Approved Plans - MCU16 112 & OPW16 0209 - 85 Rene St Noosaville

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                      8° 50' 50"
                                                   6.6                                                                       6.4                                       53.858
                                                           FUTURE WASTE                                                                                                                                                                                                                                   PALLET RACKING




                                                                                                                                                                                                                                                                                                                                                                                                                            3,000
                                                                                                                                                                                                                                                                                                                                                6.2                      BINS
                                                           WATER                                                                                                                                                                                                                                                                                                                                   61.90 m2
                                                                                                                                                                gravel surface
                                                           TREATMENT                                                                                                                                                                                                                                                                                                                                                                      6.0




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                           concrete




                                                                                                                                  9,800




                                                                                                                                                                                                                                                                                                                                                                                                      26
                                                           WASTE                                                                                                                                                                                                                                                                                          concrete
                                                                                                                                                           FUTURE FERMENTATION TANKS
                                                           WATER




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                           TREATMENT




                                                                                                                                                                                                                                                                                                                                                                                                      25
                                                                                                                                                                                                                                                                                                                                   bicycles
                                                                                                                                                                                                                                                                                                                                  (16) class




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                                                                                                                                                                                                                                                                  3 spaces




                                                                                                                                                                                                                                                                                                                                                                                                      24




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                                                                                                                                                                                                                                        PALLET RACKING




                                                                                                                                                                                                                                                                                                                                                                                                      23
                                                                                                                                                                                                                                                                                                                                                          4.8h x 6.0w
                                                                                                                                                                                                                                                                                                                                                          roller door




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                          horizontal structural beam                                                          COLD ROOM




                                                                                                                                                                                                                                                               horizontal structural beam




                                                                                                                                                                                                                                                                                                                                                                                                      22




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                             col                                                                                                                                                                                                                                                                                                                col




                                                                                                                                                                                                                                                                                                                                                                                                      21
                                                                                                                                                                                                                                                                                                 structural rafter                                                                                                                                            5.8
                                                                                                                                                                                                                                                                                                                                                                                     AV




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                                                                                                                                                                                                                                                                                                                     load/




                                                                                                                                                                                  8000 underside of roof beams at ridge
                                                                                                                                                                                                                                      PLATFORM LEVEL                                        RL. 5.500




                                                                                                                                                                                                                                                                                                                                                                                                      20
                                                                                                                                                                                                                                      SLAB LEVEL                                            RL. 5.800                                                                                unload




                                                                                                                                                                                                                                                                                                                                                          4.8h x 6.0w
                                                                                                                                                                                                                                                                                                                                                          roller door




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
1,000                                                                                                                                                                                                                          39,000                                                                                                                                                6,958                      5,400                 1,500
                                                    150               70   70




                                                                                                                                                                                                                                                                                                                                                                                                      19
    1,000                      4,000                       3,230                3,170                                  70




                                                                                                                                                                                                                                                               horizontal structural beam
              150            2,860                 70                 1,240




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                                                                  22,150




                                                                                                                                                                                                                                                                                                                                                                                                      18
                             col                                                                                                                                                                                                                                                                                                                col
                                                                      (10) STAFF LOCKERS                                                                                                                                                                                                         structural rafter
                                                                      (minimum)




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                      Male Amenities.                                                                                                                                                                                                        KEGGING




                                                                                                                                                                                                                                                                                                                                                                                                      17
                                                                                                                                                                                                                                                                                                                                                          4.8h x 6.0w
                                                                                                                                                      BOTTLING




                                                                                                                                                                                                                                                                                                                                                          roller door
                                                                      Wc + 2 Urinals + Basin.




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                      Unisex Accessible
70




                                                                      Amenity
                                                                                                                                                                                                                                                                                                                                                                                                                    5.600




                                                                                                                                                                                                                                                                                                                                                                                                      16
                                                                                                                                                                                                                                                                                                                                                                               concrete
                            LUNCH
                                                                                                                                 1,000




                                                                      Female Amenities.
4,000




                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                      Wc + basin.                                                                                       BBT
                                                                                                                                                                BBT




                                                                                                                                                                                                                                                                                                                                                                                                      15
                                                                                                                       col                                                                                                                                    col
                                                                                                                                 70




                                                                                                                                                                                                                                      BBT           BBT
                                                                                                                                               structural rafter
150




                                                                                                                                                                                                                                                                                                                                                                                                                                            98° 50' 50"
                                                                                                                                                                                                                                                                                                                                                                                                                            2,400
                                                                                                                                           Female Amenities.




                                                                                                                                                                                                                                                                                                                                                                                                                                              74.163
                           5,000 Litre                                                                                                                                                                                                                                                            CIP                      CHILLERS
                                                                                                                        3,945




                                                                                                                                           Wc + Shr (change)




                                                                                                                                                                                                                                                                                                                                                                                                      14
                           Water Tank                                                                                                      + Basin.




                                                                                                                                                                                                                                                                                                                                            4.8h x 6.0w
                                                                                                                                                                                                                                                                                                                                            roller door
                                                                                                                                           Male Amenities.                                                                                                                                    bunded
                                                                                                                                                                                                                                                                                              enclosure
                                                                                                                        70




                            FUTURE                                                                                                         Wc + Shr (change)
                            GRAIN                        Kitchen                Cold                                                       + Basin + Urinal.
                                                                                                                        3,715




                            SILOS                                               Room                                                                                                                                                                                                                                                                                                                         BIO-RETENTION
1,000                          4,000                Oven
                                                                                                                       col                                                                                                                                    col                                  LAB                                                                                                                                    5.4
                            FUTURE
        278° 50' 50"




                                                                                                                                               structural rafter
                            GRAIN
                                                                                                                        70
          74.437




                                                                                                                                                                                             10000 to top of ridge




                            SILOS                          Bar




                                                                                                                                                                                                                                                                                                                                                                                                                                      150
                                                                                                                                                                                                                                                                                                                                            4.8h x 6.0w
                                                                                                                                                                                                                                                                                                                                            roller door
                                                                                                                                  19,850




                                                                                                                                                                                                                                                                                             CONSTANT
                           89.91 m2                                                                                                                                                                                                                                                            TEMP
                                                                                                                        10,830




                                                                                                                                                                                                                                                                                                                         BOILERS
                                                                                                                                                                                                                                                                                                   HOP
                             5,000                                    7,850                                                                                                                                                                                                                                                                     2,000                                8,458                      5,400
                                                                                                                                                                                                                                                                                                 FREEZER




                                                                                                                                                                                                                                                                                                                                                                                                                                                 solid wall 2000 high
1,000                       2,700                1,300




                                                                                                                                                                                                                                                                                                                                                                                                                                      9,300
                                                            line of mezz over                                          col                     structural rafter
                                   awning over




                                                                                                                                                                                                                                                              col
                                                                   TASTING
                                                                                                                                                                                                                                                                                                                                                                                                                        GAS
                                                                  100m2 MAX                                                                                                                                                                                                                        MILL
                                                                                                                                                                                                                                                                                                                                            4.8h x 3.0w
                                                                                                                                                                                                                                                                                                                                            roller door




                                                                                                                                                                                                                                                                                                                     GENERATOR                                                                                          TANK
                                                               2 storey void                                                                                                                                                                                                                      ROOM
                                                                                                                                                                      1,000




                                                                                                                                                                                                                                                                                                                     main




                                                                                                                                                                                                                                                                                                                                                                                                                                      150
                                                                                                                                                                                                                                                                                                                     switchboard
                       gate/fence
                                                                                  2,961




                                                                                                                                                                                                                                                                                                                                                                        sliding gate
                                                                                                                                                                                line of fascia over                                                                                               46.18 m2
                                                                                                                                                                                                                                                                                                                                       GRAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                      2,500
                                                                                                                                                                      983
                                                                                                                                               accessible bay




                                                                  awning over                                                                                                                                                                                                                                                          OUT
                                                                                                                                                                                                                                                                                                                     PAD
                                                                                  4,257




                                                                                                                                                                                                                                                                                                                                                                                                              13




                                                                                                                       shared                                                                                                                   BIO-RETENTION                                                        MOUNT
                                                                                                                                                                                                                                                                                                                                                   1,673                           8,785                                5,400
                                                                                                                                                                      5,400




                                                                                                                                                                                                                                                                                                                                                                                                                                      2,500


                                                                    ENTRY                                              space
                                                                                                                                                                                                                                                                                                                         2,500
                                                                                                                                                                                                                                                                                                                                                                                                              12
                                                                                                                                                                                                                              5,400




                       1              2
                                                                                                                                                                                                                                                                                                                                 1




                                                                                                                                           3                                                                                                                                                                                                                       concrete
                                                                                                                                                                                                                                                                                                                                                                                                                                      2,500




                                         7° 42' 50"
                                                                                                                                                                                                                                                                                                                                 2




                                          12.456
                                                                                                                                                                                                                                                                                                                                                                                                              11




                                                                            bicycles                                                       28°                          4
     300               2,400          2,400                                                                                                    05'                                                                                                                                                                                            2 x motorcycles
                                                                           (4) class 3                                                      10.3 20"                                                                      5                                                                                          6.80 m2
                                                                                                                                                50
                                                                                                                                                                                                                                                                                                                                                                                                                                      2,500




                                                                            spaces
                                                                                                                                                                                                                                            6
                                                                                                                                                                                                                                                          7
                                                                                                                                                                                                                                                                                                                                                                                                              10




                                                                                                                                                                                                                                        18° 51                                               8             9
                                                                                                                                                                                                                                              ' 45"
                                                                                                                                                                                                                                          6.009                                                                                                    9° 34' 35"                                                          5.104
                                                                                                                       2,400                   2,600                    2,600                                             2,600             2,600         2,600                               2,600        2,500                                    20.431                                                            4° 01'20"
                                                                                                                                                                                                                                                                                                                                                                                                                                                     5.2
                                                                           EMT K
                                                                           existing concrete
                                                                                                                                                                                                                                                                                                                         7800




                                                                                                                                                                                                                                                                                                 EAST
                                                                                                                                                                                                                                                                                                  04
                                                                                                                                                                              AV design vehicle in
                                                                                                                                                                              accord with
                                                                                                                                                                              AS.2890.2
                  EMT J




                                                                                                                                                                                                                                                                                                                        4.8
                                                                                                                                                                                                                              126.75 m2                                                                                                                                                                                  5.0
                                                                                                                                                                                                                                                                                                                                                                                       EMT L                existing concrete
                                   existing concrete
                                                                                                                                                                                                                                                              188° 28' 40"                                                                                                                                  crossover
                                   crossover
                                                                                                                                                                                                                                                                53.456                                                                                                                                               198° 56' 45"
                                                                                                                                                                                                                                                                                                                                                                                                                        0.410
               SITE/F L O O R P L A N
                                                                                                                                                                                                                                                                                                                                                                           CLIENT:
                                                                                                                                                                                                                                                                                                                                                                           RAFTSEA P/L
               1 :2 0 0
                                                                                                                                                                                                                                        R E N E                                             S T R E E T                                                                    PROJECT and LOCATION:
                                                                                                                                                                                                                                                                                                                                                                           Proposed Industrial Development at
                                                                                                        APPROVED PLANS                                                                                                                                                                                                                                                     No.42 Rene Street, Noosaville.

                                                                                                     MCU16/0112 & OPW16/0209                                                                                                                                                                                                                                               DRAWING TITLE:    Ground/Site Floor Plan
                                                                                                                                                                                                                                                                                                                                                                                                                               Drawing:


                                                                                                         NOOSA COUNCIL                                                                                                                                                                                                                                                                                                         02 of 04
K         Issue for Council RFI                            25.10.16                                                                                                                                                                                                                                                                                                                   1:200 at A3 PAPER
                                                                                                        19 JANUARY 2017
                                                                                                                                                                                                                                                                                                                                                                           SCALE                                              PROJECT No:                 ISSUE

Issue Amendment                                            Date                                                                                                                                                                                                                                                       (07) 5456 4411    0412 264 685 QBCC Lic.065570
                                                                                                                                                                                                                                                                                                                                                                           DRAWN BY: JS            CHECKED BY: CS              15.253                        K
Log in to download the original file

Approved Plans - MCU16 112 & OPW16 0209 - 85 Rene St Noosaville.pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

                                                                                                                                                                                                                                                     structural rafter




                                                                                                                                                          8000 underside of roof beams at ridge
                                                                                        horizontal structural beam




                                                                                                                                                                                                          horizontal structural beam




                                                                                                                                                                                                                                                                                                                                                                 line of roof over
                                    col                                                                                                                                                                                                                                                                        col
                                                                                                                                                                                                                                                     structural rafter




                                    4,000            150             7,780                                           70
                                                                             1,200
                                                     150     4,700     70            1,810 70
                                                                                                                                                                                                                                                                      1,000           100 3,775                150             2,000




                                                                                                                           70
                                                                                                                     col              structural rafter                                                  col
                                                                       16
                                                                       15
                                                                       14
                                                                       13
                                                                       12
                                                                       11
                                                                       10
                                                                       9
                                                                       8
                                                                       7
                                                                       6
                                                                       5
                                                                       4
                                                                       3
                                                                       2
                                                                       1
                                              70




                                                                                                                                                                                                                                                                                                                100
                                                            OPEN              OFFICE                                       70 3,000




                                                                                                                                                                     10000 to top of ridge
                                                                                                                                                                                                                                                                                 1
                                              5,820




                                                            OFFICE
                                                                                                                                                                                                                                                                                 2

                                                                                                                                                                                                                                                                                                                                        MEZZANINE
                                                                                                                                                                                                                                                                                 3

                                                                                                                                                                                                                                                               void
                                                                                                                                                                                                                                                                                 4
                                                                                                                                                                                                                                                                                 5
                                                                                                                                                                                                                                                                                 6

                                                                                                                                                                                                                                                                                                                                        OVER
                                                                                                                                                                                                                                                                                 7
                                                                                                                                                                                                                                                                                 8
                                                                                                                           2,750




                                                                                                                                                                                                                                                                                                                8,000
                                                                              OFFICE
                                                                                                                                                                                                                                                                                 9
                                                                                                                                                                                                                                                                                 10

                                                           118.23 m2
                                                                                                                                                                                                                                                                                 11
                                                                                                                                                                                                                                                                                 12
                                                                                                                                                                                                                                                                                 13
                                              70




                                                                                                                                                                                                                                                                                 14
                                                                                                                                                                                                                                                                                 15
                                                                                                                                                                                                                                                                                 16
                                                                                                                           3,000 70
                                    14,775




                                                           OFFICE             OFFICE
                                              2,800




                                                                                                                     col                                                                                 col                                                      71.77m²
                                                                                                                                      structural rafter




                                                                                                                                                                                                                                                                                                                100
                                             70




                                                                                                                                                                                                                                           line of roof over
                                                                                                                           70
                                              2,805




                                                           OFFICE
                                                                                                                                                                                                                                                                                      void
                                                                                                                           5,675
                                              3,000 70




                                                                                                                                                                                                  void
                                                           OFFICE            MEETING




                                                                                                                                                                                                                                                                                                                          line of roof over
                                                                                                                     col              structural rafter                                                  col
                                                     150     4,700     70      3,010 70
                                              70




                                                                                                                           70




                                                                     void                                                                                                                                                                                      void                   void




                                                             roof over entry
                                                                                                                                                line of roof over




                                 MEZZANINE FLOOR PLAN
                                 1 :2 0 0


                                                                                                                                                                                                                                                                                      APPROVED PLANS
                                                                                                                                                                                                                                                                                   MCU16/0112 & OPW16/0209
                                                                                                                                                                                                                                                                                       NOOSA COUNCIL
                                 SCHEDULE OF AREAS
                                                                                                                                                                                                                                                                                      19 JANUARY 2017
                                 Site Area:                            4000.00m2
                                 Site Cover:                               37.5%
                                 Building Area:
                                 Ground Floor                          1510.00m2
                                 Mezzanine Admin                        118.23m2
                                 Mezzanine factory                       71.77m2
                                 Total Building                        1700.00m2

                                 Carparking:
                                 Req'd                                 26 cars
                                 Prov'd                                26 cars

                                 Motorcycle Spaces:
                                 Req'd                                 2 spaces
                                 Prov'd                                2 spaces

                                 Landscaping:
                                 Req'd (10% min)                       400.00m2
                                 Prov'd (10.5% min)                    419.88m2




                                                                                                                                                                                                                                                                                                     CLIENT:
                                                                                                                                                                                                                                                                                                     RAFTSEA P/L
                                                                                                                                                                                                                                                                                                     PROJECT and LOCATION:
                                                                                                                                                                                                                                                                                                     Proposed Industrial Development at
                                                                                                                                                                                                                                                                                                     No.42 Rene Street, Noosaville.

                                                                                                                                                                                                                                                                                                                                                               Drawing:
                                                                                                                                                                                                                                                                                                     DRAWING TITLE:     Mezzanine Floor Plan
                                                                                                                                                                                                                                                                                                                                                               03 of 04
K    Issue for Council RFI   25.10.16                                                                                                                                                                                                                                                                SCALE     1:1, 1:200 at A3 PAPER                          PROJECT No:           ISSUE

Issue Amendment              Date                                                                                                                                                                                                      (07) 5456 4411                 0412 264 685 QBCC Lic.065570
                                                                                                                                                                                                                                                                                                     DRAWN BY: JS                             CHECKED BY: CS   15.253                K

Page 3

                                                                                                                                                       METAL ROOF SHEETING
                                                                                                                                                       5° PITCH
                                                                                                                                                                                                                                                   TOP OF ROOF


                                                                                                                                                                                                                                                   U/S STRUCTURAL RAFTER




                                                                                                                                                                                                                                         10,000
                                                                                                                                                                                                                                8,000
                                                                                                                                                                                                                                                   FINISHED SLAB
                                                                                                                                                                                                                                                   RL.5.800

                                                NATURAL GROUND LINE                                                                                    CONC. TILT PANEL
                                  NORTH ELEVATION
                                  1 :2 0 0




                                                                                              METAL ROOF SHEETING
                                                                                              5° PITCH                                                                                                 600
                                                                                                                                                                                                                                                           TOP OF ROOF


                                                                                                                                                                                                                                                  U/S STRUCTURAL RAFTER




                                                                                                                                                                                                                                                           FINISHED CEILING




                                                                                                                                                                                                                                        10,000
                                                                                                                                                                                                                                                   2,700
                                                                                                                                                                                                                          8,000
                                                                                                                                                                                                                                                           FINISHED SLAB
                                                                                                                                                                                                                                                           FINISHED CEILING




                                                                                                                                                                                                                                                   2,700
                                                                                                                                                                                                                                                           FINISHED SLAB
                                                                                                                                                                                                                                                           RL.5.800

                                                                                              CONC. TILT PANEL                                            NATURAL GROUND LINE
                SOUTH ELEVATION
                1 :2 0 0




                                                                                                                       METAL ROOF SHEETING
                                                                                                                       5° PITCH

                                                                    600                                                  600
                                                                                                                                                                                                                                                    TOP OF ROOF
                                         600
                                                                                                                                                                                             6,000
                                                                                                                                                                                                                                                    U/S STRUCTURAL RAFTER
  8300 APPROX




                                                                                                                                                                                                                                          10,000




                                                                                                                                                                                                                                                                          BOUNDARY
       2,700
                BOUNDARY




                                                                                                                                                                                                                                 8,000
300




                                                                                                                                                                                                                                                    FINISHED SLAB
                                                                                                                                                                                                                                                    RL.5.800
      2,700




                                                                           CONC. TILT PANEL                                                  CONC. TILT PANEL                                                        NATURAL GROUND LINE
                                                                           OFF FORM FINISH                                                   ACRYLIC PAINT FINISH
                EAST ELEVATION                                             PROTUDING SHADOW BOX
                1 :2 0 0                                                   TO GLAZING


                                                                                                            METAL ROOF SHEETING
                                                                                                            5° PITCH
                                                                                                                                                                                                                                                    TOP OF ROOF


                                                                                                                                                                                                                                                    U/S STRUCTURAL RAFTER
                                                                                                                                                                                                                                          10,000
                                                                                                                                                                                                                     BOUNDARY
                                                      7000 APPROX
                           6000 APPROX




                                                                                                                                                                                                                                8,000




                                                                                                                                                                                                                                                    FINISHED SLAB
                                                                                                                                             NATURAL GROUND LINE                                                                                    RL.5.800

                                                                                                    CONC. TILT PANEL
                WEST ELEVATION
                1 :2 0 0                                                     APPROVED PLANS                                                                                                  CLIENT:
                                                                                                                                                                                             RAFTSEA P/L
                                                                          MCU16/0112 & OPW16/0209                                                                                            PROJECT and LOCATION:
                                                                                                                                                                                             Proposed Industrial Development at
                                                                              NOOSA COUNCIL                                                                                                  No.42 Rene Street, Noosaville.

                                                                             19 JANUARY 2017                                                                                                 DRAWING TITLE:   Elevations
                                                                                                                                                                                                                                                            Drawing:

                                                                                                                                                                                                                                                            04 of 04
K          Issue for Council RFI               25.10.16                                                                                                                                      SCALE     1:200 at A3 PAPER                                    PROJECT No:       ISSUE

Issue Amendment                                Date                                                                                          (07) 5456 4411   0412 264 685 QBCC Lic.065570
                                                                                                                                                                                             DRAWN BY: JS            CHECKED BY: CS                         15.253              K

Page 4

                          6.0




      5.8




             5.6




                   FILL
                   CUT



                     5.4




                          5.2




4.8                        5.0




                                                        Issue:




                                                                                 Unit 1/11 Project Ave,
                                                                                 Noosa Heads
                                                                                 Ph (07) 5455 5604




                                                        DEBUILD T/A
                                                                                 email:[email protected]
                                                                                 web:www.scg-engineers.com
                                                                                 ABN 40 098 481 899




                                                            Title:

               APPROVED PLANS
            MCU16/0112 & OPW16/0209                        Project


                NOOSA COUNCIL
               19 JANUARY 2017                             Date:       Drawn

                                                            Checked:   Drg No.                        Rev.




                                      Rev. - 10.06.16

Page 5

                                                                  6.0




                                                     5.8




                          INDUSTRIAL DEVELOPMENT
                                                           5.6




   APPROVED PLANS
MCU16/0112 & OPW16/0209                                          5.4


    NOOSA COUNCIL
   19 JANUARY 2017




                                                                  5.2




                                               4.8                 5.0




                                                                                           Issue:




                                                                                                                    Unit 1/11 Project Ave,
                                                                                                                    Noosa Heads
                                                                                                                    Ph (07) 5455 5604




                                                                                           DEBUILD T/A
                                                                                                                    email:[email protected]
                                                                                                                    web:www.scg-engineers.com
                                                                                                                    ABN 40 098 481 899




                                                                                               Title:




                                                                                              Project




                                                                                              Date:       Drawn

                                                                                               Checked:   Drg No.                        Rev.




                                                                         Rev. - 10.06.16

Page 6

          LANDSCAPE SPECIFICATIONS                                                           · CLEAR & REMOVE ALL NON-ORGANIC, DELETERIOUS & LARGE ORGANIC MATTER SUCH AS


          1.0 GENERAL NOTES
                                                                                               ROCKS GREATER THAN 40mm DIAMETER, TREE ROOTS, TRUNKS, LIMBS, & STUMPS FROM
                                                                                               ALL AREAS TO BE LANDSCAPED.
                                                                                             · LANDSCAPE CONTRACTOR TO RE-SPREAD AMELIORATED STOCKPILED TOPSOIL TO PLAN
                                                                                                                                                                                             PROPOSED INDUSTRIAL DEVELOPMENT
                                                                                               PRESCRIBED PROPOSED CONTOURS & TRACK-IN.
          ABBREVIATIONS
          · NC - NOOSA COUNCIL             · A.S. - AUSTRALIAN STANDARDS
                                                                                             · ENSURE SMOOTH, FLOWING, EVEN GRADES AND POSITIVE DRAINAGE WITH NO PONDING TO                                                                                                           LOT 4 SP244573, 85 RENE ST, NOOSAVILLE, QLD
                                                                                               FALL PERCENTAGES SHOWN ON PLAN, 3% (MINIMUM 2%). FINISHED GRADES SHALL BLEND
          · EP - ESTABLISHMENT PERIOD      · H.D. - HOT DIPPED · LA - LANDSCAPE ARCHITECT
          · N/A - NOT APPLICABLE           · O.C. - ON CENTRE · MP - MAINTENANCE PERIOD
          · MRTS - MAIN ROADS TECHNICAL STANDARD
                                                                                               INTO EXISTING GRADES PROVIDING A NATURAL APPEARANCE WITH NO ABRUPT EDGES.
                                                                                             · ENSURE 2% MINIMUM SLOPE AWAY FROM ALL STRUCTURES TO PITS OR SWALES.                                                                                             LANDSCAPE OPERATIONAL WORKS PLANS
                                                                                             · TRIM TOPSOILS FOR GARDENS & TURF AREAS.
          · NATA - NATIONAL ASSOCIATION OF TESTING AUTHORITIES
          · SUPER - SUPERINTENDENT         · TYP. - TYPICAL                                  2.0 LANDSCAPE CONSTRUCTION                                                                                                                                                                                                                           SEPTEMBER 2016
                                                                                                                                                                               · SPREAD AMELIORATED SITE TOPSOIL OR MRTS 16 IMPORTED ORGANIC TOPSOIL TO A                   3.0 MAINTENANCE
          THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE                                                                                                 DEPTH OF 300mm OVER PREPARED GARDEN AREAS & TRIM.
                                                                                             IRRIGATION - IF INSTALLED                                                                                                                                                      · WATERING DURING CONSTRUCTION PERIOD IS THE RESPONSIBILITY OF THE
          FOLLOWING SCHEDULE OF DRAWINGS;                                                                                                                                      · CROWN GARDEN BEDS AT CENTRE, 100mm.
                                                                                             · LIAISE WITH RELEVANT NC AUTHORITIES & OBTAIN ANY APPROVAL AS REQUIRED.                                                                                                         LANDSCAPE CONTRACTOR.
                LD1   SPECIFICATIONS                                                                                                                                           · MULCH GARDENS WITH LA APPROVED 25mm+ HOOP PINE BARK MULCH 100mm DEEP
                                                                                             · COMPLY WITH GOVERNMENT STANDARDS & CO-ORDINATE WITH OTHER TRADES.                                                                                                            · FROM PRACTICAL COMPLETION A 12 WEEK ESTABLISHMENT / MAINTENANCE PERIOD
                LD2   DETAILS                                                                                                                                                    SETTLED.
                                                                                             · CHECK LOCATIONS OF PENETRATION/CONDUITS & INSTALL WHERE REQUIRED.                                                                                                              WILL COMMENCE & WATERING DURING THIS PERIOD & ANY SUBSEQUENT PERIODS WILL
                LD3   SCHEDULES & LEGEND                                                                                                                                       · ALL SUPPLIED TOPSOIL & MULCH TO COMPLY WITH CURRENT A.S. & FREE OF WEEDS, SEEDS
                                                                                             · CONTRACTOR TO PROVIDE QUALIFICATIONS & INSURANCES BEFORE CONSTRUCTION.                                                                                                         BE PAID UPON RECEIPT OF APPROPRIATE EVIDENCE.
                LP1-2 LANDSCAPE PLANS                                                                                                                                            (SPECIFICALLY NUTSEDGE), PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES &                  · ALL MAINTENANCE ACTIVITIES AS PER FOLLOWING SCHEDULE;
                                                                                             PROVIDE:                                                                            DISEASES. FURNISH LA WITH CERTIFICATIONS RESPECTIVELY FOR APPROVAL PRIOR TO                       - MAINTAIN WHOLE LANDSCAPE WORKS FOR A 12 WEEK EP FROM PRACTICAL
          ·       THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL                                                                                           INSTALLATIONS.
                                                                                             · SUPPLY & INSTALL A NEW:                                                                                                                                                               COMPLETION DATE (I.E. BEGINNING OF 52 'ON-MAINTENANCE').
                  WORKS LANDSCAPING DECISION NOTICE ONCE ISSUED. THIS PLAN HAS BEEN
                                                                                               ELECTRONIC AUTOMATICALLY CONTROLLED IRRIGATION SYSTEM WITH RAIN SENSOR                                                                                                              - MAINTAIN WHOLE LANDSCAPE WORKS FOR A 40 WEEK MAINTENANCE PERIOD
                  DEVELOPED TO COMPLY WITH THE CURRENT NOOSA COUNCIL PLANNING SCHEME.                                                                                          TREE PLANTING
                                                                                               INCLUDING ALL REQUIRED VALVES, LINES & APPROPRIATELY SIZED VALVE BOXES, 1 PER                                                                                                         FROM EP FINISH DATE (BALANCE OF 52 WEEK 'ON-MAINTENANCE PERIOD).
                                                                                               UNIT MINIMUM, AT GROUND LEVEL FLUSH WITH FINISH GRADES, WITHIN GARDENS.         · REFER TO DETAILS (AS APPLICABLE) FOR INFORMATION.
          PRELIMINARIES                                                                                                                                                        · ALL TREES TO BE CERTIFIED THAT THEY COMPLY WITH THIS SPECIFICATION & WITH
                                                                                             · TWELVE MONTH GUARANTEE, MAINTAIN AGAINST FAULTY WORKMANSHIP & MATERIALS FOR                                                                                                  MAINTENANCE REGIME - SCHEDULE
                                                                                               SYSTEM FROM DATE OF PRACTICAL COMPLETION.                                         AS 2303:2015 TREE STOCK FOR LANDSCAPE USE & 'NATSPEC GUIDE SPECIFYING TREES: A
              (OTHER THAN THOSE INDICATED ON THESE PLANS) & BOUNDARIES. ALL SERVICES &                                                                                           GUIDE TO ASSESSMENT OF TREE QUALITY (2003)'.                                               TASK                   FREQUENCY                             PERFORMANCE INDICATOR
                                                                                             · FOR PRACTICAL COMPLETION ENSURE WHOLE SYSTEM IS OPERATIONAL.
              RELATED INFRASTRUCTURE INCLUDING STREET LIGHTING SHOWN ON THESE PLANS ARE                                                                                          FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.
                                                                                             · PROVIDE CAD 'AS BUILT' DRAWING WHEN APPLYING FOR PRACTICAL COMPLETION CLEARLY                                                                                                                       Weekly: November - February           Maintain turf to present consistent &
              INDICATIVE ONLY.                                                                                                                                                 · ALL TREES TO HAVE A FULL & EVEN CROWN.                                                                            Fortnightly: March - April
                                                                                               SHOWING MAIN-LINE RUNS & SIZES, VALVE TYPES / STATION NUMBERS / DESIGNED                                                                                                                                                                  vigorous appearance, mow to 30mm
                                                                                               PRESSURE AT VALVE, HEAD TYPES & LOCATIONS.                                      · INSTALL TREES AT LOCATIONS INDICATED ON THE PLANS, PER NOTES & DETAILS HEREIN.             Mowing                 Monthly: May - August                 high.
          · BEFORE WORK COMMENCES THE SUBCONTRACTOR IS TO ORGANISE A PRE-START MEETING
                                                                                                                                                                               · MULCH TREE GARDENS WITH MINIMUM 1200mmØ COLLAR OF 25mm+ HOOP PINE MULCH                                           Weekly: November - February
            WITH THE LA TO ESTABLISH SCOPE OF WORKS MANAGEMENT PROCEDURES & CLARIFY ANY
                                                                                             SYSTEM REQUIREMENTS                                                                 100mm DEEP TO AS4454. DO NOT MULCH WITHIN 50mm OF TRUNK / PLANT STEM.                                             Fortnightly: March - April            Maintain turf neatly against any edge &
            ISSUES.
                                                                                             · CO-ORDINATE ON-SITE WITH OTHER TRADES, PROVISION OF ALL CONDUITS &              · EDGE & STAKE TREES PER DETAIL.                                                             Trimming               Monthly: May - August                 around any service or respective cover
          · INSTALL TREE PROTECTION MEASURES AS PER PLANS & DETAIL WHERE REQUIRED.
                                                                                               PENETRATIONS REQUIRED FOR ACCESS TO ALL AREAS TO BE IRRIGATED.                  · ALL TREES TO BE LOCATED MINIMUM;
          · PRIOR TO COMMENCING CONSTRUCTION WORKS, VERIFY DIMENSIONS, LEVELS & LOCATION                                                                                              - 1000mm FROM UNDERGROUND SERVICES. SERVICE LOCATIONS TO BE CONFIRMED                                        Every 2 weeks October - March.        No weeds or grass taller than
                                                                                             · CONTROL VALVES TO BE HOUSED IN LOCKABLE HEAVY DUTY, GREEN IN COLOUR, PLASTIC
            OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY.                                                                                                                                                                                                          Spraying / wick wiping Every 4 weeks April - September       plant within 500mm of plants.
                                                                                               VALVE BOXES WITH ACCESS FOR HAND MAINTENANCE. LOCATE VALVE BOXES IN GARDENS.             ON-SITE BY CONTRACTOR PRIOR TO PIT EXCAVATIONS
          · DIMENSIONS TAKE PRECEDENCE OVER SCALE.
                                                                                             · INSTALL BACKFLOW PREVENTION DEVICE(S) WHERE REQUIRED IN GARDEN WITHIN                  - 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES                                                                                                100mm minimum required depth &/or
          · CONTRACTOR TO REVIEW ALL SCHEDULES HEREIN TO CONFIRM THEIR CORRELATION TO                                                                                                 - 1500mm FROM PROPERTY CONNECTIONS
                                                                                               LOCKABLE PROTECTIVE MESH FRAME.                                                                                                                                                                                                           mulch adequate to suppress weed
            THESE PLANS. WHERE DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION                                                                                                     - 8m FROM OVERHEAD STREET LIGHTING                                                    Re-mulching
                                                                                             · INSTALL REDUCED PRESSURE ZONE VALVES (NC APPROVED) IN-LINE, DOWNSTREAM OF                                                                                                                            Once during MP & once per year       growth & maintain soil moisture.
            REFER TO LA PRIOR TO PROVISION OF TENDER PRICING &/OR CONSTRUCTION.                                                                                                       - 900mm FROM BACK OF KERB OR IN BETWEEN KERB & FOOTPATH WHERE APPLICABLE
                                                                                               TAKE-OFF FROM MAIN SERVICE LINE. COORDINATE LOCATIONS WITH SUPER ON-SITE.                                                                                                                           Inspect planting at the start of
                                                                                             · ALL MAINS & ANY PRESSURISED BRANCH TO THE MAINS TO BE CLASS 12 PVC PIPE.                 ALLOWING FOR SERVICE SETBACKS AS PER ABOVE) - OR AS DIMENSIONED ON PLANS                                   spring & assess damaged, dead
          SEDIMENT & EROSION CONTROL
                                                                                             · ALL SHRUBS & GROUNDCOVERS TO BE DRIP IRRIGATED (NO POP-UP SPRAYERS). CHECK             - 3m FROM DRIVEWAY CROSSOVERS, STORMWATER CATCH PITS, POWER POLES, &                                         or unhealthy plants. Replant as       To achieve minimum design planting
          · THE LANDSCAPE CONTRACTOR TO IMPLEMENT & MAINTAIN FOR THE CONTRACT DURATION,                                                                                                 FIRE HYDRANTS                                                                                                                                    densities and garden cover
                                                                                               SYETEM ONCE PER MONTH TO ENSURE ALL EMITTERS ARE FUNCTIONING APPROPRIATELY.                                                                                                  Re-planting            required.
            BEST PRACTICE EROSION & SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE
                                                                                             · IRRIGATION SYSTEM TO HAVE AN AUTOMATIC TIMER / CONTROLLER. LOCATE CONTROLLER           - 600mm FROM CONCRETE PATHS
            MANUAL FOR EROSION & SEDIMENT CONTROL (MAROON MANUAL), GOOD ENVIRONMENTAL                                                                                                                                                                                                              Every 2 or 3 days during EP,       Plants exhibit healthy growth & no signs
                                                                                               IN SUITABLE LOCKABLE BOX. INSTALL LAMINATED COPY OF SYSTEM LAYOUT WITHIN BOX.          - 15m FROM PEDESTRIAN ROAD CROSSING - APPROACH SIDE
            PRACTICE & THE CONSULTING CIVIL ENGINEERS SPECIFICATION FOR EROSION & SEDIMENT                                                                                                                                                                                                         weekly during MP, or as required of drought stress
                                                                                             · IRRIGATION SYSTEM TO HAVE A RAIN SENSOR CONNECTED TO CONTROLLER TO ENSURE              - 5m FROM PEDESTRIAN ROAD CROSSING - DEPARTURE SIDE
            CONTROL. PENALTIES & FINES FOR NON-COMPLIANCE WILL APPLY.                                                                                                                                                                                                       Watering               to maintain adequate soil moisture
                                                                                               SYSTEM DOES NOT OPERATE DURING RAIN PERIODS.                                           - 8m FROM EXTENSION OF PROPERTY BOUNDARIES ON SIDE STREETS
          · INSTALL SILT CONTROL FENCING IN ACCORDANCE WITH SITE ENVIRONMENTAL                                                                                                        - 3.05m FROM ADJOINING, NEW, OR PERPENDICULAR LOT BOUNDARIES                                                 Once during MP or as required
                                                                                             · IRRIGATE PLANTS TO ENSURE ADEQUATE MOISTURE IS MAINTAINED DURING
            MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.                                                                                                                                                                                                                                         where & when plants are not
                                                                                               ESTABLISHMENT.
          · SEDIMENT & EROSION CONTROL DEVICES TO BE INSTALLED WHERE NECESSARY & AS                                                                                            GENERAL PLANTING                                                                                                    responding to slow release            Plants appear healthy exhibit good rate
                                                                                             · ADJUST SYSTEM POST ESTABLISHMENT SO IT OPERATES DURING DRY & HOT PERIODS SO
            DIRECTED ON SITE BY SUPER.                                                                                                                                         · REFER TO DETAIL(S) HEREIN RESPECTIVELY.
                                                                                                                                                                                                                                                                            Fertilising            fertiliser applied at planting        of growth.
                                                                                               PLANTS & TURF AREAS ARE ADEQUATELY WATERED TO MAINTAIN HEALTHY & VIBRANT
          · ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE                                                                                           · SUPPLY & PLACE PLANTS ACCORDING TO PLANT SCHEDULE, PLANT SETOUT NOTES & PLAN
                                                                                               CONDITIONS.                                                                                                                                                                                         As required where plants require
            WITH MANUFACTURER'S SPECIFICATIONS.                                                                                                                                  LOCATIONS.                                                                                                        support. Allow to stake 20% of
          · THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION CONTROL                                                                                              · WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.                                                         trees during EP. Allow to stake
                                                                                             LEVELS
            DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS;                                                                                                                     · ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES, STAGGERED, NOT IN ROWS                Staking                further 20% of trees during MP.       Plants growing in an upright manner.
                                                                                             · SEE PLAN FOR ARCHITECT'S & ENGINEER'S PROPOSED LEVELS.
                 a.) DURING CONSTRUCTION:         - DAILY DURING DRY WEATHER                                                                                                     UNLESS INDICATED ON PLANS.
                                                                                             · VERIFY ALL LEVELS, CONDITIONS, & UTILITY LOCATIONS IN-THE-FIELD INCLUDING ALL                                                                                                Inspection for storm   Following storm event, heavy
                                                   - PRIOR TO PREDICTED STORM EVENTS                                                                                           · MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
                                                                                               INVERTS. IF A DISCREPANCY OCCURS NOTIFY SUPER &/OR LA.                                                                                                                                              rainfall or high winds                Any damage noted and rectified
                                                   - TWICE DAILY DURING PROLONGED RAIN                                                                                                                                                                                      damage
                                                                                             · LEVELS TO BE CONFIRMED BY A QUALIFIED/LICENSED SURVEYOR.                          OPTIMUM COVER RELATED TO MATURE PLANT SIZE AND FORM.
                 b.) DURING ESTABLISHMENT PERIOD: - WEEKLY DURING DRY WEATHER                                                                                                  · SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 500mm FROM ROADS,
                                                                                             · GRADE EVENLY BETWEEN PRESCRIBED LEVELS & FINISHED SURFACE LEVELS ENSURING                                                                                                    Pruning - to promote   Monthly during EP, every 3 months Plants have desired natural form &
                                                   - PRIOR TO PREDICTED STORM EVENTS                                                                                             KERBS, GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFIRM WITH LA
                                                                                               POSITIVE DRAINAGE & NO PONDING AREAS.                                                                                                                                        healthy plant growth   MP & beyond                       display healthy growth
                                                   - TWICE WEEKLY DURING PROLONGED RAIN                                                                                          WHICH REQUIRE MORE DISTANCE.
                                                                                             · CO-ORDINATE ESTABLISHMENT OF LANDSCAPE LEVELS WITH SUPER.
          · ALL STOCKPILES ARE TO BE PROTECTED WITH SUITABLE EROSION CONTROL DEVICES &                                                                                                                                                                                                             EP - Provide a report to LA on        Scheduled activities carried out.
                                                                                                                                                                               · ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 10g FERTILISER (N.P.K. 20-4.3-4.1)
            GRADED TO ENSURE CONTROL OF RUNOFF.                                                                                                                                                                                                                                                    establishment progress at each        Successful establishment. Scheduled
                                                                                             DRAINAGE                                                                            TABLET AT A RATE OF 1/140mm, 2/200mm, 3/300, 4/45 litre & ABOVE POT SIZES, 5g TABLET FOR
          · COORDINATE INSTALLATION OF SEDIMENT & EROSION CONTROL DEVICES WITH CIVIL                                                                                                                                                                                                               progress payment claim.               Maintenance activities carried out.
                                                                                             · ALL FIELD INLETS & SUBSURFACE DRAINS TO BE CONNECTED TO EXISTING DRAINAGE         TUBESTOCK.
            CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES.                                                                                                                                                                                                                  MP - Provide completed activities     Successful maintenance.
                                                                                               SYSTEM. REFER ENGINEER'S & ARCHITECT'S PLANS FOR DRAINS & HYDRAULIC SERVICES.   · CULTIVATE SUBGRADE TO 150mm.                                                               Monitoring
          · ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY STABILISED TO                                                                                                                                                                                                                list to LA after every 3 months.
                                                                                             · SUBSURFACE DRAIN TO BE 100mm MINIMUM AG-FLOW PIPE CENTRED IN 300mm x 300mm      · SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.
            PREVENT EROSION.                                                                                                                                                   · REMOVE PLANTS FROM CONTAINERS / BAGS / TUBES CAREFULLY & INSPECT ROOTBALL,
                                                                                               GRAVEL TRENCH SURROUNDED BY LA APPROVED PERMEABLE BIDIM.
                                                                                             · LANDSCAPE FIELD INLETS TO BE 300mm X 300mm x 450mm CONCRETE SUMPS WITH H.D.       REMOVE OLD MATTED & COILED ROOTS TO EXPOSE YOUNG ROOTS. ALL STOCK TO BE FREE
          SITE WORKS                                                                                                                                                             OF STRUCTURAL DEFECTS ABOVE & BELOW SOIL LINE (I.E. NO GIRDLED ROOTS).
                                                                                                                                                                                                                                                                            SOURCES:
                                                                                               GALVANISED SURFACE GRATE / LID. DETERMINE REQUIREMENTS ON-SITE IN ADDITION TO
          · REMOVE ALL UNWANTED MATERIAL, DELETERIOUS & OPERATIONAL DEBRIS FROM SITE.                                                                                                                                                                                       · SURVEY - VIA ENGINEER  · ENGINEERING - SCG
                                                                                               THOSE ON PLANS.                                                                 · DO NOT MIX SOIL FROM HOLE WITH MULCH.
          · PLAN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.                                                                                                                                                                                                         · ARCHITECTURE - ACE SPACE DESIGN
                                                                                             · ENSURE ALL DAMAGED STORMWATER PIPES ARE REPLACED & RELOCATED AS NECESSARY.      · ROUGHLY SQUARE HOLE SIDES.
          · VERIFY ALL DIMENSIONS IN-THE-FIELD.                                                                                                                                · FILL HOLE WITH WATER, ALLOW TO DRAIN BEFORE PLANTING.
                                                                                             · STORMWATER DRAINAGE TO BE 100mm MINIMUM uVPC DRAINAGE PIPE.
          · WHERE BAD GROUND OCCURS OR LEVELS PROVIDED ARE NOT FUNCTIONAL REFER TO LA.
                                                                                             · ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &         · INSTALL FERTILISER TABLET(S), INSTALL PLANT, BACKFILL PLANT WITH AMELIORATED SITE          TESTING:
          · ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &                                                                                              TOPSOIL. IF NONE IS AVAILABLE, BACKFILL WITH MRTS 16B TOPSOIL.                             · FURNISH LA WITH SOILS TESTING RESULTS & AMELIORATION RECOMMENDATIONS FOR
                                                                                               GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LA BEFORE CONTINUING WORKS.
            GARDENS ETC. MAY IMPEDE DRAINAGE, REFER TO SUPER BEFORE CONTINUING WORKS.                                                                                          · WATER PLANT IN WELL & MAINTAIN SOIL MOISTURE LEVELS THROUGH E.P.                             APPROVAL.
                                                                                             · ENSURE DRAINAGE WORKS CORRELATE WITH, & DO NOT DISTURB, ADJACENT LAND.
          · ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND.                                                                                                                · DO NOT COMPACT PLANT PIT.
                                                                                             · SEE LEGEND FOR PLAN SYMBOLS & PLANS FOR LOCATIONS.
          · CIVIL DESIGN HAS PROVIDED A POSITIVELY DRAINED SITE HOWEVER, WHERE DRAINAGE
            ISSUES ARE IDENTIFIED REFER SUPER.
                                                                                             · WHERE DRAINAGE IS REQUIRED THE FOLLOWING APPLIES:                                                                                                                            CERTIFICATIONS:
                                                                                                     - ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE WHERE PATHS &       NEW TURFED AREAS                                                                             · FURNISH LA WITH FOLLOWING CERTIFICATIONS PRIOR TO ON-MAINTENANCE
          · REFER TO 2.0 LANDSCAPE CONSTRUCTION - DRAINAGE FOR MORE INFORMATION.                                                                                               · EXCAVATE CIVIL FINISH LEVELS 150mm FOR TURF AREAS (UNLESS COMPLETED BY BUILDER).
                                                                                                       LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE)                                                                                                           INSPECTION;
                                                                                                     - ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH,   · CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.                                                      - AS 2303:2015 - MRTS 16 TOPSOIL - AS4454 FOR MULCH
          SLEEVING & CONDUITS                                                                                                                                                  · CIVIL CONTRACTOR TO HARVEST, STOCKPILE & RE-SPREAD SITE TOPSOIL.
                                                                                                       DISCHARGE TO NATURAL DRAINAGE LINES.
          · SUPPLY & INSTALL 2 - 150mmØ SOLID HVPC PIPING UNDER ALL BUILDING EXTERIOR                                                                                          · LANDSCAPE CONTRACTOR TO TEST TOPSOIL TO AUSTRALIAN STANDARDS FOR SOIL
                                                                                                     - ALLOW FOR 300mm x 300mm LATERAL COLLECTION TRENCHES EXTENDING NOM. 1m                                                                                                SAMPLE APPROVALS:
            HARDSTAND AREAS THAT BISECT LANDSCAPE AREAS FOR IRRIGATION & LANDSCAPE                                                                                               MODIFICATION RECOMMENDATIONS.
                                                                                                       EITHER SIDE OF LOW POINT.                                                                                                                                            · FURNISH LA WITH FOLLOWING SAMPLES FOR LA APPROVAL PRIOR TO CONSTRUCTION;
            DRAINAGE PURPOSES. EXTEND ENDS 300mm BEYOND PATHS, EACH SIDE & CAP.                                                                                                · ALLOWANCES SHALL BE MADE BY LANDSCAPE CONTRACTOR TO ADJUST TOPSOIL FOR pH
                                                                                                                                                                                                                                                                                   - HOOP PINE MULCH - ROCK / COBBLE MULCH
                                                                                              GRAVEL MULCH                                                                       BALANCING & NUTRIENT IMPROVEMENTS.
          TOPSOIL HARVESTING, STOCKPILING, RE-USE & SPREADING                                                                                                                  · TRIM AMELIORATED TOPSOIL, FILL DEPRESSIONS & PROVIDE EVEN FALLS AS INDICATED
                                                                                             · INSTALL DECORATIVE GRAVEL MULCHING PER FINISHES SCHEDULE.
          · BUILDER SHALL STRIP TOP 300mm OF TOPSOIL FROM SITE GARDEN AREAS & 150mm FROM                                                                                         ON DRAWINGS.
            TURFED AREAS & STOCKPILE TOPSOIL. LANDSCAPE CONTRACTOR TO COORDINATE WITH                                                                                          · FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH & UNDULATING, FREE FROM
                                                                                             EDGING
            BUILDER TO ENSURE TOPSOIL IS RE-INSTALLED PER THE FOLLOWING SPECIFICATIONS IN

                                                                                                                                                                                                                                                                                             APPROVED PLANS
                                                                                             · SUPPLY, INSTALL, & MAINTAIN EDGES PER PLAN & DETAILS.                             DELETERIOUS MATERIALS, DEBRIS, LARGE CLODS OF SOIL, STONES, & ORGANIC MATTER,
            RESPECTIVE LANDSCAPING AREAS.                                                                                                                                        POSITIVE FLOWING MINIMUM 2% SLOPES & NO PONDING AREAS. CO-ORDINATE ON-SITE WITH
          · TOPSOIL STOCKPILING SHALL OCCUR IN AN AREA ADJACENT TO THE STRIPPED AREA(S) OR                                                                                       LA & ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF. WHERE TURF MEETS HARD
                                                                                             PLANTING
            AREA BY BUILDER WHICH WILL NOT HINDER WORKS INSPECTION VISIBILITY.
          · STOCKPILE TOPSOIL TO ENSURE NO PONDING OF WATER & POSITIVE DRAINAGE.
                                                                                             NEW GARDENS
                                                                                                                                                                                 EDGES, ADJUST FINISH TOPSOIL LEVELS TO ALLOW STORMWATER TO FLOW UNIMPEDED
                                                                                                                                                                                 OVER LAID TURF TO LOW AREA RESPECTIVELY.                                                                 MCU16/0112 & OPW16/0209
                                                                                                                                                                                                                                                                                              NOOSA COUNCIL
          · INSTALL EROSION CONTROL MEASURES PER ENGINEER & ABOVE FOR STOCKPILED TOPSOIL.                                                                                      · SUPPLY & LAY 'A' GRADE TURF PER PLANS & THE PLANTING SCHEDULE.
                                                                                             · EXCAVATE FINISH LEVELS 300mm FOR GARDEN AREAS.
          · LANDSCAPE CONTRACTOR TO CONDUCT SOILS ANALYSES TESTS TO STOCKPILED TOPSOILS                                                                                        · WHERE TURF IS INSTALLED ON SLOPES >20% PIN TURF TO INDUSTRY STANDARDS. REMOVE
                                                                                             · CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.
            & AMELIORATE PER RECOMMENDATIONS PRIOR TO RE-SPREADING. FURNISH LA WITH

                                                                                                                                                                                                                                                                                             19 JANUARY 2017
                                                                                                                                                                                 PINS ONCE TURF IS WELL ESTABLISHED.
            RESULTS. LANDSCAPE CONTRACTOR TO ALLOW FOR FOR pH BALANCING & NUTRIENT                                                                                             · WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED.
            AMELIORATIONS. ALL SOIL TESTING TO BE CONDUCTED BY A LAB ACCREDITED BY NATA.
          · SHOULD AMENDED SITE TOPSOILS BE INSUFFICIENT IN QUANTITY, LANDSCAPE
            CONTRACTOR TO IMPORT MRTS 16 TOPSOIL & SPREAD TO PROPOSED PLAN FINISH LEVELS.
            PRIOR TO SPREADING, IMPORTED TOPSOILS SHALL HAVE SOILS ANALYSES TEST AS PER
            ABOVE. IMPORTED SOILS SHALL THEN BE AMENDED PER TEST RESULTS PRIOR TO
            SPREADING.


                                                                                                                                                                                                                                                                                             S1608900
                                                                                                                                                                                                                                                                                             1609-A                                 anembo consultants
RAFTSEA PTY LTD                                                   PROPOSED INDUSTRIAL DEVELOPMENT                                                                                                                                                                                                                                   Landscape Architects
                                                                                                                                                                                                                                                                                                                                    Environmental
                                                                                                                                                                                                                                                                                                                                                                        Project Management


This document is the copyright of anembo consultants & shall
                                                                  LOT 4 SP244573                                                                                                                                                                                                                                                    anembo consultants pty.ltd.       A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                    Sunshine Coast:   PO Box 24   Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                                  85 RENE ST, NOOSAVILLE, Q, 4566                                                                                                                                                                                                                                   Ph: 07 5437 0000                      Fax: 07 5437 0088
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                 e-mail: [email protected]               www.anembo.com

Page 7

                                                                                                          TUBESTOCK PLANT, REFER TO PLANT
                                                                                                          SCHEDULE FOR SPECIES

                                                                                                          FORM SHALLOW SAUCER SHAPED
                                                                                                          DEPRESSION AROUND PLANT BASE

                                                                                                          100mm DEEP ORGANIC MULCH AS                                        PLANT PIT 2X WIDTH OF            2x POT Ø                    SHRUB / GROUNDCOVER / TUFTY
                                                                                                          SPECIFIED. KEEP MINIMUM 50mm                                       RESEPCTIVE POT. SCARIFY ALL                                  GRASS PLANT SPECIES PER PLAN
                                                                                                          CLEAR OF PLANT STEM.                                               PIT WALLS & BOTTOM, TYP.          POT Ø

                                                                                                                                                                             BACKFILL PLANT PIT WITH                                      100mm ORGANIC MULCH PER
                                                                                                          GARDEN BED TOPSOIL AS SPECIFIED,                                   TOPSOIL AS PER GENERAL NOTES,                                GENERAL NOTES, KEEP MIN. 50mm
                                                                                                          AVOID COMPACTION, TYP.                                             AVOID COMPACTION, TYP.                                       FROM PLANT STEM. FORM SHALLOW
                                                                                                                                                                                                                                          DISH DRAIN TO BASE OF PLANT, TYP.
                                                                                                          CULTIVATED SUBGRADE TO 150mm                                       GARDEN BED TOPSOIL AS
                                                                                                                                                                             PER GENERAL NOTES, AVOID
                                                                                                                                                                             COMPACTION, TYP.

                                                                                                                                                                             100mm, TYP.
                                                                                                          SLOW RELEASE FERTILISERAS                                                                                                       'AGRIFORM' SLOW RELEASE
                                                                                                          SPECIFIED. USE PHOSPHORUS FREE                                                                                                  FERTILISER. TYPE, SIZE & FORMULA
                                                                                                          TABLETS FOR CALLISTEMONS &                                                                                                      PER GENERAL NOTES. DO NOT USE
                                                                                                                                                                             2x ROOTBALL                                                  FOR BANKSIA, CALLISTEMON OR
                                                                                                          GREVILLEAS.
                                                                                                                                                                             DEPTH, TYP.                                                  GREVILLEA SPECIES, TYP.
                                                                                                          SUBGRADE
                                                                                                                                                                             150mm, TYP.                                                  150mm DEEP CULTIVATED
                                                                                                                                                                                                                                          SUBGRADE, OR AS PER
                                                                                                                                                                             EXISTING SUBGRADE, TYP.                                      GENERAL NOTES, TYP.




                                                                                1    TUBESTOCK PLANTING                              N.T.S.                                                POTTED SHRUB, GROUNDCOVER OR TUFTY GRASS PLANTING
                                                                               LD2   Typical Section                                                                                                                                                                  N.T.S.



                                                                  APPROVED PLANS
                                                               MCU16/0112 & OPW16/0209
                                                                   NOOSA COUNCIL
                                                                  19 JANUARY 2017


                                                                                                                                 NOTES:
                                                                                                                                 ENSURE CROWN OF ROOTBALL LEVEL IS
                                                                                                                                 SET HIGHER THAN ADJACENT FINISHED
                                                                                                                                 GROUND LEVELS TO PREVENT EXCESSIVE
                                                                                                                                 PONDING AROUND ROOTBALL.




                                                                                                                                 50mm WIDE HESSIAN TREE TIES WRAPPED
                                                                                                                                 LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
                                                                                                                                 SECURED TO STAKE WITH GALVANISED NAILS
                                                                                                                                 OR STAPLES. POSITION TREE TIE BETWEEN
                                                                                                                                 1/3 TO 1/2 OVERALL HEIGHT OF TREE.

                                                                                                                                 2 - 50 x 50 x 2400mm F14 HARDWOOD
                                                                                                                                 CENTRALLY POINTED NON-TREATED STAKES.
                                                                                                                                 STAKES TO BE DRIVEN VERTICALLY INTO
                                                                                                                                 GROUND OUTSIDE OF THE ROOTBALL &
                                                                                                                                 SHALL HAVE A FINISHED HEIGHT LOWER
                                                                                                                                 THAN THE TREES LOWER LATERAL LIMBS.

                                                                                                                                FORM SHALLOW SAUCER SHAPED
                                                                                                                                DEPRESSION AROUND BASE OF PLANT.
                                                                                                                                KEEP MULCH NOM. 50mm FROM TRUNK                                                  PIT 2x
                                                                                                                                BASE.                                                                            ROOTBALL Ø

                                                                                                                                100mm DEEP ORGANIC MULCH AS
                                                                                                                                SPECIFIED. MOUND MULCH AT EDGE OF
                                                                                                                                PLANT PIT TO COLLECT WATER TO FALL
                                                                                                                                DOWN EDGES OF PLANT PIT. DO NOT MULCH
                                                                                                                                WITHIN 50mm OF PLANT STEM.




                                                                                                                                TREE PIT TO BE EXCAVATED TO NOMINAL
                                                                                                                                DEPTH OF 600mm. BACKFILL HOLE WITH
                                                                                                                                100% FRIABLE AMELIORATED SITE TOPSOIL
                                                                                                                                FIRMING PROGRESSIVELY. ALL EXCAVATED
                                                                                                                                FILL TO BE REMOVED OFF SITE.
                                                                                                                                SCARIFY PIT WALLS & CULTIVATE PIT
                                                                                                                                BOTTOM 150mm, TYP.
                                                                                                                                SLOW RELEASE FERTILIZER AS PER
                                                                                                                                MANUFACTURERS SPECIFICATIONS &
                                                                                                                                GENERAL NOTES.                                                                                SLOW RELEASE FERTILIZER AS PER
                                                                                                                                                                                                                              MANUFACTURER'S & SPECIFICATIONS, TYP.


                                                                                                                                                                    N.T.S.




                                                                                                                                                                                                                                                               S1608900
                                                                                                                                                                                                                                                               1609-A          anembo consultants
RAFTSEA PTY LTD                                                         PROPOSED INDUSTRIAL DEVELOPMENT                                                                                                                                                                        Landscape Architects
                                                                                                                                                                                                                                                                               Environmental
                                                                                                                                                                                                                                                                                                                   Project Management


This document is the copyright of anembo consultants & shall
                                                                        LOT 4 SP244573                                                                                                                                                                                         anembo consultants pty.ltd.       A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                               Sunshine Coast:   PO Box 24   Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                                        85 RENE ST, NOOSAVILLE, Q, 4566                                                                                                                                                                        Ph: 07 5437 0000                      Fax: 07 5437 0088
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                            e-mail: [email protected]               www.anembo.com

Page 8

                    FINISHES SCHEDULE                                                                                                                                                                                                                                  LANDSCAPE PLANS LEGEND                       DETAIL
                   Softscape Landscape Items
                   CODE              ITEM                                       PRODUCT/ DESCRIPTION                            SIZE/PATTERN                                 FINISH                                                           COLOUR
                                     Topsoil                                    Existing site topsoil refer Specifications      Top Soil & Soil Preparation - As per General Smooth, uniform, & weed free topsoil mulch surfaces, with        As supplied
                                                                                                                                Notes, per plan nominated areas.             no deleterious materials.

                                                                                Decorative Gravel Mulch                         50mm Ø                                       200mm depth, uniform coverage over pinned geo-fabric             As supplied by builder
                                      Gravel Mulch (decorative)
                                      Organic Mulch                             Gardens - Hoop Pine                             25mm+Ø+                                      Uniform finish 100mm deep, free of deleterious materials.        As supplied


                     SC               Organic Mulch Area                        Bio-basin Media Areas - Sugar Cane Mulch        As supplied                                  Uniform finish free of deleterious materials & weed seed (i.e.   As supplied
                                                                                                                                                                             Nut Sedge), 100mm deep. Install pinned open weave jute
                                                                                                                                                                             netting over mulch.




                                      PLANT SCHEDULE
                                      CODE                 GENUS species - Common Name                       Qty    Size      Staked
                                      TREES
                                      PAN uti              PANDANUS utilus - Red Edged Pandanus              2      Ex. Ground Yes
                                      XAN chr              XANTHOSTEMON chrysanthus - Golden Penda           6      45 L       Yes


                                                                                                                                                                                         APPROVED PLANS
                                      SHRUBS
                                      BAN rob              BANKSIA robur - Swamp Banksia                     21     140mm

                                                                                                                                                                                      MCU16/0112 & OPW16/0209
                                      COR kil              CORDYLINE 'Kilauea'                               5      200mm
                                      LEP liv              LEPTOSPERMUM liversidgei - Olive Tea Tree         5      200mm

                                                                                                                                                                                          NOOSA COUNCIL
                                      MET spr              METROSIDEROS 'Springfire'                         16     140mm


                                                                                                                                                                                         19 JANUARY 2017
                                      GROUNDCOVERS
                                      DIE gra DIETES grandiflora - Bearded Iris                              95     140mm
                                      LOM hys LOMANDRA hystrix - Mat Rush                                    72     140mm
                                      MYO eli MYOPORUM ellipticum - Coastal Myoporum                         128    140mm
                                      SCA mau SCAEVOLA 'Mauve Clusters'                                      61     140mm

                                                                                       , all from tubes      Area A = 15      Area B = 50
                                      ISOLEPSIS nodosa - Knobby Club Rush                                    30               100
                                      JUNCUS usitatus - Common Rush                                          30               100
                                      LOMANDRA hystrix - Mat Rush                                            60               200




                                                                                                                                                                                                                                                                             S1608900
                                                                                                                                                                                                                                                                             1609-A       anembo consultants
RAFTSEA PTY LTD                                                                   PROPOSED INDUSTRIAL DEVELOPMENT                                                                                                                                                                         Landscape Architects
                                                                                                                                                                                                                                                                                          Environmental
                                                                                                                                                                                                                                                                                                                              Project Management


This document is the copyright of anembo consultants & shall
                                                                                  LOT 4 SP244573                                                                                                                                                                                          anembo consultants pty.ltd.       A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                          Sunshine Coast:   PO Box 24   Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                                                  85 RENE ST, NOOSAVILLE, Q, 4566                                                                                                                                                                         Ph: 07 5437 0000                      Fax: 07 5437 0088
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                       e-mail: [email protected]               www.anembo.com

Page 9

                                                                                                                 5.4




                                                                                                                   5.2




                                                                                                 4.8               5.0




                                                                                                          APPROVED PLANS
                                                                                                       MCU16/0112 & OPW16/0209                       PLAN NOTES:
                                                                                                                                                     See LD3 for Schedules and LEGEND

                                                                                                           NOOSA COUNCIL
                                                                                                                                                                      WARNING
                                                                                                          19 JANUARY 2017                                   THE LOCATION OF EXISTING & PROPOSED TELSTRA,
                                                                                                                                                            ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
                                                                                                                                                            SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
                                                                                                                                                            & DURING CONSTRUCTION OBTAIN THE LOCATION OF
                                                                                                                                                            ALL SERVICES (UNDERGROUND & OVERHEAD) FROM
                                                                                                                                                            THE RESPONSIBLE AUTHORITY & DESIGNER
                                                                                                                                                            RESPONSIBLE FOR THE SERVICE SHOWN.

                                                                                                                             S1608900
                                                                                                                             1609-A     anembo consultants
RAFTSEA PTY LTD                                                PROPOSED INDUSTRIAL DEVELOPMENT                                          Landscape Architects
                                                                                                                                        Environmental
                                                                                                                                                                                Project Management


This document is the copyright of anembo consultants & shall
                                                               LOT 4 SP244573                                                           anembo consultants pty.ltd.         A.B.N. 75 089 473 156
                                                                                                                                        Sunshine Coast:   PO Box 24     Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                               85 RENE ST, NOOSAVILLE, Q, 4566                                          Ph: 07 5437 0000                        Fax: 07 5437 0088
                                                                                                                                        e-mail: [email protected]                 www.anembo.com
can not be guaranteed when printing from PDF files.                                                         LANDSCAPE PLAN

Page 10

                                                                                                          APPROVED PLANS
                                                                                                       MCU16/0112 & OPW16/0209
                                                                                                           NOOSA COUNCIL
                                                                                                          19 JANUARY 2017




                                                                                                                          6.0




                                                                                                         5.8




                                                                              INDUSTRIAL DEVELOPMENT                                                    PLAN NOTES:
                                                                                                                                                        See LD3 for Schedules and LEGEND

                                                                                                                  5.6
                                                                                                                                                                         WARNING
                                                                                                                                                               THE LOCATION OF EXISTING & PROPOSED TELSTRA,
                                                                                                                                                               ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
                                                                                                                                                               SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
                                                                                                                                                               & DURING CONSTRUCTION OBTAIN THE LOCATION OF
                                                                                                                                                               ALL SERVICES (UNDERGROUND & OVERHEAD) FROM
                                                                                                                                                               THE RESPONSIBLE AUTHORITY & DESIGNER
                                                                                                                                                               RESPONSIBLE FOR THE SERVICE SHOWN.

                                                                                                                                S1608900
                                                                                                                                1609-A     anembo consultants
RAFTSEA PTY LTD                                                PROPOSED INDUSTRIAL DEVELOPMENT                                             Landscape Architects
                                                                                                                                           Environmental
                                                                                                                                                                                   Project Management


This document is the copyright of anembo consultants & shall
                                                               LOT 4 SP244573                                                              anembo consultants pty.ltd.         A.B.N. 75 089 473 156
                                                                                                                                           Sunshine Coast:   PO Box 24     Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
                                                               85 RENE ST, NOOSAVILLE, Q, 4566                                             Ph: 07 5437 0000                        Fax: 07 5437 0088
                                                                                                                                           e-mail: [email protected]                 www.anembo.com
can not be guaranteed when printing from PDF files.                                                            LANDSCAPE PLAN

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.