our site visit which the surface grade within the allotment.
Consequences to Property : Minor
With these factors considered we classify the allotment as:-
MODERATE RISK OF LANDSLIP
Although we consider the allotment has a moderate risk of landslip, building work undertaken on the site should
follow accepted methods which assist in maintaining slope stability.
Such measures are discussed in the following section.
HAZARD MITAGATION – CONSTRUCTION RECOMMENDATIONS
We consider the primary risks for landslip occurring within this allotment is over excavation or, stormwater scour
and vegetation removal.
The construction of any cut/fill platforms within the site will lead to an increased risk of landslip.
SCG Consulting Engineers 3 SCG Ref: 26250(SL)
Page 5
Any over excavated (steep) cuts may lead to landslip. Similarly, steep fill batters may be susceptible to slip or erosion. Any exposed fill batters are susceptible to weakening from saturating rains and stormwater scour. This risk is compounded, where poor compaction is achieved when placing the fill. Any fill batter profiles should be limited to a maximum grade of 1 to 3 (vertical to horizontal). Where possible the fill platform should be benched into the natural profile after the removal of all organic material including topsoils.. Surface stormwater runoff should be diverted around fill batters. Vegetating the fill batter can improve the batters ability to resist slip and or scour. Where these recommendations are unachievable, benching, shoring or retaining measures should be implemented. Any permanent exposed cut batters should be limited to a maximum slope of 1 to 2.5 (vertical to horizontal). The face should be protected from stormwater scour with cut off drains above the cut. Catch drains should also be provided along the base of the cut. The drains must dissipate all stormwater from above and below the cut. Vegetating the cut batter can improve the batters ability to resist slip and scour. Steeper batters should be retained with engineer designed retaining walls. All excavations both temporary and permanent must be adequately battered or retained to prevent collapse. Temporary excavations for retaining walls can have exposed cut batters of 1 to 1.7 (vertical to horizontal) taken from the base of the excavation. These earthworks must incorporate shallow surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down-slope and clear of the construction area. Any exposed soil face should also be protected against the potential for stormwater erosion. Saturation of the exposed cut batter from prolonged rainfall will potentially de-stabilise the cut batter. Programming of the works must consider this possibility. Temporary backfilling of the slope may be required. Should these recommendations be un-achievable the builder should seek guidance from this office on temporary shoring, benching or other suitable techniques. The allotment will support a typical form of residential construction. Structural foundations should be designed by a competent person in accordance with AS 2870, accepted engineering theory and the geotechnical conditions reported by this office. All earthworks should be constructed in accordance with AS3798-1996 ‘Guidelines on earthworks for commercial and residential developments’ and sound engineering theory. The builder must ensure the stability of neighbouring structures is maintained through not undermining their foundations. This is achieved via restricting any earthworks to above a line radiating downwards at an angle of 1 in 1.2 (vertical to horizontal) from the base of the foundation/structure to be protected. The proposed method of construction is for a blockwork dwelling supported on ground slabs. The allotment is suitable for this form of construction, any excavations for lower floor areas must adhere to the recommendations contained herein. Retaining walls for landscaping purposes would need to be constructed with consideration of maintaining stability of the surrounding ground during construction. Such measures would include limiting the slope of any excavations to a slope of 1 vertical to 1.7 horizontal and protecting the works against stormwater scour. The retaining wall designs must allow for the lateral soil pressures expected including additional surcharging from sloping backfills. Although we consider the allotment stable in its current form there will always be a risk of landslip under severe stormwater conditions. Measures that will reduce this risk include the following but are not limited to. The finished ground surface should be leveled and graded to ensure no concentration of stormwater runoff leading to ground scour can occur. Any collected stormwater from areas other than the roof should be disposed of downslope from the proposed dwelling and should also ensure no ground scour can occur. All stormwater runoff from hard landscaped areas should be directed around the perimeter of the house and contained within the site via diversion bunding, scour proof drains and field inlets. SCG Consulting Engineers 4 SCG Ref: 26250(SL)
Page 6
All stormwater collected from roofed areas should be directed to storage tanks for re-use. Overflow from the
tanks should be disposed of via rubble soakage pits downslope of the dwelling.
No stormwater runoff should be allowed to flow over any exposed excavated embankment faces or filled batters.
Areas adjacent existing gullies must be protected against stormwater scour are susceptible to instability from
erosion effects and over saturation. With this considered, structures should not be located adjacent gullies.
Also, the area adjacent the flanks of the gullies should be protected from scour via vegetation and limiting
surface grades.
All existing cross allotment flows from neighbouring properties must also be considered, managed and
maintained. Clear unhindered drainage paths must be provided and maintained during and beyond construction.
All constructed retaining walls must have effective drainage measures upslope and beyond the walls to relieve
any sub-surface water pressure/build-up. These drains must be maintained and flushed out regularly. To
achieve this we recommend bringing the upstream end of the drain to surface and capping off to allow future
flush out.
We have attached guidelines for hillside construction extracted from Australian Geomechanics vol. 35 March
2000 – “Landslide Risk Management”. These references provide commentary on good design and building
practice.
We trust this meets with your requirements, however should you have any queries on the above matter please
contact the undersigned.
Yours sincerely
Sean Richardson RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS
Encs Appendix A - Some Guidelines for Hillside Construction
Appendix B - Landslip Mechanisms
Appendix C - Landslip Risk Assessment Matrix
SCG Consulting Engineers 5 SCG Ref: 26250(SL)
Page 7
APPENDICES A. SOME GUIDELINES FOR HILLSIDE CONSTRUCTION B. LANDSLIP MECHANISMS C. LANDSLIP RISK ASSESSMENT MATRIX
Page 8
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX A - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechnical practitioner at early Prepare detailed plan and start site works before
ASSESSMENT stage of planning and before site works. geotechnical advice.
PLANNING
SITE PLANNING Having obtained geotechnical advice, plan the development with the risk Plan development without regard for the Risk.
arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
Use flexible structures which incorporate properly designed brickwork, timber Floor plans which require extensive cutting and
or steel frames, timber or panel cladding. filling.
HOUSE DESIGN
Consider use of split levels. Movement intolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetation wherever practicable. Indiscriminately clear the site.
ACCESS & Satisfy requirements below for cuts, fills, retaining walls and drainage. Excavate and fill for site access before
DRIVEWAYS Council specifications for grades may need to be modified. geotechnical advice.
Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS Retain natural contours wherever possible. Indiscriminatory bulk earthworks.
Minimise depth. Large scale cuts and benching.
CUTS Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts.
Provide drainage measures and erosion control. Ignore drainage requirements
Minimise height. Loose or poorly compacted fill, which if it fails,
Strip vegetation and topsoil and key into natural slopes prior to filling. may flow a considerable distance including
Use clean fill materials and compact to engineering standards. onto property below.
FILLS Batter to appropriate slope or support with engineered retaining wall. Block natural drainage lines.
Provide surface drainage and appropriate subsurface drainage. Fill over existing vegetation and topsoil.
Include stumps, trees, vegetation, topsoil,
boulders, building rubble etc in fill.
ROCK OUTCROPS Remove or stabilise boulders which may have unacceptable risk. Disturb or undercut detached blocks or
& BOULDERS Support rock faces where necessary. boulders.
Engineer design to resist applied soil and water forces. Construct a structurally inadequate wall such as
Found on rock where practicable. sandstone flagging, brick or unreinforced
RETAINING
Provide subsurface drainage within wall backfill and surface drainage on slope blockwork.
WALLS
above. Lack of subsurface drains and weepholes.
Construct wall as soon as possible after cut/fill operation.
Found within rock where practicable. Found on topsoil, loose fill, detached boulders
Use rows of piers or strip footings oriented up and down slope. or undercut cliffs.
FOOTINGS
Design for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.
Engineer designed.
Support on piers to rock where practicable.
SWIMMING POOLS Provide with under-drainage and gravity drain outlet where practicable.
Design for high soil pressures which may develop on uphill side whilst there
may be little or no lateral support on downhill side.
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses. Allow water to pond on bench areas.
SURFACE Provide general falls to prevent blockage by siltation and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Special structures to dissipate energy at changes of slope and/or direction.
Provide filter around subsurface drain. Discharge roof runoff into absorption trenches.
Provide drain behind retaining walls.
SUBSURFACE
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
Usually requires pump-out or mains sewer systems; absorption trenches may Discharge sullage directly onto and into slopes.
SEPTIC &
be possible in some areas if risk is acceptable. Use absorption trenches without consideration
SULLAGE
Storage tanks should be water-tight and adequately founded. of landslide risk.
EROSION Control erosion as this may lead to instability. Failure to observe earthworks and drainage
CONTROL & Revegetate cleared area. recommendations when landscaping.
LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Building Application drawings should be viewed by geotechnical consultant
SITE VISITS Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
OWNER’S Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY pipes.
Where structural distress is evident see advice.
If seepage observed, determine causes or seek advice on consequences.
Australian Geomechanics Vol 42 No 1 March 2007 113
Form No. 68029 RL2 August 2010
Page 9
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
114 Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68029 RL2 August 2010
Page 10
APPENDIX B
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
Australian Geomechanics Vol 42 No 1 March 2007
Page 11
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OF LIKELIHOOD
Approximate Annual Probability
Implied Indicative Landslide
Description Descriptor Level
Indicative Notional Recurrence Interval
Value Boundary
10-1 5x10-2
10 years The event is expected to occur over the design life. ALMOST CERTAIN A
-2
20 years The event will probably occur under adverse conditions over the
10 100 years
design life.
LIKELY B
-3
-3 5x10 200 years
10 1000 years The event could occur under adverse conditions over the design life. POSSIBLE C
5x10-4 2000 years
-4 The event might occur under very adverse circumstances over the
10 10,000 years
design life.
UNLIKELY D
5x10-5 20,000 years
10-5 100,000 years
The event is conceivable but only under exceptional circumstances
RARE E
over the design life.
-6 5x10-6 200,000 years
10 1,000,000 years The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor Level
Indicative Notional
Value Boundary
Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200% CATASTROPHIC 1
stabilisation. Could cause at least one adjacent property major consequence damage.
100%
Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
60% MAJOR 2
stabilisation works. Could cause at least one adjacent property medium consequence damage.
40%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
20% MEDIUM 3
Could cause at least one adjacent property minor consequence damage.
10%
5% 1% Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4
Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
0.5% INSIGNIFICANT 5
notional boundary of 0.1%. See Risk Matrix.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa
Australian Geomechanics Vol 42 No 1 March 2007
Page 12
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)
QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
LIKELIHOOD CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
Indicative Value of 1: CATASTROPHIC 2: MAJOR 3: MEDIUM 4: MINOR 5:
Approximate Annual 200% 60% 20% 5% INSIGNIFICANT
Probability 0.5%
A – ALMOST CERTAIN 10-1 VH VH VH H M or L (5)
B - LIKELY 10-2 VH VH H M L
C - POSSIBLE 10-3 VH H M M VL
D - UNLIKELY 10-4 H M L L VL
E - RARE 10-5 M L L VL VL
F - BARELY CREDIBLE 10-6 L VL VL VL VL
Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time.
RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
VH VERY HIGH RISK options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
H HIGH RISK
risk to Low. Work would cost a substantial sum in relation to the value of the property.
May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
M MODERATE RISK implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
L LOW RISK
required.
VL VERY LOW RISK Acceptable. Manage by normal slope maintenance procedures.
Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only given as a
general guide.
Australian Geomechanics Vol 42 No 1 March 2007
Page 13
Attachments
______________________________________________________________________________________
Attachment C – Storm Water Management Plan
Attachments
Page 14
LMS-0Sz9z °N 81a | 9L0z BnY wea | zy © oOL: Ww
nay
7 Se & @ ! NOILOSS WOldAL
yoeeg snoley|
‘AWLAG Ld YSNVOS NOWLVYLTIANT NIVECSAY
SOUNC BSOON £Z 107 yoal01g Uospioyaly S JINN HLd30 TWOLLIdO sm
) S3NM NIOP SHI SNOT G3GIAOYd UOLISIHNI 4O WOLLOG HONOYHL
NVW1d LNSAWS9VNVN ee pace _ ‘NVId JHL NO LOOY V HLIM SNIOP LY G3dd¥1 38 O1 dlav4039 did G4LLOTS 4NOud
YALVMAMOLS ALIS ont jana] punoug INQzqu0Id Of —WLNOZIYOH —qyign SY wadH30 YO INN Hidaa ‘SdNW10 Jdid T341S SSHINIWLS HLM ALLI4 39
WOM 3HL MOT3S OO¢ JO OL IN8V4039 FHL HONOYHL SNOILVYLANAd did TV
I
aero a WNWININ ¥ G3GNNO4 34 OL Juv SRS SSR SE
WOO'SJ88UIDU8-DIS'MWMM.qam =
woo s20uve Sos uupejeue \ 3 | . INULOOS SHL ONLYOddNS SYaId ASV9 JHL NI did G4LLO1S I
¥09S SS¥S (20) Ud 99S lid 3080S | vv eva Hono !
404 NOWWAVOX3 .
SPeESH BSOON —+l TAVIS SI
‘ony wolold LLL HUN we Gas0d0¥d 40 IN . GNY NT TvoURD GNA HOV LY SdO¥O JOAOUd |
| Py Tavis «M018 GBQNNO4 NS
WAOUdd¥ ! awa SI ONLOOS SIHL HOTULNO SS SS SSS AOUNI “3SMUSHLO CALON SSTINN YALSAVIO Jdld WNYAIN
:anss| TIGVISNN SI ONY INN Hid3d | Ra &e ya VANO1S s u MALYMINMOLS NNWININ FHL OL S¥AS3Y JOYS, NYAL FHL ‘PL
‘WOUND JAO8Y CIGNNOI | vr “gy $0! sol oay02 “ONIddVUM LNIOP LNIOP FT8X314
a1eq uojduoseg | uolsinoy SI SYdld LNOHLIM ONILOOS SIHL. ————= TIEVLSNN IF1N0 NaLYMNOLS NI GaddVYM ‘HOI Z CEMOVIS G3AONddY NY NI G3ddvuM 38 OL SEVIS ONLLYLANd
: : : Ld — DAL Od) ON 3Y3HM IVY9 MOTINIAO INT NI 9 STIGO NOLLVYLTINI SHOINMAS YaLVM CNY Sddid ISVM TIV ‘Sl
ZZ] (NnO¥o A 40 1nd HSM4 Yod 3SVE Z TINGONONIANG NIVUaSny "S3X08 HIVd 3L3YONOD C3AONddV NI
"SHYOM ONKONSNNOD NI Adld GALLONS WOus (S‘0") ONVGNOIOY NI 38 TIVHS S3A1VA GNNOYO-NI TV ‘ZL
OL Mokd STAAT] INVAT HY SONINSdO NOLLOISNI JGMONd “SYIAOD NOUI-IS¥D
THY WYIINOD TIWHS — 4O SSVYG Y3HLIT HLM ALLY 38 OL SV SINSNIAVd
YOLOVYLNOD/U3O1ING 3HL NOILOAS NVRUS303d YO YVINOGA NI GSLYNLIS Sav
QNISOTD GNY SONINSdO NOUSUSNI ‘SLNO-NYITO “LL
\d0/NIVUd CALVO Jove Yaw) “Wr@SW HLUM JONVQYODOW NI GSTIVLSNI 38 OL JUV
ST32Y JSOH ‘1'6LPZS¥ HLIM JONVGYOIOY NI G3TIVLSNI
38 OL YY CITWISNI 34 OL JUV SINVNGAH 3Yld ‘Ol
Idd ‘aVIS JHL 3AOgy OVW
(iooz 30 TIVHS SNOUIANNOD ONY SNIOP TIY GNY SAV
NIV GaLVYO _ GNNOYD NI GALLINYSd LON JUV S3OIMES UALYM ‘6
oN 8 | “Wdd0O @ 3dAL 34 OL YYOMIdld
SCUWND V1 GAVH OL av | S AlddNS 4aLYM TWNAGINI ONY GNNOYD 3AOBY Thy ’8
SYILLND ONY Said NMOO Thy ! ag NFUHIBI0d ZL SS¥0
Tad JOvaVS 0 34K. ALISN3G HOIH - SS31 YO ‘Wid WES
+ 3G OL SI GNNOYD MOTSE YYOMAdld AlddNS YALVM °L
NVTd INSNSOVNVN UaLVMNUOLS LIS 3m 0 a
¥ LV GIV1 GNV “O'N'N OAdN “WVIG WAOOL SHAMS °9
“SLNANFYINDIY SYIYNLOVANNYA
JHL HLIM JONVGYOOOV NI GALONYLSNOD
3d OL JV SNIOP ‘O'N'N OO! NI | 40 30VYO WNNININ
Vv LV GIV1 3did Oud (x)@ SSW10 S3IGYVH YO OAdN
HS SSV10 3@ TIVHS Sddld SOVNIVYG YSLVMNYOLS “S
“MYOM
AO ONIONANNOD SHL OL YOIYd SNVId CALVIOOSSY
QNY 3SSHL NO GA4LVOIONI SV SSOIAYSS ONLLSIXA TV
4O NOLISOd SHL WUIINOD OL SI YOLOVYLNOD ZHI ‘y
“SIVAOUddY ONY SLINYSd AYVSSIOIN TIV
ONINIWLEO MALY ‘NOLLOIGSINAP ONIAVH SSLLIMOHLAY 40
SININSYINDIY FHL HLIM ATdNOD TIVHS YYOM TIV 'S
“OOSESY HLIM JONVCYOOOV
eral NI 38 OL AYVONNOG LNAWLOTIV SHL NIHLIM
NOILWINOWSY YALVM ONY SONMVYGAH AUVLINVS TIV °C
“SAUNLXLA
4O SNOILVOOT YO4 SONIMVYG TWYNLOSLIHOUVY OL 44434
< “KINO OLLVAVYOVIG YY NMOHS S3OIAMSS ONNVYCAH 1
0c
02
“NOLOHOUd YNOIS ,
¥o4d ONNoYNS (aaa THAVYD) =
QNIHOLId JNOLS CALNOYONN
/
TW4
“UAQVIYdS HLM’ 4004
Y Yddn WOYS AdidNMOd UL
é “4
“wg
* SALON TWaIN49
NIVYSNY (ON)ZL
wo}30q g do} 9 “STIaD
4vN0018 40
3SVO NI JOWNIVNO 431734
404 AWMAAUG NI HLVd
MOTH/ONVTYSAO SLV3IYO
/ wy
‘Sadi
MOTIUZAO YNVL
JAd" MS B0S1/2 -
/
966 /
Hi dad (a)
HLGIM (m)
TALS SSTINIVLS s/s
So
=
Uv
= YALLND XO 9
b
(ao0z x (M)o0z
; ay “JONIOISHA
\ yO \Y / man aISOd0ud
SOVEVD 4
/
QV3H YaLVM NIVY HM
YALL IdS dS
did NWOd dd
YALVM WYOLS MS
/ M0138
, OOINWL UAL
~ 4000 SOVUVS LV NIVUG! GaLVYd
AQVONNOE dy
CISN SNOILVIASSEEY
Jad" MS GSI
\
“JOVAMAL NICHD /
Wow A
v /
VR |S .
Naguv9 404 | 3 7 + — | 7 j NV1d NO GALON SY Jdld NMOd o dp
Nv CaLWaD / / Yo
/ y / | “RNONOO ISVO-3d
/ / / / ‘ 1d9
a woy30q 9 do} 9 “STII ee L3INI Tad GaLvuo bsosy ti
“ ~ _/ Nivaasny (‘ON)z1 / Ad" MS OSL
NVid NO G3LON SV 3ZIS ===== "> ===
Adld Ad" YaLWM WYOLS GNNOYDYFGNN = IAdN MS 001d
“did WH
NOTE oUWOZ
/ oF ey Two
cV — JZIS ONIMVYC
Page 15
______________________________________________________________________________________ Attachment D – Landscape plan
Page 16
JOINS SHEET 1
JOINS SHEET 2
Contents:
01 Sheet 1 - Cover Sheet
Sheet 2 - Landscape Notes
Sheet 3 - Landscape Demolition and Levels Plan
Sheet 4 - Landscape Planting Plan
Sheet 5 - Landscape Planting Plan
Sheet 6 - Planting Schedule
Sheet 7 - Planting Images
Sheet 8 - Material Images
Sheet 9 - Landscape Details
JOINS SHEET 1
JOINS SHEET 2
OVERALL SITE PLAN
2 Scale: N/A
PRELIMINARY DRAWINGS
NOOSA DUNES
NOT FOR CONSTRUCTION
2 Scale: N/A
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2015 designed by: JS + AL
North
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: A
measurements on site prior to
Client address: scale N/A @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 1 of 9 purpose: Concept
commencement of works.
Page 17
LANDSCAPE GENERAL NOTES: Generally soil to be used shall comply with AS 4419 and the contractor should ensure it complies
with the following specification:
1. Friable and free drainage.
THE CONTRACTORS SHALL: 2. Good texture and structure for selected use.
Remove all un-wanted debris/material from site. 3. Acceptable conductivity and ph. levels for intended plant species to be planted.
Confirm all dimensions in site prior to construction. MULCH:
Seek instruction from superintendent where level discrepancies and poor soil structure occurs. All mulch proposed to be used on site shall be free of foreign matter including anthrpogenic
waste, rock, soil, sediment, contamination, weeds and sticks.
SERVICES:
Planted areas should be mulched to a minimum 100mm deep to ensure site water conversation
The contractor shall confirm the location of all services with relevant authorities prior to planting requirements are achieved as specified.
and excavating.
GENERAL:
All trees must be planted a min. of 1000mm from underground services.
For more detail regarding architecture or engineers refer to the projects Architect and Engineers
All trees must be planted 4 m from overhead street lights. drawings.
DRAINAGE: Planting shown reflects the design intent, exact numbers and locations will require confirmation
Install sub-soil drains as required and where garden abuts building and connect into stormwater. on site by the superintendent.
Sub-soil drains to be 100mm slotted ag pipe covered with filter fabric and shall be surrounded Any changes to be made to the landscape plan must be approved by the landscape architect
with a minimum 100mm or 25mm diameter drainage gravel. and superintendent.
Ensure drainage works correlate with adjacent land and specified finished levels. All planting layouts are to be approved by the landscape architect on site prior to planting.
GENERAL PLANTING: All structures are to be approved by the appropriate government departments prior to any
construction taking place.
Plant stock is to be approved by landscape contractor and qualified aborist prior to
acceptance of delivery. All landscape plans presented assume that all base and survey information is accurate and to
scale. The contractor shall check landscape plans presented for any discrepancies with the
Mulch bed areas should not exceed a 1:3 grade; where slopes are more than 1:3, install
existing site conditions or other dwelling presented prior to any construction work taking place. If
biodegradable jute matt. Where slopes are greater than 1:2 install jute mesh product to
discrepancies do occur these shall be highlighted at once to the superintendent prior to any
manufacturers specification.
construction work taking place.
Install specified topsoil and crown bed at centre with 1 inch Hoop Mulch as specified.
IRRIGATION:
All plantings shall incorporate the inclusion of a slow release native plant fertiliser (as per
These landscape plans assume all landscapes areas will be irrigated automatically to
manufacturers specification) and the use of soil moisture retention additive (as per
appropriate standards and installed by a suitably qualified person and have a minimum 12
manufactures specification), placed adjacent to the plant root ball at the time of planting.
month warranty.
Trees are to be certified by a qualified aborist as natspec compliant prior to delivery to site.
MAINTENANCE:
Qualified aborist to select natspec compliant trees at nursery and check delivery to site.
It is recommended that the whole landscape is maintained. This will be quoted on separately.
Maintenance is recommended fortnightly basis for the first 13-14 weeks.
TOPSOIL:
Irrigation and watering:
All imported topsoil to comply with AS 4419.
Daily for 3 weeks, every 2-3 days thereafter.
Where site soil is to be used as topsoil, ameliorate site soil as specified by the soil testing
laboratory. All soil stockpiles are to be maintained to control weeds routinely and guard against irrigation system is installed which by the garden can be watered automatically for 30 mins per
dispersion by wind or water. Stockpiles shall be limited to a maximum height of 2m and may day for watering or every second / third day.
require covering or retaining. Stockpiles are not permitted within close proximity to residential
Weed removal and wick wiping, as required to reduce competition and seeding.
properties.
Re- mulching, as required to maintain a consistent depth until plants are established.
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2015 designed by: JS + AL
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: A
measurements on site prior to
Client address: scale N/A @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 2 of 9 purpose: Concept
commencement of works.
Page 18
16 RE
.57 W
16.57
1
12.36 MH
LL :
16.42 TE :10
16.05 .66
N
SU
57°43'
SU
14.88
N
IL:9.71
35.827
16.38 EJ 16.24
13.47 13.27
1
CO
MM 9.94
No.
15.50
16.07
16 16.02
17.43 16
.00 14.63
06 H
16. 15
.16
10.01
15
RL
/TW 9
147°43'10"
5.94 9.96
18.983
9
329°57'10"
18.012
16.00
5.88
15.88 10.14
8.64
fw
15.75
14.04 13.22
15.55 dr
fw
wm
EL
P
8.58
8
IL:7.02
11.98 11.04 9.78
WM
13.70 12.80 36.542 7.87
11
15.38
239°15'35" 10
MH
14
LL :
8
9
2
:7.
15.26 95
15.15
W
IN
D
15.18
15.06
outside
0 1 2 3 4m
a: 4 rene street, noosaville, qld 4566 this drawing/design is subject to
copyright, with all rights Client: date: 07/09/2016 designed by: JS/AL
1:100 @ A3
p: 07 5448 0250 remaining to outside noosa. TREE DEMOLITION &
w: www. outsidenoosa.com.au
these drawings should not be Kim and Bob Monahan job no: drawn by: AL LEVELS PLAN
North
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: Issue A
measurements on site prior to
Client address: scale 1:100 @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 3 of 9 purpose: Concept
commencement of works.
Page 19
JOINS SHEET 1
JOINS SHEET 2
outside
0 1 2 3 4m
a: 4 rene street, noosaville, qld 4566 this drawing/design is subject to
copyright, with all rights Client: date: 07/09/2016 designed by: JS/AL
1:100 @ A3 North
p: 07 5448 0250 remaining to outside noosa.
w: www. outsidenoosa.com.au
these drawings should not be Kim and Bob Monahan job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: Issue A
measurements on site prior to
Client address: scale 1:100 @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 4 of 9 purpose: Concept
commencement of works.
Page 20
JOINS SHEET 1
JOINS SHEET 2
outside
0 1 2 3 4m
a: 4 rene street, noosaville, qld 4566 this drawing/design is subject to
copyright, with all rights Client: date: 07/09/2016 designed by: JS/AL
1:100 @ A3 North
p: 07 5448 0250 remaining to outside noosa.
w: www. outsidenoosa.com.au
these drawings should not be Kim and Bob Monahan job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: Issue A
measurements on site prior to
Client address: scale 1:100 @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 5 of 9 purpose: Concept
commencement of works.
Page 21
Lot 27 Noosa Dunes - Planting Schedule
Trees
Trees
Code Botanical Name Common Name Height and Spread Size Quantity
BAN int Banksia integrifolia Coastal Banksia H = 5m x S = 2m 45L 6 6
BAN ser Banksia serrata Old Man Banksia H = 10 x S = 5m 45L 1 1
GRE 'ML' Grevillea 'Moon Light' Moonlight H = 5m x S = 2-3m 300mm 6 6
PAN sp. Pandanus tectorius Pandanus H = 5m x S = 4m Ex- Ground 2 2
Shrubs
Code Botanical Name Common Name Height and Spread Size Quantity
ACR imp Acronychia imperforata Fraser Island Apple H = 4m x S = 1.5 300mm 33 33
CAL rr Callistemon 'Rocky Rambler' Callistemon Rocky Rambler H = 0.5m x S = 1m 200mm 14 14
CAL vim Callistemon viminalis Wilderness White H = 3m x S = 1.5m 300mm 12
CAR gla Carpbrotus glaucescens Pig Face H = 0.2m x S = 2m 140mm 15 15
GRE 'DG' Grevillea 'Dorothy Gordon' Grevillea Dorothy Gordon H = 3m x S = 2m 200mm 9 9
GRE lil Grevillea 'Lilliane' Grevillea Lilliane H = 1m x S = 1m 200mm 2
GRE 'SS' Grevillea 'Strawberry Sundae' Grevillea Strawberry Sundae H = 1m x S = 1m 200mm 4
GRE rr Grevillea 'Royal Rambler' Royal Rambler H = 0.25m x S = 1.5m 140mm 16 16
HIB sca Hibertia scandens Climbing Guinea Flower H = 1m x S 1m 140mm 11 11
LOM hys Lomandra hystrix Lomandra Katie Belles H = 1.5 x S = 1.5m 140mm 6
LOM tc Lomandra hystrix Lomandra Tropic Cascade H = 0.80m x S = 0.80m 140mm 34 34
LOM sh Lomandra fluvialtilis Lomandra Shara H = 0.40m x S = 0.50m 140mm 32 32 int - Banksia integrifolia
BAN BAN ser - Banksia serrata
MYO ell Myoporum ellipticum Coastal boobialla H = 0.5m x S = 1m 140mm 7 7
WES fru Westringia fruticosa Fruticosa Westringia H = 0.4m x S = 1m 200mm 20 20
WES gb Westringia 'Grey Box' Grey Box H = 1m x S = 1m 200mm 9 9
GRE ‘ML’ - Grevillea PAN pen - Pandanus
‘Moon Light’ tectorious
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2015 designed by: JS + AL Planting Schedule
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: A
measurements on site prior to
Client address: scale N/A @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 6 of 9 purpose: Concept
commencement of works.
Page 22
Shrubs and Groundcovers
ACR imp - Fraser Island Apple CAL rr - Callistemon ‘Rocky CAL vim - Wilderness White CAR gla - Pig Face GRE ‘DG’ - Grevillea GRE ‘lil’ - Grevillea
Rambler’ ‘Dorothy Gordon’ ‘Lilliane’
GRE ‘SS’ - Grevillea GRE ‘rr’ - Grevillea HIB sca - Hibertia scandens LOM hys - Lomandra hystrix LOM tc - Lomandra Tropic LOM sha - Lomandra Shara
‘Strawberry Sundae’ ‘Royal Rambler’ Cascade
MYO ell - Myoporum ellipticum WES fru - Westringia fruticosa WES gb - Westringia Grey Box
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2015 designed by: JS + AL Planting Images
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: A
measurements on site prior to
Client address: scale N/A @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 7 of 9 purpose: Concept
commencement of works.
Page 23
Feature Pot within landscape / alcove as per landscape plan. Option to have Bluestone pavers 800 x 400mm sealed with penetrating sealer and laid on a concrete road base
pot planted with shade resistant plant.
Envirostone for swale / walkway and for inbetween Larger feature stone around landscape and garden edges to create height
steppers. Sizes ranging from 40-70mm and interest.
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2015 designed by: JS + AL Hard Material Images
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: A
measurements on site prior to
Client address: scale N/A @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 8 of 9 purpose: Concept
commencement of works.
Page 24
50mm x 50mm Hardwood timber
A Grade Blue Couch to be laid stakes. Must not penetrate rootball.
100mm 100mm of 1 inch Hoop Fines with staggered close butted joints Penetrate 200mm into existing
Mulch.
so that finished turf surface is flush subgrade .
300mm of imported 100mm with adjacent surface levels.
garden soil as garden fill. Nylon Hessian tie stapled to stake .
300mm Augment with 'Nutristore Gold' Augemented site topsoil laid to 3m
and Naturmin to minimum of 100mm depth. Organic 100mm of 1inch Hoop Mulch. Maintain
manufacturers rates.
75mm turf starter fertiliser to be applied to minimum of 50mm separation
manufacturers recommendations between organic mulch and base of
Subsoil. to top layer of topsoil prior to turf
stem .
150mm being laid.
Subsoil cultivated to 75mm deep and Finished Grade .
Notes: Remove weeds from garden beds prior to re ensure free draining in preparation for
topsoil application. Natspec compliant container tree. H
constructing bed. Environmentally acceptable
methods will be used. A non residual herbicide may Tease out rootball and root prune as
Notes: Following laying of turf, irrigate immediately
be applied to areas affected by weeds. Regularly directed by arborist prior to planting . 200mm
remove weed growth throughout planted and until topsoil is moist to full depth. Continue irrigation regularly
mulched areas during to contracting period. maintaining soil moisture until grass is fully established. Augmented site topsoil with slow
release composted organic fertiliser 3 x Rootball Dia
per manufactures instructions.
Typical Garden Bed Typical Turf Typical Tree in Garden Bed
1 Scale: 1:10 2 Scale: 1:5 3 Scale: 1:50
Shrub / groundcover
planting as per landscape
100mm compacted road base plan.
800 x 400mm bluestone 20 - 40mm envirostone
100mm of 1 inch Hoop Fines
Paver by 'eco outdoor' Compacted sub-base Mulch.
150mm 400 x 800mm Topsoil backfill and light
compaction only.
300mm of imported
100mm
garden soil as garden fill.
Augment with 'Nutristore Gold'
and Naturmin to
manufacturers rates
Note: every 5m along pathway, hardwood timber 300mm
Slow release fertiliser x 2
sleeper / riser installed to retain and stabilise sloping
ground around landscape. 100 - 200mm compacted Planting hole two times wider
road base required where levels are at steepest grade. and deeper than specified pot
size.
150mm
Subgrade to be cultivated to
Typical Steppers 150mm depth.
4 Scale: 1:10
Typical Shrub Planting
5 Scale: 1:10
outside a: 4 rene street, noosaville, qld 4566
p: 07 5448 0250
this drawing/design is subject to
copyright, with all
remaining to outside noosa.
these drawings should not be
rights Client:
Kim and Bob Monahan
date: 07/09/2016 designed by: JS/AL Landscape Details
w: www. outsidenoosa.com.au job no: drawn by: AL
landscape architects John: 0409 960 538
copied without permission.
+ horticultural specialists e: [email protected]
all contractors are to confirm
issue: Issue A
measurements on site prior to
Client address: scale 1:100 @A3
noosa
Abi: 0411 138 269 construction or planting. the
Lot 27 Noosa Dunes
identification of existing services
e: [email protected] should also take place before sheet no 9 of 9 purpose: Concept
commencement of works.