Original source · versioned page text
Town Planning Cover Letter
stored in bulk from the risk engineer to certify that: has been implemented.
of landslide. 1. the stability of the s ite,
including associated
buildings and
infrastructure, will be
maintained and
operational for the life
of the development;
2. the s ite is not subject
to the risk of landslide
activity originating
from other land,
including land above
the s ite; and
3. development of the
site will not increase
the risk of landslide
activity on other land;
Editor's Note— PSP8
Natural Hazards provides
further guidance on
assessing landslide hazard.
AND
AO1.4
Any specific measures
identified in a site specific
geotechnical assessment for
stabilising the site or
development are to be fully
implemented.
VISITOR ACCOMMODATION CODE
Performance Outcome Acceptable Outcome Response
PO8 AO8.2 Complies.
Buildings and outdoor The entry points to
spaces are designed to allow accommodation are clearly
for natural surveillance identifiable and accessible
without adversely impacting from the car parking areas
the privacy of guests or and pathways without
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.