Council archive · source document
RFI - Attachment C - Slope Stability Assessment and Geotechnical report · MCU20/0026
Project No. 1-22543 Page | 21 June, 2020 Ref: 1-22543, 2020-05-20, BR SSA VER 1 Sanya Holdings – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 40 Park Crescent, Sunshine Beach Dense Sand = 20kPa Lateral Capacity Broms (1966) has related the values of Ks and d to effective angle of shearing resistance of cohesionless soils and various pile materials, as shown in Table 7. TABLE 7 VALUES OF KS d Ks Pile Material Degrees Low Relative Density High Relative Density Steel 20 0.5 1.0 Concrete ¾ 1.0 2.0 It should be noted that the calculated ultimate resistance of a given pile should also take into account the installation effects of that particular type, i.e. whether displacement or non- displacement pile performance can be expected. 6.2.6 Slab on Ground General Field and laboratory test results indicate that the existing natural soils are suitable for a conventional slab on natural ground construction. In areas of any fill, localised pedestals would be required to suspend the slab. For constructability of the proposed slab, it is generally preferred to have the same type of slab across the proposed development site. Sub-Base It is suggested that a layer of sub-base be provided under all concrete slabs. The sub-base material should be compacted to a density not less than 95% of maximum dry density in accordance with AS 1289 5.2.1 (Modified compaction). The sub-base is provided under a concrete slab to:- Provide a stable 'working platform' on which to operate construction equipment; Facilitate the provision of a uniform bearing surface under the slab. Sub-base material should be of good quality conforming to requirements (minimum) of Material Type 2.4 as specified in the Queensland Department of Transport, Standard Specification MRS 11.05, Unbound Pavements (December, 1993). 6.2.7 Design Considerations Inspections It is recommended that inspections be undertaken by an experienced geotechnical engineer from Soil Surveys Engineering following footing excavations to confirm the adequacy of the founding soils. Inspections should be carried out prior to placement of reinforcing steel and ordering of concrete. SOIL SURVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment C - Slope Stability Assessment and Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.