Council archive · source document
RFI - Attachment C - Slope Stability Assessment and Geotechnical report · MCU20/0026
Project No. 1-22543 Page | 28 June, 2020 Ref: 1-22543, 2020-05-20, BR SSA VER 1 Sanya Holdings - Slope Stability Assessment and Geotechnical Report - Proposed Residence, 40 Park Crescent, Sunshine Beach method of drilling, the frequency of sampling and testing and the possibility of other than “straight line” variations between the boreholes. Subsurface conditions between and below boreholes may vary significantly from conditions encountered at the borehole locations. Please note, if following detailed design, the founding depth of any footings or piers/piles is within 3B (B = footing width/pier diameter) above the termination depth of the boreholes/pits/CPTU or if any excavations extend below the borehole/pit/CPTU termination levels, then Soil Surveys Engineering should be contacted immediately. If the above were to occur then the geotechnical data in this report should be considered preliminary only; additional investigation is likely to be required. In the event that conditions encountered on site during construction appear to vary from those expected from the information contained in the report, the Company strongly recommends that it immediately be notified. Most problems are more readily resolved when conditions are exposed than at some later stage, after the event. Should Soil Surveys Engineering not be notified or if this notification is delayed, then Soil Surveys can not be held responsible for the effect that any variation has on any aspect of the development. Soil Surveys Engineering consider that a documentation review service (during the design phase and prior to construction) to verify that the intent of geotechnical recommendations is properly reflected in the design, along with construction inspections, forms a very important component of the geotechnical engineering design service/process. The geotechnical review ensures geotechnical risks to our Client and their project are minimised at the design and tender stage of the project. Further, with Soil Surveys Engineering being commissioned to carry out geotechnical construction inspections, an opportunity at the time of construction to confirm any assumptions made in the preparation of the report and allow the effect of any normally occurring variation in ground conditions to be assessed with respect to construction becomes available. The above statements are not intended to reduce the level of responsibility accepted by Soil Surveys Engineering in accordance with our commission, but rather to ensure that all parties who may rely on this report are aware of the responsibilities each assumes in doing so and the risks they accept should they decline to have Soil Surveys Engineering carry out a geotechnical documentation review and geotechnical construction inspections. It is highly recommended that the Client avail themselves of these review and inspection services; our standard rates will apply. Ee - 2 G. BURKITT _ N.T. PERKINS (RPEQ 7527) ENGINEERING GEOLOGIST PRINCIPAL ENGINEERING GEOLOGIST For and on behalf of SOIL SURVEYS ENGINEERING PTY LIMITED SOIL SURVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment C - Slope Stability Assessment and Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.