Council archive · source document
000A88A4.078.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 04:03.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:19.
PETRAC PTY LTD: Noosa North Shore Eco-Tourism Portal — Development Code 26 (8) Any proposed effluent disposal Control | (1) To design all traffic and | scheme is to be designed to Measures: | transport related infrastructure t protect the quality of ground j to comply with relevant water, surface waters and soils. | } regulations, (2) To prepare and submit information that demonstrates compliance with the stated policy with any application to | : develop the land. 7.7 ELEMENT 6 — Erosion Anp SEDIMENTATION CONTROL I Hl | Policy: | (1) To minimise soil erosion i associated with development of | the land. . 17.9 ELewenr 2 — Noise CONTROL | Performance _ (4) Use of best available : Policy: (1) To control noise generated by Objectives: | technology for prevention of both the construction activities erosion or release of i and operation of the contaminants to waters. j development, - (2) Stabilisation of all works sites ' (2) To minimise the impact of noise so that erosion of any part of and ensure acceptable levels of the land is minimised in the | amenity for persons residing on short and long term. i the land for tourist use and the waren arn po fe a ne ee rr ett ne “ i local community. Contro! | (1) The issue of erosion and E Oe ecresnmnn Stare heen neni acitsantn tonne tent Nieasures: sedimentation control is to be Performance § (1) To comply with the addressed in @ detailed Objectives: Environmental Protection Act, sedimentation and erosion Council By-Laws and any control plan thatis required to applicable neise limits. accompany any application for cone en nen om _| construction works on the land. Control (1) Noise levels are to be (2) Any party conducting works on Measures: minimised both during the the land is to ensure that all construction phase and management strategies Operational phase of the : specified in the detailed development. : sedimentation and erosion | (2) Inthe event of a complaint control plan are complied with being received regarding the i a ar fimes during the conduct i emission of noise from activities i OF INE WOTKS. i conducted on the land, the . | following limits are to apply at . | 7.8 ELEMENT? ~ TRAFFIC & TRANSPORT ] | the affected place measured in * ! accordance with the ; appropriate Australian ! Standard or guideline of the ensuring that traffic movements and transport infrastructure is j Policy: i (1) To develop the land whilst I Environmental Protection : h | Agency. : efficient, complies with : i regulatory requirements and i Statistical Sound Measurement : maintains the environmental | _ Parameter i values of the land. | ; Time Period ee nnn een - , Limiting Sound Pressure Level Performance | (1) Management of traffic to be in | . . Objectives: accordance with stated | Laman 15 minute interval requirements of Noosa : 7am - 6 pm (Daytime) Council, relevant State 65 dBYA) } Government legislation, and oN comply with the requirements of any applicable guidelines or statutes. Lax 15 minute interval 6 pm -7 pm (Evening) 60 dB(A) Lamax’ 15 minute interval 7pm -7 am (Nighi time) : 55 dB(A) rigidincosa\peirac\development codeVveport. doc 48/09/2003
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.078.tifRelated documentApplication case desk ↗
About this file
- File size
- 65 KB (small file)
- File type
- TIF
No other editions are linked here.