Original source · versioned page text
Attachments B, C & D - MCU16/0120
Any over excavated (steep) cuts may lead to landslip. Similarly, steep fill batters may be susceptible to slip or erosion. Any exposed fill batters are susceptible to weakening from saturating rains and stormwater scour. This risk is compounded, where poor compaction is achieved when placing the fill. Any fill batter profiles should be limited to a maximum grade of 1 to 3 (vertical to horizontal). Where possible the fill platform should be benched into the natural profile after the removal of all organic material including topsoils.. Surface stormwater runoff should be diverted around fill batters. Vegetating the fill batter can improve the batters ability to resist slip and or scour. Where these recommendations are unachievable, benching, shoring or retaining measures should be implemented. Any permanent exposed cut batters should be limited to a maximum slope of 1 to 2.5 (vertical to horizontal). The face should be protected from stormwater scour with cut off drains above the cut. Catch drains should also be provided along the base of the cut. The drains must dissipate all stormwater from above and below the cut. Vegetating the cut batter can improve the batters ability to resist slip and scour. Steeper batters should be retained with engineer designed retaining walls. All excavations both temporary and permanent must be adequately battered or retained to prevent collapse. Temporary excavations for retaining walls can have exposed cut batters of 1 to 1.7 (vertical to horizontal) taken from the base of the excavation. These earthworks must incorporate shallow surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down-slope and clear of the construction area. Any exposed soil face should also be protected against the potential for stormwater erosion. Saturation of the exposed cut batter from prolonged rainfall will potentially de-stabilise the cut batter. Programming of the works must consider this possibility. Temporary backfilling of the slope may be required. Should these recommendations be un-achievable the builder should seek guidance from this office on temporary shoring, benching or other suitable techniques. The allotment will support a typical form of residential construction. Structural foundations should be designed by a competent person in accordance with AS 2870, accepted engineering theory and the geotechnical conditions reported by this office. All earthworks should be constructed in accordance with AS3798-1996 ‘Guidelines on earthworks for commercial and residential developments’ and sound engineering theory. The builder must ensure the stability of neighbouring structures is maintained through not undermining their foundations. This is achieved via restricting any earthworks to above a line radiating downwards at an angle of 1 in 1.2 (vertical to horizontal) from the base of the foundation/structure to be protected. The proposed method of construction is for a blockwork dwelling supported on ground slabs. The allotment is suitable for this form of construction, any excavations for lower floor areas must adhere to the recommendations contained herein. Retaining walls for landscaping purposes would need to be constructed with consideration of maintaining stability of the surrounding ground during construction. Such measures would include limiting the slope of any excavations to a slope of 1 vertical to 1.7 horizontal and protecting the works against stormwater scour. The retaining wall designs must allow for the lateral soil pressures expected including additional surcharging from sloping backfills. Although we consider the allotment stable in its current form there will always be a risk of landslip under severe stormwater conditions. Measures that will reduce this risk include the following but are not limited to. The finished ground surface should be leveled and graded to ensure no concentration of stormwater runoff leading to ground scour can occur. Any collected stormwater from areas other than the roof should be disposed of downslope from the proposed dwelling and should also ensure no ground scour can occur. All stormwater runoff from hard landscaped areas should be directed around the perimeter of the house and contained within the site via diversion bunding, scour proof drains and field inlets. SCG Consulting Engineers 4 SCG Ref: 26250(SL)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.