Original source · versioned page text
RFI - engineering response plans
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnN
NOTE:
1. FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR
TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS
SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE
CONTRACT.
rant
24.70 24.79
3. LOCATION AND DEPTH OF ANY EXISTING SERVICES IDENTIFIED BASED ON SURVEY, DBYD
Hyd
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL
CLEAR AND GRUB ALL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY EXCAVATION OR TRENCHING WORKS.
Fire
24.68 VEGETATION WITHIN SITE
Sewer Manhole BOUNDARY
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE AND WITHIN
25.41 25.46 VERGE PRIOR TO COMMENCEMENT OF WORKS.
25
.77 5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS
COMMENCING ON SITE.
24.7 26.35
3 TREE 0.1 6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED, GRUBBED AND
50805
5
REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY
.2
24
25
26.83
24.00 .69
TREE 0.151004 27.0 Sewer OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER.
24.10 2
LIL 0.1 Line In
7
27.07 dicative
.5
3
50905
.7
26
26.60
9
Only (N
25
n
.2
rb
26.22
25
ot Loc
tume
26.69
of Ke
25.
52 26.09 ated b 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE
5
27.
y
.3
71 86 Survey)
27. ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING.
26
2
.8
of B i
3
24
.4
26
24.17
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE
0
2
2
Back
41
.7
.9
24. 4
26.
26
25
26.41 CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS
Deck
Edge
CAN COMMENCE.
4
.6
Telstra
26
25 26.
.84 45 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
Pit
6
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
.4
23.57
25
4
.5
23.
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS, RETAINING
24
67
WALLS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
26
.50 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS TO CARRY
0
OUT SERVICES RELOCATION OR ALTERATIONS.
.5
9
26
.4
27.
27
Deck Stairs
6 4
23.
DEMOLISH AND REMOVE 69
71 3
.50
23.22
Ramp
0
EXISTING DRIVEWAY 23.3 0 NOTE:
23
NC
POI
23.27
.98
5
.0
EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL
2
25
23.
.9
73
23
IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT
41 LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL
23.
23
AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED FROM
8
9
.5
.65
.7
24
SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
23
6
.1
26.1
26
NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES.
Floor Level
9
74
.0
8
SERVICES TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE
23.
2
27
0
.1
0
27
PROVIDER SPECIFICATIONS AND STANDARD DETAILS
RL26.19
23.
24
23.00
.35
36
24.
1
.34
.1
25
23
25.25
.63
22.68
Deck
24
Co
.06
nc
25
ret
59
23. 25.
19
e
23.8
23.94
Dr
.23
6
.9
TBM (Screw in Kerb) .57
ive
26
25
7
22 3
RL22.58 AHD 26.5
wa
22.59
25
5
y
26.85
.3
23.7
Stairs
23
Gully Pit 55
5
.
24.
8
21
.2
22.36
Garage Level
24
22.49 1
.35
.3
4
22
25
RL25.33
.6
24
0
26
.47
26.
3
.4
24.9
25
37
22.25 22.36
23
66
25
.7
.
07
22
.15
25.
5
04
24.80
.
23
DEMOLISH AND REMOVE FROM 24.
94
3
SITE ALL EXISTING STRUCTURES,
.1
22.21
25
23
25.92
22.10
7
PAVING AND RETAINING WALLS 22.97
.1
.
25
26
23
.65
5
.6 4.7
2
LOCATE AND CAP OFF EXISTING SEWER
8
.4
9
22.12
22
23.72 CONNECTION DURING EARTHWORKS
24
22.0
0 22.08 23
80
.0 23.97
Valve 6
.
Po
24
.08
22 we 23.37 CAP
8
r p
.7
24
21.98
it 22.09 ole Telstra P 24.7 25.20
y P .98
3 8
l it 24.4 .51
Gul 21
22
25
25
Fire Hydrant 25.
25 5
22
.0
Back o 37
.1
.42
.4
0
f Kerb
5
31
22. Edge o
f Bitum 23.58
en 24.82
23
.46 Sewer Manhole
24.95
24.8
5
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
D 21/10/2022 REISSUED FOR APPROVAL MVP BP NW 6 WYANDRA STREET EXISTING SITE SERVICES FOR APPROVAL
© ABN 89 647 469 707 C
B
11/07/2022 ISSUE FOR OPW
24/06/2022 UPDATE ISSUE FOR MCU
BP
BP
NW
NW
NW
NW NOOSA HEADS NATHAN WAGSTAFF PLAN NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 30/03/2022 ISSUED FOR MCU BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:100 DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C02 20220078 A1 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.