Council archive · source document
Decision Notice OPW19/0242
Officer: Mark Lewis Direct Telephone: 07 53296293 Our Reference: OPW19/0242 : JELDER Your Reference: 16394 1 April 2020 Pipiriki Pty Ltd C/- Superior Jetties PO Box 202 LABRADOR QLD 4215 [email protected] Dear Sir, Decision Notice Planning Act 2016 I refer to your application and advise that on 31 March 2020, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: OPW19/0242 Street address: 172 Gympie Tce Noosaville Qld 4566 Real property description: Lot 164 CP 907410 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Prescribed Tidal Works - Pontoon CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Site Specific Conditions Vessels associated with the marine use of the facility must only be moored within the approved lease area Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 16394-D01 D Site Plan, Elevation and General Notes prepared by Superior Jetties 10 March 2020 16394-D02 Pontoon P1 Construction Details prepared by Superior Jetties 25 July 2019 16394-D03 Pontoon P2 Construction Details prepared by Superior Jetties 25 July 2019 16394-D04 C Pile Set Out Plan prepared by Superior Jetties 10 March 2020 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with by 31 March 2022, unless an application to extend the currency period is approved by Council. General Conditions All structures associated with the jetty and pontoon must be constructed wholly within the approved area All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall or rock wall All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on at least one side of the walkway. No boatlifting devices are to be attached or moored at the structures for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the structures are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Planning Assessment Section (Development Audit & Response Officer 0428738563) to arrange the inspection. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DSDMI&P Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email SEQNorthSARAQdilgp.qld.gov.au Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 22 January 2020 (Reference No. 1911-14124 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Appeal Rights Referral Agency Response Approved Plans/Documents cc. Unitywater [email protected] Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 20 of 20 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 20 [Attachment: image10.png (image text)] Attachment 2—Advice to the aj General advice 1 “Terms and phrases used in this document are defined nthe Planning Act 2076 ts regulation or the State Development Assessment Provsions (SDAP) v2.5, fa word remains undefined thas its ordinary meaning. ‘Commencement Notfeation ~ Marine Execution Plan z “The commencement noifcation requires a Marine Execution Plan attached o suppor the “development of 3 notice to mariner and wider assessment of marine safety inthe local sre during the works. The MEP should include the folowing: Forecasted start and end dates Hours of work General methodology overview [Name of principal barges and marine equipment involved Barge Mooring Pin Etrame weather contingency plans 1247 point of contact to ensure Smely communication with VTS during exreme weather ‘and other marie emergencies. ‘Vessel taffc management plan to allow safe passage of passing traffic. ‘Marking of navigation hazards during construction, such as unattended piles and barge anchors. [Any other information to support the safe management ofthe marine works as identified by the ‘applicant, Mooring of vessels Itis noted thatthe vessels berth bows in, upstream side ofthe pontoon, have mooring piles to ‘secure the stem ofthe vessel. However. during weather events and flood conditions, there ‘may need tobe a consideration for different mooring arrangements. “The mooring arrangement does not allow for an intemal fairway for vessels to manosuvre to the Fiver, relying onthe unallocated state land adjacent. This precinct his wil need tobe carefully monitor for future developments. Deparment ot Ste Development, Mansachnng.reasiucture a Paring Paecers [Attachment: image11.png (image text)] Attachment 3—Reasons for referral agency response (Given under secon S67) of te Panning AC 2076) “The reasons for the department's decision ae: 4 The presorbe tidal works appestion i forthe redevelopment of a commercial pontoon system in the Noosa River. ‘+The proposed commercial pontoon redevelopmentis located within a coastal management district, erosion prone area and a high-risk martime development zone in a developed marina ‘+The proposed redevelopment of the commercial pontoon is general in accordance withthe State Development Assesment Provisions (SDAP) version 25. ‘© To ensure compliance with spectic performance outcomes of the SDAP, conditions have been applied to: ‘2 ensure the developmentis cared aut generally in accordance wih the plans of development ‘submitted with the application 12 ensure the development avoids or minimises adverse impacts on coastal resources and their values (© ensure landowners are aware they must take responsibility for ther damaged property 2s. ‘they can impact on coastal resources and publi safety 12. ensure any isturbance to acid sulfate sol ie managed to preventimpacts to coastal (© ensure demolition oftdal work occurs ina timely fashion and does not adversely impact on ‘coastal processes (© faciitate the monitoring of the development works for compliance purposes (© faciitate the mentoring of the development works for compliance purposes ‘© ensure that at ll mas, all ights on or above the davelonmant site do not interfere with safe navigation in surouncing waterways 12 ensure the development does not encroach on the navigable waterway in a way that impedes the safe passage of vessels, and (© ensure moored vessels do nt impede the safe navigation of waterways from neighbouring Material used in the assessment ofthe application: “The development application matenal and submited plans, ‘Responee tothe information request Planning Act 2016 tanning Regulation 2017 “The State Development Assecement Provisions (version 2.5), as published by the department ‘The Development Assessment Rules ‘SARA DA Mapping system Deparment ot Ste Development, Mansachnng.reasiucture a Paring Pagerers [Attachment: image14.png (image text)] eo waver sees eNous3e AONIOY Swansay ou wos pougjs SINaHNOOG ONY SNS sia uaNaT RST Siassah aaHLaae LIM [Attachment: image16.png (image text)] uoniaans C} yan sot NVTEZENOOINOE 1 [Attachment: image18.png (image text)] ovement State Development, Manufacturing, Infrastructure an Planning Cureeerance: «1011-4124 RA Counci rference: OPW100242 Yourrsference, 16304, 18 March 2020 PIPIRIKI PTY LTD Cl- Superior Jeties PO Box 202 LABRADOR QLD 4215, [email protected] ‘Attention: Mrs Jsokie Hogan Dear Mrs Hogan Response to request for “Generally in Accordance’ confirmation 172 Gympie Terace, Noosavile Lot 168 on cPao7410 ‘The Department of State Development, Manufacturing, Infrastructure and Planning (the department) acknowledges receipt ofthe request, dated 25 February 2020, for confirmation that your revised plan is ‘considera tobe generally in aosordance with the rferal agency response for development application 1011-14128 SRA. ‘Site detaits Sreet aaurens THE Gympie Tease, Noosavile Leton plan: Lot 104 on P207410 Lecal government area: "Noosa Shire Counc Application details ‘Proposed development Developme parm for aperatonal work for prescribed Waal work fr 2 pontoon for commercial use (bot hire) Referral Agency Response details ‘On 2 January 2020, te department sued a Soncurance agency response the Sesasamare manager, Noosa Shire Counc forthe application. The response directed the assessment managerto include conditions on any approval. The conditions referred to submited plans. Sn Eat cues er) agra ie nem tang. Lev! 3, Ft facecyae 2S eor ta waco LO Page ter? = [Attachment: image19.png (image text)] Decision “The department has considered your request and sdvses the minor change t We locaton oFiwo ple ‘moorings as amended by Superior Jeties, rawing tle Proposed Ple Set Out Plan, dsted 10 March 2020, plan reference 16364-0009, revision C is generally in accordance with Fie Set Out Fisn, prepared by Superior Jats, dated 18 December 2010, plan reference 16904000, revision A. you require any further information, please contact Danika Cowie, Principal Planning Officer, on (07) £5862 0770, or via emall SEQNonhSARA@dsdmip qld. gov.au who wil be able to assist. ‘Yours sincerely Garth Nolan “Manager (Planning) c= Noosa Shire Count; malepneesa ql gov. au Deparment ot Ste Development, Mansachnng. east a Paring Page zor? [Attachment: image3.png (image text)] ee) NOOSA COUNCIL [Attachment: image5.png (image text)] ‘SARA reference: 1011-14124 SRA, Avoensiand State Development, Manufacturing. Infrastructure nd Planning Councl reference: OPW 100242 ‘Apples reference: 16394 22 January 2020 chief Execute Offcer Noosa Shire Couna! POBox 141 ‘Tewantin Qld 4585 rmaii@noosa qld gov.2u ‘Atention: Mr Mork Lewis Dear MrLewis SARA response—172 Gympie Terrace, Noosaville (Reieralapeny response gen unde seion 5 oe Paming At 2016) “The development application desorbed below was confirmed as property referred by the Department of State Development, Manufacturing, Infrastructure and Planning on 12 November 2018, Response ‘Outcome Date of response: Conctons Advice: Reasons: Development details Description: “SARA role: [SARA tigger Pagers Referal agency response — wth conaons 122 January 2020 ‘The conditions in Attachment 1 must be attached to any development approval ‘Advice to the applicants in Attachment 2 “The ressons forthe refer agency response are in Afachment 3. Development permit Operational work for prescribed tidal works fora commercial pontoon Feferal agency ‘Schedule 10, Part 17, Divison 3, Table 1 (Planning Regulation 2017) ‘Tidal works cr work 3 coastal management dict ‘Schedule 10, Part 17, Division 3, Table 2 (Planning Regulation 2017) Ea cena pert ‘ite aren swag Lee, 2 enue oosyscre oar Ha, Mafoshycre GLO S58 [Attachment: image6.png (image text)] “SARA reference: ‘Assessment Manager: ‘Steet adress: Real property description: Applicant name: Applicant contact details: Representations “Tidal works or workin a coastal management gistct 1911-14124 SRA, Noosa Shire Counei! 172 Gympie Terace, Noosaville Lot 104 on cPe07410 Pipi Pry Lid C1 Superior Jeties PO Box 202, LABRADOR QLD 4215, [email protected] “Fas appicant may make represeriatons to a SOnouTence agency, a any tne before he applications Gecided, about changing a matter inthe referal agency response (5.30 Development Assessment ules) Copies of the relevant provisions are in Attachment 4 |A copy of this response has been sent tothe applicant for ther information. For further information please contact Danika Cowie, Principal Planring Offcer, on (07) 5352 8778 or via ‘email [email protected]. gov au who will be pleased to assist Deparment ot Ste Development, Mansachnng.reasiucture a Paring Pagezers [Attachment: image7.png (image text)] Attachment 1—Referral (Under secon S8( TVD) of Bs Planing Act 2076 We Yolwing Sondbone MTD SERGI Sy GOGAT ‘spprovlelaing to this appeaton) (Copies ofthe plans and specileatons referenced blow ae found st ‘Ataorment 6). Conditions Condition timing ‘Operational work for prescribed tidal works ‘ened ‘semi ule 10, Part 17, Division 3, Table 1, em 1_—The chief excoutve administering the Planning Act 2016 nominates the Director-General ofthe Department of Environment and Science tobe the ‘enforcement authority forthe development to which ths development approval relates for the istration and enforcement of any matter relating to the folowing constion\s)- 7 “The development must be cavied out generally in accordance with ‘the folowing plan: '+ Ste Plan, Elevation and General Notes prepared by Superior ties, dated 16/12/2010, reference 16804-D01 Revision B. |+ Pontoon P1 Construction Details prepared by Superior Jets, dated 25772018, reference 16304-D02. |+ Pontoon P2 Construction Details prepared by Superior ties, dated 25772018, reference 16304-D03. “Atal mes For the proposed works, ony use dean materials and ensure that ‘the works do not cause contamination. To achiave this oly use ‘materials which are fee from contaminants as defined under section 11 ofthe Environmental Protection Act 1994, Forthe duration ofthe works ‘Erosion and sediment control measures which ar in seaordance ‘with Best Pracoe Erosion and Sediment Contol (GESC) {guidelines for Australia (Intemational Erosion Control Associaton), ‘eto be installed and maintained to prevent the release of sediment so tidal waters. Forthe duration ofthe works ‘Should pontoon system collapse fai or cthersise suffer structural ‘consequences which impsct her integriy or ably to function = intended, the works must be: () reinstated in aocordance wih this development approval or (@) remove and disposed of stan appropristlyoenced faci. “Ae soon as reasonably practicable subsequent tothe damage. (@) In the event that the works cause disturbance or ordisation of _2cidsullate sol, the affected soll must be treated and thereafter ‘managed (uti the affected soilhas been neutralised or ‘contained) in accordance withthe curent Queensland Acid ‘Sufste Sol Technical Manual Soi management guidelines, prepared by the Department of Science, Information Technology, Innovation and the Arts, 2014 (©) Certtcation by an appropriately qualified person(s), confirming ‘hat the affected sol has been neutralised or contained, in ‘accordance with (a) above is to be provided to [email protected] au o mailed to: 2) Upon disturbance oF ‘nigiston unt the. ‘ffected sol has been neutralised or contained, Jb) At the time the soils have bean Department of Environment and Science neutralised or Permit and License Management contained, Implementation and Supper Unt Deparment ot Ste Development, Mansachnng.reasiucture a Paring Pagesers [Attachment: image8.png (image text)] (GPO Box 2464 Brisbane Gi 4001 “The pars of the existing pontoon structure fo be removed must be <sposed of to an appropriately licenced faity ‘Within ene month of ‘commencement ofthe emaltion ‘Se of any matter relating to the following condton(s) lle 10, Par 17, Dhision 3, Table 2, em 1 The chief executive administering the Planning Act 2016 nominates the Director-General ofthe Department of Transport and Main Reads the Deputy Director-General of the Department of Justice and Atomey-Genaral to be the enforcement authority {or the development to whic this development approval relates forthe administration and enforcement 7. (a) As Constructed? drawings ofthe approved stuctre must be provided to Regional Haroour Master (Brisbane) - Address blow: Regional Harbour Master (Brisbane) Maritime Operations Base MacArthur Avenue East Finkenda QLD 4008 Email MSQ_IDAS, [email protected] ‘Within two (2) weeks of ‘the completion of the works. (@) Provide witien notice to Regional Harbour Master (Brisbane) — ‘Adcress below, when the development authorsed under tis ‘approvals scheduled to commence Each notice must state tis application number, the location and ame of registered place and the condition umber under which the notice is beng given. The commencement notcation is 10 include a marine execution pian. (©) Provide written notice to Regional Harbour Master (Brisbane) — ‘Address below when the development authorised under this ‘Seproval has Dean completed Each notice must state tis application number, the location and name of registered place and the condtion number under which {he oti s being gen Regional Harbour Master (Brisbane) Mariime Operations Base MacArthur Avenue East Pinkenbs GLO 4008 mai: MSQ_IDAS,Brishane@tr qld. gov.au )Ateast wo) weeks prior tothe ‘commencement of works. (Within 0 (2) wosks ofthe completion of works. “The development must be caried cut generally in accordance with ‘the folowing plans: ‘+ Ste Plan, Elevation and General Notes prepared by Superior ‘Jefties, dated 18 Desembar 2010, plan no. 16304-001. version & ‘+ Pie Set Out Plan prepared by Superior Jeties, dated 16 December 2010, plan no, 16304-000, version A. Forthe duration ofthe works “Allvessels, sructures, plant and equipment associated wih the Construction ofthe approved works must be timarked in accordance “withthe folowing specfiostions and requirements such that Undertaking the construction works does not cause a isk the safe navigation of ships: ‘Wie the works are cccuring. Deparment ot Ste Development, Mansachnng.reasiucture a Paring Pagesers [Attachment: image9.png (image text)] (2) Any anchors deployed must be marked wih yellow buoys and ‘ted with FL yellow ight te, (6) Any unattended piles are to be ted with retrorefective tape Lighting provided must not obscure, disguise or otherwise interfere withthe affacvensss of navigational ighting Ti,_| The structure must be marked in sooordance wit the flowing specifications, such that # does not cause a risk to the safe navigation of other ships: (@) Piles to be fted with revo-retlecive tape. Lighting provided must not obscure, disguise or otherwise interfere withthe affacvensss of navigational ighting “Bial mes 72, _| The constrision, oparaton or maintenance of he sructur, and any ship moored a his stucture, must not impede the safe navigation of ther ships or restrict safe access to or from neighbour structures, “Bial mes 73._| (a) Any debris or emilar obsiructon encourtared whist underaking ‘the work must be cisposed of atthe applicants cost. (©) All piles andlor structures o be demolished, both above and below the waterine must be completely exractedremoved. “Bial mes Deparment ot Ste Development, Mansachnng.reasiucture a Paring Pagesers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW19/0242Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
- DOCX
No other editions are linked here.