OPERATIONAL WORKS - LANDSCAPE PLANS
1 INTO 3 LOTS
Lot 10 on SP118458
FOR
NOOSA COUNCIL
AT
62 LAKE MACDONALD DRIVE, COOROY
Development Application No.: TBC
July 2025
COVEY ASSOCIATES PTY LTD
ABN 59 137 305 992
(07) 5443 7777
[email protected]
124 DUPORTH AVENUE
PO BOX 16
MAROOCHYDORE QLD 4558
PROJECT No. 233467 - FOR OPERATIONAL WORKS
PROJECT MANAGER: CHRIS TEMMERMAN PH - 5433 7777
LANDSCAPE ARCHITECT: JAMES OLIVER PH - 5433 7777
LIST OF ASSOCIATED DRAWINGS
Ref Description
L000 Cover Sheet
L001 Sheet Set-out & Plant schedules
L002 Landscape Specifications
L003 Overall Site Plan
L100 Lake MacDonald Drive Landscape Works
L200 Dianella Court Intersection Landscape Works
L201 Proposed Internal Road Landscape Works
L202 Buffer Sections and Details
L300 Connection Easement 1
L400 Connection Easement 2
L500 Bio Basin Plan, Details & Plant schedule
L501 Lot 100 Eastern Buffer and Details
L600 Landscape Details
L601 Landscape Details
AREA OF WORKS
LOCALITY PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 7 (of 14)
Page 2
Plant Schedule CODE IBOTANICAL NAME COMMON NAME POT SIZE QTY Street Trees BUC cel |Buck inghamia celsissima Ivory Curl Tree 45L 17 CAL sal Callistemon salignus Bottlebrush 45L 2 GRE bai Grevillea Baileyana Brown Silky Oak 45L 3 STE sin |Stenocarpus sinuatus Firewheel Tree 45L 4 TRI LU Tristaniopsis laurina ‘Luscious’ Water Gum 45L 21 WAT flo Waterhousea floribunda Weeping Lilly Pilly 45L 14 XAN chr \Xanthostemon chrysanthus Golden Penda 45L 2 Shrubs Total 63 |ALP cae |Alpinia caerulea Native Ginger 200mm 11 MEL MQ |Melaleuca ‘Mini Quini’ Mini Quini 200mm. 8 MEL thy |Melaleuca thymifolia Thyme Honey-myrtle 200mm 4 Groundcovers - General Planting Area Total 23 |AUS dul |Austromyrtus dulcis Midyim 140mm 2 BAN rob Banksia robur ‘Swamp Banksia 140mm 7 DIA cae Dianella caerulea Flax Lily 140mm 155 Fic nod Ficinia nodosa Knobby Club Rush 140mm 8 LOM hys |Lomandra hystrix Mat Rush 140mm 53 LOM mul |Lomandra multiflora Club Rush 140mm 16 MEL MQ |Melaleuca ‘Mini Quini’ Mini Quini 140mm 9 MET LE |Metrosideros ‘Little Ewan’ Little Ewan 140mm 7 MYO par |Myoporum parvifolium Creeping Boobialla 140mm 308 Median Plantings Total 565 CALRR Callistemon pearsonii Rocky Rambler Rocky Rambler 200mm. 6 CAL WA Callistemon White Anzac White Anzac 200mm 6 DIA cae Dianella caerulea Flax Lily 200mm 15 LOM mul |Lomandra multiflora Club Rush 200mm, 4 MEL MQ Melaleuca ‘Mini Quni’ Mini Quini 200mm, 4 Total 35 Trees ELA eum |Elaeocarpus eumundii Eumundi Quandong 25 30 FIC ob! Ficus obliqua ‘Smallteaved Fig 25L 11 GLO sum __|Glochidion sumatranum UmbrellaCheeseTree 25L. 10 Shrubs Total 51 ACM PR [Acmena smithii ‘Purple Rain’ Purple Rain 200mm 45 ALP cae |Alpinia caerulea Native Ginger 200mm 48 MEL MQ |Melaleuca ‘Mini Quini’ Mini Quini 200mm. 27 MET LE |Metrosideros ‘Little Ewan’ Little Ewan 200mm, 27 Groundcovers - General Planting Area Total 147 ALP cae |Alpinia caerulea Native Ginger 140mm 162 |AUS dul |Austromyrtus dulcis Midyim. 140mm 162 BAN spi Banksia spinulosa Golden candlesticks 140mm 162 CAL GBF ‘Callistemon salignus ‘Great Balls of Fire’ _|Great Balls of Fire 140mm 162 Key Plan LOM hys |Lomandra hystrix Mat Rush 140mm 162 Total 810 —— — SITEAREA — SHEET LAYOUT Street Trees - Refer to Streetscape Area Schedule Above Shrubs Legend [ACM PR __[Acmena smithii Purple Rain’ Purple Rain 200mm 2 EXISTING PROPERTY BOUNDARY TURF BI BOLLARDS - TYPE 1 ALP cae |Aipinie ceerufee Native Ginger 20min 34 —— TU} | REFER SPECINOTES v . REFER TO DETAIL AUS dul Austromyrtus dulcis Midyim 200mm 42 z REFER TO DETAIL BAN rob Banksia robur ‘Swamp Banksia 200mm. 24 — NEW PROPERTY BOUNDARY ENC ANG AREA Bz 1 ee BANspi___|Banksia spinulosa (Golden candlesticks 200mm 25 wl REFER TO DETAIL ‘ ‘ BLE spp. __|Blechnum spp. Water Fern 200mm 48 MEDIAN PLANTING AREA ROOT BARRIER CALRR Callistemon pearsonii Rocky Rambler Rocky Rambler 200mm 16 a REFER SPECINOTES -—— REFER SPECINOTES GRE ban Grevillea banksii Red Flowered Silk Oak 200mm 75 REFER TO DETAIL REFER TO DETAIL De ARV AMENITY REVEG AREA EASTERN BUFFER TO LO” JAC sco__|Jacksonia scoparia a Natie bison 2oam ae TREES FOR REMOVAL REFER SPECINOTES REFER SPECINOTES LEP pol |Leptospermum polygalifolium. Wild May 200mm, 81 REFER VEGETATION ABSEBGMENT SCHEDULE REFER DETAIL REFER TO DETAIL LOM hys |Lomandra hystrix Mat Rush 200mm 98 TE TIMBER EDGE MEL MQ |Melaleuca ‘Mini Quini’ Mini Quini 200mm. 5 Fee oo SPEC) DETAIL PUL wil Pultenea villosa hairy bush-pea 200mm 42 TREES Pi PAVEMENT TYPE 1 SYZBB Syzygium australe ‘Baby Boomer’ Baby Boomer 200mm. 71 REFER TO PLANT SCHEDULE ee ga refer speonores Grasses and Groundcovers - Amenity Revegetation Area Total 609 BIO BASIN PLANTING AREA |AUS dul |Austromyrtus dulcis Midyim. 140mm 490 BRR Perea soncnlotes CAR app [Carex appressa Tall Sedge 140mm 490 FEATURE PLANTS, SHRUBS AND GRASSES REFER TO DETAIL DIA cae Dianella caerulea Flax Lily 140mm 490 REFER TO PLANT SCHEDULE cM SURFACE TREATMENT LOM mul |Lomandra multifiora Club Rush 740mm 290 COIR AND MULCH - REFER SPEC GROUNDCOVERS OR MASS PLANTINGS TOTAL = 186 SQU. METRES MEL MQ Melaleuca ‘Mini Quni’ Mini Quini 140mm 490 p 4 REFER TOPLANT SOrEbULE MAINTENANCE ACCESS GATE MYO par |Myoporum parvifolium (Creeping Boobialla 740mm 490 —— REFER TO BIO BASIN PLAN & NOOSA COUNCIL STANDARD DETAIL Total 2940 Contractor shall take full account of documentation for Civil Engineering, Hydraulic and Electrical Engineering Works. SITE PRELIMINARIES Contractor to confirm planting boundaries / extent of works / loading / handling areas etc prior to commencement. Contractor to attend pre-start meeting with Superintendent and Council. roved by: J Oliver (AILA) Checked- JO hans SU ONS = Aoproved by: James Over (ALLA) Drawing ttle - Project - / Site - ; Project No. 233467 SheetNo. LOO1 Design- JO Drawn- JO E | s7042025 | SPECIES CHANGE 0 LANDSCAPE COVER SHEET Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy — | avnaanes UPDATED PROJECT NATE wR cove Digital Ref : 207L000cowestees —Iggue: F Scales- AS SHOWN 5 [aba | RRO = a 124 DUPORTH AVENUE Ph (07) 5443 777 Client - This Document is copyright and shall not be copied 7 [1.052024 | PRELWINARY - FOR COORDINATION ONLY 0 PO BOX 16 Fax (07) 5449 757 Noosa Council without written approval, nor shall it be used except - MAROOCHYDORE QLD 4558 \_ oat Stage- FOR APPROVAL Issue Date Description By oe for the Development and the Site Specified. TS
Page 3
SPECIFICATION
SCOPE OF WORKS TURF - SUPPLY AND LAY ESTABLISHMENT
MULCH Turf installed to road verge must be "A" grade Couch with minimum sod depth of 25 a) Establishment period is to begin from the date of Practical Completion, as
Landscape works to generally include the following: mm. All turf must be installed within 24 hours of being cut. Runs must butt hard against nominated by the superintendent.
Ensure mulch is produced by chipper, aged, comprised of leaf and limb
· Site preliminaries each other and seams topdressed with topsoil. Any depressions / damage within turf b) Establishment period is to be 12 weeks unless otherwise specified.
material of varying sizes, free of foreign matter including rock, soil/sediment
areas are to be replaced or top dressed with clean river sand as directed by
· Top soil soil test and analysis contamination and is applied to all planting areas as per requirements. Rake c) Monitor plant performance and stress frequently and
Superintendent.
to an even surface 50mm below the surrounding finished levels. Avoid take appropriate remedial action. Soil moisture levels
· Excavation and drainage placement against green plant stems and keep below tree trunk flares. Mulch
· Topsoil supply amelioration and placement to finish 50mm below adjoining edging. are critical during early establishment.
· Turf supply and lay
CONTAINERISED PLANT MATERIAL d) Apply a liquid fertiliser to all plants immediately after planting and again at 4
Mulch to comply with requirements set out in AS4454:2012- Composts, Soil weeks.
· Bio basin - install/removal of sacrificial turf and install of macrophyte Conditioners and Mulches. Superintendent to approve plant material prior to planting. Planting is to be carried out e) Mow turf fortnightly.
species as per documentation in a manner consistent with good horticultural practice. Plants are to be planted at
Mulch to be free of damaging material and preferably aged for a minimum of f) Prune shrubs and trees as required.
· Landscape treatment to bio basin and surrounding batters two (2) months after chipping, before being spread on site. correct depth allowing for 'settling'. Soil greater than 10mm in depth is not to be placed
over the rootball or against the stem. All 300mm pot and larger plant material is to be g) Remove all nursery stakes at time of planting.
· Mowing edge supply and install Forest blend mulch is the preferred mulch for all areas.
guyed and staked as per advanced Tree Planting Detail unless otherwise approved by h) Replace failed, dead or dying trees and plants.
· Containerised plant material - supply and installation of planting stock as Tip mulch is not appropriate for the following reasons: the Superintendent. Smaller plant stock is to be staked as necessary. Stakes shall not i) Reinstate any defective or poorly performing landscape works during the
per planting schedules o may not be of uniform size and quality. pass through the rootball of plant at time of planting or any time thereafter. Nursery establishment period.
o it may contain material from diseased vegetation, which may stakes are to be removed within 3 months of planting.
· Organic mulch - supply and installation spread potentially fatal diseases (e.g. Phellinus), fungus or j) Contractor shall record inspections in a written log book.
· 12 week establishment of landscape works pathogens, (e.g. Phytophtora). Stock may be rejected if plants are: k) All watering shall be recorded and water dockets supplied upon request from
· 12 week establishment of biobasin o mulch that is not properly composted may introduce weed seeds. Superintendent. Watering hours shall not exceed that scheduled in the Landscape
o can often be hydrophobic, causing drought stress in plants. a) undersized proportional to specified container size or if Contract unless explicitly written instructions from the Superintendent is obtained.
· Attendance at Council pre-start, on and off-maintenance meetings
o possible growth inhibiting properties due to phytotoxic chemicals e.g. the root system is underdeveloped l) Mulch levels are to be the depth as specified throughout the establishment period
· 9 month maintenance of landscape works following establishment period polyphenols. and at the end of the establishment period.
b) oversized proportional to specified container size or
· 9 month maintenance of biobasin planting following establishment period o poorly composted mulch may cause nitrogen draw down, locking up
nutrients needed for plant growth. severely root bound
Exclusions to Landscape Scope
o may contain metals and other rubbish which may cause a health risk c) unbalanced or uncharacteristic of normal or specified MAINTENANCE
to workers. growth pattern for the species
Footpaths Mulch to be spread before planting to prevent erosion, loss of soil moisture a) Maintenance period is to be 9 months from the end of the establishment period
Retaining Walls and weed seed germination. d) not suitably acclimatised for the specific environment unless otherwise specified.
Fencing Mulch is to be installed as per landscape drawing, to a depth of 100mm e) diseased, infested with pests or suffering from other b) Monitor plant performance and stress frequently and
Bulk shaping of earthworks & fill unless otherwise specified. form of significant stress take appropriate remedial action.
Stormwater inlets/outlets to Bio-basin Mulch depth is not to exceed 150mm. Deep mulching - particularly with mulch
containing fines - can restrict air flow causing anaerobic decomposition to f) tree stock is not compliant with AS2303:2018-Tree Stock for Landscape Use, and c) Mow turf fortnightly.
take place. A possible side effect of this is alcohol production which has the is not certified as compliant by level 5 Arborist d) Prune shrubs and trees as required.
SOIL AND MULCH potential to damage plant cell walls and roots. Anaerobic compost may not e) Remove all stakes prior to off-maintenance inspection.
have a high enough temperatures to effectively destroy pathogens.
f) Fertilise all plants during maintenance period as required.
SOIL TESTING Rake mulch to an even surface level with surrounding finish.
Spread mulch so it is smooth and evenly graded between design surface g) Replace damaged / failed trees and plants.
A bulked sample soil test from a NATA registered laboratory on site topsoil is
being obtained and will be provided to the contractor. Test for pH, organic
levels, sloped towards the base of the plant stems. STREET TREE SETBACK DISTANCES h) Reinstate any damaged landscape works damaged during the maintenance
period.
Mulches are not to be in contact with plant stems. Ensure mulch is no closer
matter, Ca / Mg Ratio, Nitrate-N, Ammonium-N, P, Ca, Mg, K, So, S, Al, Si, B, to the stem than: i) Contractor shall record inspections in a written log book.
From street lights: 3m
Fe, Ma, Cu, Z, Mo, Co, Se. Soil is to be ameliorated to appropriate levels for o 50mm for shrubs
From driveways: 2.5m
proposed planting in accordance with recommendations of suitably qualified o 100mm for trees. From sw pits: 2m REINSTATEMENT
agronomist or soil scientist. Obtain seperate tests for various soils used in Form a small bermed dish around plant stems to facilitate flow of water and From underground water / sewer: 1m The Contractor will be responsible for the reinstatement of any surfaces, items, structures
works. nutrients to rootball. From all other underground services: 1m or anything disturbed or damaged as a result of the execution of the works by them or
Preferably, the area beneath tree canopy (dripline) is to be blanket mulched. their sub-contractors. Remove any debris, spoil, surplus materials from the site
EXCAVATION AND DRAINAGE Surrounds of plants planted in riplines (plough lines "ripped" into soil to Provide Arborist AS2303:2018-Tree Stock for Landscape Use certification for all trees. responsibly. Damage caused by vandalism or third parties shall be rectified and treated
decompact and loosen soil) and grass areas, provide mulch to 750mm Provide soil amelioration certificate from qualified Agronomist. Provide AS4419 compliance as a variation subject to written approval from the Superintendent.
Break up and remove any debris from construction works to achieve required diameter with trunk at centre. certificate for all imported soil
planting depths. Excavate to bring the subsoil to a minimum of 300 mm below
finished design levels. Shape the subsoil to fall to subsoil drains where CONTRACT
applicable. Break up the subsoil to a further depth of 100-150 mm (refer to Hoop pine mulch is not to be used around species that are susceptible to
spec). Sub-surface drainage as per the attached details is to be incorporated fungal infection by Phellinus noxius, for example: EXISTING TREE - PROTECTION METHODOLGY
Any variation to the contract must be made in writing by the Superintendent. Any
to all planting areas that are enclosed by hard edging, are located on o Araucaria spp.
Tree protection fencing (TPZ) is to consist of orange plastic safety mesh fence (1m high) variation to agreed schedule of rates shall not be considered unless the contractor has
controlled compacted fill and not otherwise drained. Imported and site soil is o Ficus spp. written approval from the Superintendent to carry out such additional work or variation
to be mixed insitu. o Eucalypts (Eucalyptus, Corymbia and Angophora species) supported by star picket posts at nominal 1.5m centres and tied in three locations with plastic
prior to the work being carried out. The whole of the contract including maintenance shall
o Poinciana (Delonix regia) rip-stop ties or galvanised wire nom. 3mm gauge. Provide 3mm galvanised wire weaved
be completed to the satisfaction of the Superintendent.
TOPSOIL - SUPPLY AND PLACEMENT through top edge of mesh and secure tightly to each star picket post. Fix 'Construction No Go
o Jacaranda (Jacaranda mimosifolia)
Zone' sign at top section of fence at 25m intervals. Ensure that no storage or placement of bulk
o Avocado (Persea americana).
Turf areas are to be filled with fit for purpose ameliorated site topsoil to a and/or harmful materials occurs under protected tree drip-lines; do not store or manoeuver VEHICLES
minimum of 100 mm depth over cultivated sub-grade. heavy machinery under or within the drip-line of protected tree canopies; do not attach guys or
SEDIMENT AND EROSION stays to any protected trees; and any excavation within the tree drip-line is to be done by hand
General Planting areas are to be filled with fit for purpose ameliorated site The Contractor shall ensure that measures are undertaken to minimize methods to prevent damage to root systems. Ensure suitable stormwater measures/devices The Contractor is to ensure that transport used in the execution of the project will prevent
topsoil to a minimum of 300 mm depth over cultivated sub-grade. erosion of exposed surfaces during the life of the project. Any localized are implemented to prevent contamination due to erosion of disturbed areas. dropping of materials on streets, public and private areas. Cover all loads appropriately to
overland flow causing scour through the site is to be rectified by the ensure no loss of load. Ensure that all wheels, tracks and body surfaces of all vehicles
Contractor with appropriate methods determined in consultation with the All debris such as plastics, building materials and other dumped vegetative matter is to be and plant entering and leaving the site are free of mud and debris and that site soil or
Amenity Revegetation planting areas are to be filled with fit for purpose Superintendent. The Contractor shall inspect the site after each significant disposed of appropriately and at regular intervals and not stockpiled on site unless written debris is not carried onto adjacent streets or lands.
ameliorated site topsoil to a minimum of 100 mm depth over cultivated rain event for erosion. instructions from Superintendent.
sub-grade.
Landscape works are to be undertaken as per MRTS 16. Existing trees marked to be retained must be protected from damage to ensure that the tree
Street tree pits are to be are to be filled with fit for purpose ameliorated site health is maintained with appropriate fences and signage. The following is the minimum
topsoil to a minimum of 0.5m³ volume. ROOT BARRIERS excepted:
Install root barrier as noted on Landscape Plans L200 and L201. - Do not store or place bulk and/or harmful materials under or within the drip line of trees.
Supplier of any imported soils, as well as intended mix is to be nominated - Do not store or maneuver heavy machinery under or within the drip line of the tree canopy.
prior to start of works and approved by Superintendent. Suggested root barrier 'Rootstop Recycled Root Barrier' 900mm wide. - Prevent wind blown materials such as cement from harming the tree.
Excavate 900mm deep trench along edge of pipe (ensure care is taken - Prevent damage to tree bark. Do not attach stays, guys or like to the trees.
Add and mix composted material to topsoil when spreading to help inoculate adjacent any subsurface infrastructure). Install root barrier to provide linear
soil. - Any excavation within the tree drip line is to be done by hand methods to prevent damage to
barrier and backfill. Avoid having joins - if join is unavoidable ensure
A slow release fertiliser such as 'Osmocote' or equivalent is to be root systems.
appropriate barrier jointing tape is applied - suggested product to be Rootstop
incorporated with individual planting in accordance with the Manufacturer's Barrier Jointing Tape - RST7230. Suggested supplier to be Arbor Green
recommendations. Landscape Products Tel. 1300 760 642.
Soil is to be mounded to facilitate good drainage (max 1:3 grade).
To improve the water holding capacity of the dry and well drained soils on
site, addition of a moisture holding product such as 'Hydrocell' or 'Rainsaver'
is recommended following Manufacturer's guidelines.
Finish topsoil flush with abutting kerbs, mowing strips, and paved surfaces
unless otherwise shown. Feather edges into adjoining undisturbed ground.
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L002
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO
LANDSCAPE SPECIFICATIONS Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : 233467 L000 Cover Sheets Issue : F
C 12.03.2025 FOR APPROVAL JO
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
Page 4
TE
TE
DIANELLA COURT
10m Eastern Landscape Buffer.
Refer to plans and plant schedule for species.
B1 B1 B1 B1 B1 B2 B2 B2 B1
INTERNAL ROADWAY
B1
B1
B1
B2
B1
B2
B2
B1
B1
B1
B1
B1
B1
B1
B1
Connection Easement No. 1
B1
B1
B1
B1
B1
B1
B1
LAKE MACD
Connection Easement No. 2
LOT 1 LOT 2 LOT 3
ONALD DR
B1
B1
IV
B2
B2
B1
B2
B1
B1
B1
B1
B1
E
LOT 100
0 5 10 15 20 25 (A1) 1:500 50
Metres
(A3) 1:1000
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L003
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : 233467 L000 Cover Sheets Issue : F
C 12.03.2025 FOR APPROVAL JO
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
c:\12dS\data\12DSERVER\233467_2957\DWG Covey\Landscape\Uncontrolled\233467 L000 Cover Sheets.dwg
Page 5
103
REFER ADJACENT
Legend
104
EXISTING PROPERTY BOUNDARY
1 0 3
4 MEL thy NEW PROPERTY BOUNDARY
2 MET LE 3 BAC myr
3
10
20 DIA cae
106
102
102
BIOBASIN - REFER
TREES FOR REMOVAL
TO DETAIL PLANS - REFER VEGETATION ASSESSMENT SCHEDULE
3 FIC nod SHEET L500
05
103
TREES
REFER TO PLANT SCHEDULE
102
102
102
2 MET LE 1 FEATURE PLANTS, SHRUBS AND GRASSES
REFER TO PLANT SCHEDULE
2 LEP MB
104
102
GROUNDCOVERS OR MASS PLANTINGS
03
2 LOM hys REFER TO PLANT SCHEDULE
104
105
3 SYN gla
TURF
103
101
TU REFER SPEC/NOTES
1013
1 LEP MB
REFER TO DETAIL
3 MET LE PA GENERAL PLANTING AREA
6 DIA cae REFER SPEC/NOTES
120 DIA cae REFER TO DETAIL
3 CAL RR PA MEDIAN PLANTING AREA
REFER SPEC/NOTES
REFER TO DETAIL
3 LOM hys
5
AMENITY REVEG AREA
10
2 MEL MQ ARV
101
REFER SPEC/NOTES
REFER DETAIL
TE TIMBER EDGE
102
TIMBER
TU 15 DIA cae REFER TO SPEC / DETAIL
PAVEMENT TYPE 1
102
TU
P1
105
REFER SPEC/NOTES
103
9 LOM mul
104
REFER TO DETAIL
Pedestrain cross over by civil. BIO BASIN PLANTING AREA
5 FIC nod BBPA
Remediation turf allowance to REFER SPEC/NOTES
surrounds. Ensure level with 1 BAN rob REFER TO DETAIL
107
TU
surrounds and top-dress as CM SURFACE TREATMENT
Refer to IPWEA Standard
103
102
required to ensure no trip COIR AND MULCH -GS-010
REFER SPEC
104
Drawing for Root Barrier
106
hazards. TOTAL = 186 SQU. METRES
103
104
2 MEL MQ
3 WAT flo MAINTENANCE ACCESS GATE
REFER TO BIO BASIN PLAN &
103
3 CALWA NOOSA COUNCIL STANDARD DETAIL
B1 BOLLARDS - TYPE 1
REFER TO DETAIL
102
3 CAL RR
10
2 B2 BOLLARDS - TYPE 2
104
REFER TO DETAIL
ROOT BARRIER
1
10
4 LOM mul
102
REFER SPEC/NOTES
103
REFER TO DETAIL
9 DIA cae EASTERN BUFFER TO LOT 100
REFER SPEC/NOTES
REFER TO DETAIL
103
Existing exotic tree to be removed.
103
1 ALP cae
2
10
Median planting. Install gravel
Timber edge
drainage connection to back of
REFER TO SHEET - L200
refer to detail
kerb. Coordinate with civil
contractor to ensure suitable
REFER SHEET - 501
TU
excavation of median is achieved
prior to planting.
4 6 5
108
107
0
3
102
10
0
1 10
TE
103
2 TRI LU
1
103
18 MYO par
Refer to IPWEA Standard 3 ALP cae
Drawing GS-01022
for Root Barrier
106
4
10
Root barrier to all street tree Area of existing native vegetation to be
1 TRI LU
105
plantings adjacent to footpath
103
retained and protected where possible.
109
45 LOM hys 1 ALP cae
edges. 6 MYO par
108
103
5 COR pet
Timber edge
refer to detail
1 BAN rob
3
10
103
7 LOM mul
104
104
3
10
3
10
BIOBASIN - REFER
103
3 ACR imp
103
3 ACR imp
5 LOM hys 1 BAN rob
103
TO DETAIL PLANS - 1 CAL sal
5 MEL aze 0 2 4 6 8 10 (A1) 1:200 20
SHEET L500 (A3) 1:400
Metres
107
101
REFER ADJACENT
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L100
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO
LANDSCAPE PLANS Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : 233467 L100 Landscape Plans Issue : F
C 12.03.2025 FOR APPROVAL JO LAKE MACDONALD DRIVE WORKS
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
c:\12dS\data\12DSERVER\233467_2957\DWG Covey\Landscape\Uncontrolled\233467 L100 Landscape Plans.dwg
Page 6
Legend
EXISTING PROPERTY BOUNDARY
NEW PROPERTY BOUNDARY
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
REFER TO SHEET - L100 1x Existing Street Tree to be
retained and protected where TREES
possible. If retention is not REFER TO PLANT SCHEDULE
possible replace with new
1x Street Tree
TU FEATURE PLANTS, SHRUBS AND GRASSES
105
REFER TO PLANT SCHEDULE
TE
103
TE
GROUNDCOVERS OR MASS PLANTINGS
Timber edge REFER TO PLANT SCHEDULE
2 TRI LU refer to detail
103
18 MYO par 2 TRI LU TURF
TU REFER SPEC/NOTES
104
Pedestrain cross over by civil. 22 MYO par 106
REFER TO DETAIL
7 PA GENERAL PLANTING AREA
10
3m wide maintenance REFER SPEC/NOTES
103
1 TRI LU access - refer to Engineer's Make good existing REFER TO DETAIL
6 MYO par documentation adjacent turf MEDIAN PLANTING AREA
PA
105 4
REFER SPEC/NOTES
103 REFER TO DETAIL
10
TU AMENITY REVEG AREA
ARV
TU 3 GRE bai REFER SPEC/NOTES
REFER DETAIL
103
TIMBER EDGE
5
10
2 ACM PR TE
TIMBER
3
TU ARV. REFER TO SPEC / DETAIL
10
Revegetation Style Amenity Planting to Buffer. P1 PAVEMENT TYPE 1
TU Amenity reveg REFER SPEC/NOTES
106
planting. ARV 6 ACM PR 4 SYZ BB REFER TO DETAIL
103
103
3 ACR imp 3 ACR imp 106
TU BBPA BIO BASIN PLANTING AREA
1 MEL aze
REFER SPEC/NOTES
5 MEL aze REFER TO DETAIL
CM SURFACE TREATMENT
Timber edge COIR AND MULCH - REFER SPEC
refer to detail TOTAL = 186 SQU. METRES
106
107
104
1 TRI LU ARV
LAKE MACDONALD ARV ARV MAINTENANCE ACCESS GATE
MEL thy
DRIVE
INTERSECTION
103 TU
6 MYO par 2 WAT flo
ARV
B1
REFER TO BIO BASIN PLAN &
NOOSA COUNCIL STANDARD DETAIL
BOLLARDS - TYPE 1
REFER TO SHEET - L201
8 ALP cae REFER TO DETAIL
MET LE 3 BAC myr 4 MEL MQ
AND BIOBASIN - 2 SYZ BB 5 SYZ BB
B2 BOLLARDS - TYPE 2
20 DIA cae 1 STE sin
REFER TO DETAIL 1 MEL MQ 3 TRI LU
REFER TO DETAIL
PLANS - SHEETS 30 MYO par ROOT BARRIER
REFER SPEC/NOTES
L100 AND L500 TU REFER TO DETAIL
3 FIC nod ARV ARV
TU EASTERN BUFFER TO LOT 100
REFER SPEC/NOTES
5 REFER TO DETAIL
103
0
TU
2 MEL aze
TU
2 MET LE
ARV
1 Timber edge
refer to detail
Plant all stock half their mature width from
7
edge of pathway - minimum 500mm width of
2 LEP MB
6
mulch to be continuously placed along
10 8 pathway edge
0
10
03
1
2 LOM hys
104
3 SYN gla
1013
1 LEP MB
3 MET LE
6 DIA cae
REFER TO SHEET L100
0 2 4 6 8 10 (A1) 1:200 20
Metres
(A3) 1:400
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L200
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO
LANDSCAPE PLANS Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : 233467 L100 Landscape Plans Issue : F
C 12.03.2025 FOR APPROVAL JO DIANELLA COURT INTERSECTION
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
c:\12dS\data\12DSERVER\233467_2957\DWG Covey\Landscape\Uncontrolled\233467 L100 Landscape Plans.dwg
Page 7
111
5
113
11
4 ACM PR
112
ARV.
5
11
5 SYZ BB Revegetation Style Amenity Planting to Buffer. 116
STE sin
1 TRI lau
116
117
1 XAN chr 1 XAN chr 1 BUC cel 1 TRI lau 1 WAT flo 1 STE sin 1 WAT flo 1 BUC cel 1 TRI lau 1 BUC cel 115
1 TRI lau 1 BUC cel 1 TRI lau 1 117
BUC cel 1 TRI lau 1 WAT flo
110
112
113
115
109
REFER SHEET - L200
108 ARV
REFER ADJACENT
116
3 SYZ BB
2 LOM hys
Planting Module 1 refer below Planting Module 2 refer below
1 LOM hys
2 JAC sco 15 MYO par 2 AUS dul
4 LOM hys 1 SYZ BB
6 LEP pol 1 BUC cel 30 MYO par 15 MYO par
117
TU 1 CAL sal 10 MYO par 1 WAT flo 1 WAT flo 1 TRI lau 1 WAT flo 1 BUC cel
1 BUC cel 30 MYO par 1 ALP cae 1 BUC cel 30 MYO par 30 MYO par 30 MYO par
4 ALP cae 1 MEL MQ 1 MEL MQ 2 MEL MQ
2 MET LE 2 MET LE 2 MET LE 2 MET LE
TU
111
TU
PT1 PT1 PT1 PT1 PT1 PT1
114
TU
B1
B1
B1
B2
B1
B2
118
TU TU TU
109 110
B2
15 MYO par
8 3
B1
TU
0 6
B1
Pavement Type 1
1
REFER TO SHEET - L300
1 2 1
Concrete threshold between
1 1
carparking bay and footpath.
1 5 1
1 1
ARV.
117 116 115
116
STE sin 1
116
Revegetation Style Amenity Planting to Buffer.
112
112
117
111 110
116 115
114 113
1 WAT flo 1 BUC cel 1 TRI lau 1 BUC cel
117
1 TRI lau 1 BUC cel 1 TRI lau 1 BUC cel 1 WAT flo 1 STE sin 1 WAT flo 1 BUC cel
112
1 TRI lau 1 BUC cel 1 TRI lau 111 1 BUC cel
10
1
REFER ADJACENT
110
1
118 ARV 113 11
4
B1 B1 B1 B1 B1 B2 B2 B2 B1
1
Planting Module 1 refer below Planting Module 2 refer below
1
2
1
11
Removable timber bollard 1
1 BUC cel
2 MEL MQ
11 MYO par
TU
TU
at 1.5m spacings.
Refer to detail.
8 11 7 116 115 1
11 MYO par Standard timber bollards x 9 at 1.5m spacings.
1
118
Refer to detail.
1 0 2 4 6 8 103 (A1) 1:200 20
112
11 (A3) 1:400
Metres
TU
119 119
B1
B1
4
TU
11
B1
120
B1
5
B1
117 6
1
B1
16m 16m
1
B1
1
8 1
B1
3 LEP pol 3 ALP cae
TU
1
B1
114
2 GRE ban Tree Species. 1 2 JAC sco Tree Species.
120
B1
Refer to L201 2 GRE ban Refer to L201 2 GRE ban
B1
2 BAN rob
1 BUC cel 1 TRI lau WAT flo 2 GRE ban
1 BUC cel 1 TRI lau
B1
113
GENERAL BUFFER NOTES
The proposed 10m buffer width will generally be set out as per the
typical planting plan shown here.
113
160m2 Groundcover Amenity Reveg Area
115
Continued maintenance, pruning and additional planting is likely to be 1 BAN rob 10m Eastern Landscape Buffer 1 JAC sco
required throughout the life of the buffer to create and maintain the 5 ALP cae - Even mix of 1 groundcover/grasse per 1m2 5 LEP pol
1 ALP cae 1 LEP pol
desired optical porosity to maximise visual filtering. - Refer to plant schedule for species
NOTE: 2 PUL vil 2 LOM hys
Canopy circles are indicative of semi-mature growth only.
10m
10m
1 JAC sco 1 SYZ BB 1 GRE ban 1 SYZ BB
Shrub plantings are to be planted at varying centres ranging between
(1.5-2m) and (2-2.5m) ensuring gaps in foliage for maintenance 3 LOM hys 4 BLE spp. 3 PUL vil 4 LOM hys
access and intermittent views to shrubs at back.
1 BAN spi ARV 1 BAN spi ARV
160m2 Amenity Reveg Area
Plant 1-1.5m height shrubs in staggered rows. Ensure species 10m Eastern Landscape Buffer
selections have mature heights that will not grow to touch the lower 2 CAL RR - Even mix of 1 groundcover/grasse per 1m2 2 SYZ BB
branches of the trees in zone 1 to keep a clear zone between foliage. 2 BLE spp. - Refer to plant schedule for species 2 AUS dul
Plant 2-3m ht species at 2m centres.
Create maximum diversity along the boundary by alternating species
plantings. Plant smallest shrubs in the row closest to the fence. Road kerb edge Road kerb edge
2 AUS dul 1 AUS dul 1 BAN spi
2 LOM hys 2 SYZ BB
Planting Module 1 0 1 2 3 4 5 (A1) 1:100 10
Metres
Planting Module 2
(A3) 1:200
Approved by: James Oliver (AILA)
Checked - JO F 03.07.2025 MCU RFI AMENDMENTS JO
Drawing title - Project - Site - Project No. 233467 Sheet No. L201
Design - JO Drawn - JO
E 17.04.2025 SPECIES CHANGE JO
LANDSCAPE PLANS Proposed 1 into 3 Development 62 Lake MacDonald Drive, Cooroy
D 24/03/2025 UPDATED PROJECT NAME AR Digital Ref : 233467 L100 Landscape Plans Issue : F
C 12.03.2025 FOR APPROVAL JO PROPOSED ROAD
Scales - AS SHOWN B 24.09.2024 FOR APPROVAL IL 124 DUPORTH AVENUE Ph (07) 5443 7777 Client - This Document is copyright and shall not be copied
PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - FOR APPROVAL
A 31.05.2024 PRELIMINARY - FOR COORDINATION ONLY JO
MAROOCHYDORE QLD 4558 Noosa Council for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
c:\12dS\data\12DSERVER\233467_2957\DWG Covey\Landscape\Uncontrolled\233467 L100 Landscape Plans.dwg
The text continues on page 8.
Used in these records
OPW Landscape Plans RFI Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.