Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - engineering response plans

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 10, section 2. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
25




                                                                                                                                                                                                                                                                                                                                                                              CROSSOVER AS PER NSC STD DWG                               THEY ARE IN A PAVED SURFACE.
                                                                                                                                                                                                                                                                                                             25.92



                                       22.10                                                                                                                                                                                                                                                                                       17
                                                                                                                                                                                                                                                                                               .2




                                                                                               22.97                                                                                                                                                                                                                               26.17
                                                                                                               0"




                                                                                                                                                                                                                                                                                             25




                                                                                                                                                                                                                                                                                                                                 .
                                                                                                                                                                                                                                                                                                                                                                                                                               4. LINEMARKING
                                                                                                                                                                                                                                                                                                                              26
                                                                                                                    23
                                                                                                                       .6                                                                                                                                                                                                                                                     RS-049 & RS-050. UNIT 1 DRIVEWAY
                                                                                                                           5                                                                                                                                                                                                                                                                                                     4.1.    REDUNDANT LINEMARKING IS TO BE GROUND OFF.
                                                                                                                                                                                                                                                                                                                                                                              ALIGNMENT - REFER DWG C31 FOR
                                                                                                                                                                                                 5




                                                                                                                                                                                                                                                                                                                                                                                                                                 4.2.    THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
                                                                                                                                                                                          .6 4.7




                                                                                                                                                                                                                                                                                                                                                                              LONGSECTION AND VERTICAL
                                                                                                                                                                                              2
                                                                                           8
                                                                                      .4




                                                                                                                                                                                            9




                                                                 22.12                                                                                                                                                                                                                                                                                                        CLEARANCE. LOCALLY GRADE TO
                                                                                    22




                                                                                                                                              23.72                                             24.69
                                                                                                                                                                                          24




                                                                                                                                                                                                                                                                                                                                                                                                                                    JOINTING NOTES
                                                     0                    22.08                                                          23                                                                                                                                                                                                                                   MATCH EXISTING.
                                                22.0
                                                                                                                                                                                                                                            0




                                                                                                                                           .06                             23.97
                                                                                                                  Valve
                                                                                                                                                                                                                                         .8




                                                                                                                                                                                                                                         24.80                                                                                                                                                                                 1.     ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE
                                                                                             Po
                                                                                                                                                                                                                                      24




                                                                                      08
                                                                                                                                                                                                                                            +24.60




                                                                                  22.               we                                                           23.37                                                                                                                                                                                                                                                               REQUIREMENTS OF AS3727.1:2016.
                                                                                                                                                                                                                                                                                  CAP
                                                                                                                                                                                                                                                                                                    +25.40




                                                                                                                                                                                                       282°02
                                                                                                                                                                                                                                                          8




                                                                                                         r p
                                                                                                                                                                                                                                                        .7




                                                                                                                                                                                                                                                          24.78                                                                                                                                                                2. REFER TO STRUCTURAL PLANS FOR INTERNAL SLAB JOINTING LAYOUT.
                                                                                                                                                                                                                                                      24




                                                                21.98                                                                                                                                         '00"
                                                                                                                                                                                                                                                                                         +25.30




                                                                     it 8                     22.09               ole                             Telstra P                                                                                              24.7                       25.20                                                                                                                                      3. SAW CUT JOINTS MUST BE:
                                                                   P
                                                                  y .9                                                                                                      it                          16.090                                   24.4
                                                                                                                                                                                                                                                     3       8
                                                                                                                                                                                                                                                                                                                     .51                                                                                                         3.1.       BETWEEN 41 AND 31 OF CONCRETE PAVEMENT DEPTHS.
                                                                 l
                                                             Gul      21
                                                                                             22
                                                                                                                                                                                                                                                                                                                  2255.51                                                                                                        3.2.      CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.
                                                                                                                                                                                                                                                                                            25




                                                                                                                                                                                                                                                         Fire Hydrant                                             25.
                                                                                                                                                                                                                                                                                             25 5




                                                                                                                               22                                                                                                                                                                                                                                                                                                3.3.      PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.
                                                                                                 .00
                                                                                                                                                       Back o                                                                                                                                                        37
                                                                                                                                                                                                                                                                                               .1




                                                                                                                                     .42
                                                                                                                                                                                                                                                                                                .4




                    NOMINAL LOCATION OF NEW 1.5M                                                                                                               f Kerb                                                                                                                                                                                                                                                          4. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO
                                                                                                                                                                                                                                                                                                   5




                    WIDE FOOTPATH AS PER NOOSA                                                                        31                                                                                                                                                                                                                                                                                                              ALLOW EXPANSION AND CONTRACTION MOVEMENTS.
                                                                                                                  22.                              Edge o
                    SHIRE COUNCIL STD DWG RS-065 &                                                                                                        f Bitum
                                                                                                                                                                  en
                                                                                                                                                                                                                           23.58                                                                  25                                                                                                                           5. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                                      CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN THE
                                                                                                                                                                                                                                                           CJ
                                                                                                                                                                                                                                                                                                                24.82
                    NSD-9006E                                                                                                                                                                                             23                                                                                    Sewer Manhole                                                                                                         CONCRETE SLAB AND AVOID MISMATCHED JOINTS.
                                                                                                                                                                                                                             .46                                                                                                                                                                                               6. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY
                                                                                                                                                                                                                                                                                                                                                                                                                                      AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.
                                                                           MODIFY HYDRANT TO SUIT PROPOSED                                                                                                                                                                                                              24.95                                                                                                  7. DOWEL BARS ARE TO BE                                                             NOTE:
                                                                           DRIVEWAY SURFACE LEVEL                                                                                                                                                                                                                      24.8
                                                                                                                                                                                                                                                                                                                                                                                                                                 7.1.      FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT              EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN
                                                                                                                                                                                                                                                                                                                              5                                                                                                            400MM CENTRES                                                           DRAWINGS, ALL IN-GROUND SERVICES WITHIN THE PROPERTY
                                                                                                                                                                                                                                                                                                                                                                                                                                 7.2.      FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT              BOUNDARY INCLUDING BUT NOT LIMITED TO: STORMWATER
                                                                                                                                                                                                                                                                                                                                                                                                                                           300MM CENTRES                                                           DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL AND
                                                                                                                                                                                                                                                                                                                                                                                                                                 7.3.      FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT              COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
                                                                                                                                                                                                                                                                                                                                                                                                                                           300MM CENTRES                                                           REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY.
                                                                                                                                                                                                                                                                                                                                                                                                                                 7.4.      FOR 200MM THICK SLAB, 24MM Ø OF LENGTH 40MM AND SPACED AT 300MM         CONTRACTOR TO ARRANGE ALL NECESSARY APPLICATIONS
                                                                                                                                                                                                                                                                                                                                                                                                                                           CENTRES                                                                 AND PERMITS WITH THE RELEVANT AUTHORITIES. SERVICES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   PROVIDER SPECIFICATIONS AND STANDARD DETAILS



                                                                                                                                                                                                                                    CLIENT DETAILS:                                                                                                                          PROJECT ADDRESS:                             APPROVED BY:                                      PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                                                                                                                                                             6 WYANDRA STREET, NOOSA HEADS
                                                                                                                                                                                                                                                           CAPITAL PRUDENTIAL                                                                                                                                                                                               TITLE:                                  STATUS:

                                                         D       28/10/2022 REISSUED FOR APPROVAL                                                                                MVP                  BP                 NW                                                                                                                                                               6 WYANDRA STREET                                                                  ROADS AND DRAINAGE                      FOR APPROVAL
           © ABN 89 647 469 707                          C
                                                         B
                                                                 11/07/2022 ISSUE FOR OPW
                                                                 24/06/2022 UPDATE ISSUE FOR MCU
                                                                                                                                                                                 BP
                                                                                                                                                                                 BP
                                                                                                                                                                                                      NW
                                                                                                                                                                                                      NW
                                                                                                                                                                                                                         NW
                                                                                                                                                                                                                         NW                                                                                                                                                                  NOOSA HEADS                        NATHAN WAGSTAFF                             LAYOUT PLAN                             NOT FOR CONSTRUCTION
             75 NOOSA DRIVE                                                                                                                                                                                                                                                                                                                                                                                                        RPEQ: 20693
                                                         A       30/03/2022 ISSUED FOR MCU                                                                                       BP                   NW                 NW         SCALE:
          NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                                                                                                                                                      CPEng
              +61 7 5211 1003                        REV             DATE                                 DESCRIPTION                                                        DWN                    CHK              APP
                                                                                                                                                                                                                                                                                         1:100                                                                                                                                   DATE: 28/10/2022
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            DRAWING NUMBER:                         PROJECT NUMBER:                            SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SIZE:
          RECORCONSULTING.COM                                                                                           REVISIONS
                                                                                                                                                                                                                                                                   DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            C30                                      20220078                                   A1 D
Log in to download the original file

RFI - engineering response plans.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.