RFI - engineering response plans

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                       500 - 600mm
                                                                                                                                                                                                                                                                                                                                                                                               1.5m STAR
                                                                                                                                                                                                                                                                                                                                                                                               PICKETS
                                                                                                                                                                                                                                                                                                                                                                                               AT MAX. 2.5m CENTRES

                                                                                                                                                                                                                                                                                                                                                                                               SELF-SUPPORTING
                                                                                                                                                                                                                                                                                                                                                                                               GEOTEXTILE
                                                                                                                                                                                                                                                                                                                                                                                                           OW
                                                                                                                                        1 METER MAX.                 STAR PICKETS                                                                                                                                                                                                          DIRECTION OF FL

                                                                                                                                                                    DROP INLET
                                                                                                                                                                    WITH GRATE
                                                                                                                                                                                                                                                                                                                                                                                               ON SOIL, 150mm x 100mm
                                                                                                                                                                    WIRE OR STEEL MESH
                                                                                                                                                                    (14 GAUGE x 150mm                                                                                                                                                                                                          TRENCH WITH
                                                                                                                                                                    OPENINGS) WHERE GEOTEXTILE                                                                                                                                                                                                 COMPACTED BACKFILL
                                               PROVIDE WASH WATER FOR                                                                                               IS NOT SELF-SUPPORTING                                                                                                                                                                                                     AND ON ROCK, SET INTO
TIMBER SLEEPER OR METAL                        TRUCKS EXITING SITE                                                                                                                                                                                                                                                                                                                             SURFACE CONCRETE




                                                                                                                                                                                                                                                                                                                                                       600mm MIN.
GRID 100mm HIGH AND                                                                                                                                                 WOVEN GEOTEXTILE
                                                                                                                                                                                                                                                                                                                                                                             SECTION DETAIL
SPACED AT 300mm CTS                            MIN LENG
                                                           TH 10m
                                                                               BERM 300 HIGH MIN
  CONSTRUCTION SITE
                                                                                                                                                               STAR PICKET                                                                                                STABILISE STOCKPILE SURFACE




                                                                                                                                                                                                                                                                                                                                     MIN. 1.5m
                                                                                                                                                               FITTED WITH                                          EARTH BANK                                                                                                                                                       20m MAX.
                                                                                      EXISTING ROADWAY                                                                                                                                                                  2:1
                                                                                                                                                               SAFETY CAP                                                                                     AX.)            SLO                                                                                                                  FLOW
                                                                                                                                                                                                                                                         E (M                       PE
                                                                                                                                                                                                                          FLOW                    S   LOP                                (MA
  GEOTEXTILE FABRIC                                                                                                  SANDBAGS                           WOVEN GEOTEXTILE                                                                    2:1                                             X.)                                                                STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                               MAX. 2.5m SPACINGS
                                                                                                                                                                   RUNOFF                                                                                                                                                                                      TYPICAL
                                               50-75mm GRAVEL BED                                                                                                  WATER WITH




                                                                                                                                        FLOW
                                               MIN 200mm THICK                                                                                                                                                                                                        SEDIMENT FENCE
                                                                                                                     WATERWAY                                      SEDIMENT
                 RUNOFF FROM PAD DIRECTED                                                                                                                                                                                                                                                                                                                                               PLAN
                 TO SEDIMENT TRAP                                                                                                                                                                                    STOCKPILE CONSTRUCTION NOTES:
                                                                                                                     EXCAVATION
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                                             FILTERED
                                                                                                                                                                                                                     1.      PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING
                                                                                                                                                                                                                             VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.
                                     SCALE: N.T.S.                                                                                                                                          WATER
                                                                                                                                                                  GEOTEXTILE
                                                                                                                     EARTH BANK                                   EMBEDDED 150mm                                     2.      CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                                                                                       DIRECTION
                                                                                                                                                                                                                                                                                                                                                                     DISTURBED                               1.5m STAR PICKETS
                                                                                                                                                                  INTO GROUND                                                                                                                                                                                        AREA                   OF FLOW          AT MAX. 2.5m
                                                                                                                                                                                                                     3.      WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                                                                                                CENTRES
                                                                                                                                                        FOR DROP INLETS AT NON-SAG POINTS,
                                                                                                                                                                                                                             THAN 2 METRES IN HEIGHT.
                                                                                                                                                        SANDBAGS, EARTH BANK OR EXCAVATION
                                                                                                                                                        USED TO CREATE ARTIFICIAL SAG POINT
                                                                                                                                                                                                                     4.      WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                  TIMBER SPACER                           KERB-SIDE                                                    GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                           FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO
                  TO SUIT                                 INLET                                                        1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.                                  LESS THAN 0.10.

                                                                                                                       2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                             5.      CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                                             STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                       3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS                                                                                                                                                                         UNDISTURBED
                                                                                                                            OR EARTH BANKS AS SHOWN IN THE DRAWING.                                                                                           STOCKPILES                                                                                             AREAS
                                                                                                                                                                                                                                                                     SCALE N.T.S
                                                      GRAVEL-FILLED WIRE                                               4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                      MESH OR GEOTEXTILE                                                    ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                      "SAUSAGE"
                              OVERFLOW         TIMBER SPACER
                                                                                                                                     GEOTEXTILE INLET FILTER A
  RUNOFF                                                                                                                                        SCALE N.T.S
  WATER WITH                                   TO SUIT
  SEDIMENT

                                                                                                                                                                                                                      GRADIENT OF
                                                                                                                                                                                                                      DRAIN 1% TO 5%                              CAN BE CONSTRUCTED              ALL BATTER
                                                                                                                                                                      WRAP FILTER                                                                                 WITH OR WITHOUT                                                     SEDIMENT FENCE CONSTRUCTION NOTES:
    SEDIMENT                                                                                                                                                                                                                                                                                      GRADES 2(H):1(V)
                                                                                                                                                                      CLOTH OVER GRATE                                                                            CHANNEL                         MAX.                                1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
      GRAVEL-FILLED WIRE                                 FILTERED WATER                                                                                                                                                   DIRECTION O
                                                                                                                                                                                                                                        F FLOW                                                                                            TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                                                  DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE




                                                                                                                                                                                                                                                                                                    300mm MIN.
      "SAUSAGE"                                                                                                                                                                                                                                                                                                                           CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                                                                                      CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                                                                                                                                                                                                               STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                                                                                                                     2m MIN




                                                                                                                                                                                                                            150mm MIN
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                                                                                                                                                                                                                                           2.         CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
                                                                                                                                                                                                                                        NOTE: ONLY TO BE USED AS TEMPORARY                                                                       THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.
                                                                                                                                                                                                                                        BANK WHERE MAXIMUM UPSLOPE LENGTH
                                                                                                                                                                                                                                        IS 80 METRES.                                                                                 3.         DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.
                                                                                                                                                                                                                      DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                        THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                                               WRAP FILTER
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                               RUNOFF                                                                                        1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                 FITTED WITH SAFETY CAPS.
                                                                                                                                               CLOTH OVER GRATE
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                              WATER WITH
           BLOCKS.                                                                                                      SEDIMENT                                                                                      2.       AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                        4.         FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                                                                                                                                                                                                                                                                                                                                                 ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                                        3.       ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                            WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                                                                                                                               IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                                                      GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                                        FILTERED
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                                                                                                                                                            SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                                                                         WATER
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                          4.       BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                                           CROSS-SECTIONS, NOT "V" SHAPED.                                                                        5.         JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.

                                                                                                                                                                                                                                                                                                                                      6.         BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                    MESH & GRAVEL INLET FILTER                                                                                GEOTEXTILE INLET FILTER TYPE B                                                          5.       ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                                                                                                                                                                                                                                                                 THOROUGHLY OVER THE GEOTEXTILE.
                                     SCALE N.T.S                                                                                                SCALE N.T.S
                                                                                                                                                                                                                      6.       COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                               CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                         SEDIMENT FENCE
                                                                                                                                                                                                                                                      DIVERSION DRAIN                                                                                                              SCALE: N.T.S.
                                                                                                                                                                                                                                                             SCALE N.T.S




                                                                                                                            CLIENT DETAILS:                                                      PROJECT ADDRESS:                                                      APPROVED BY:                                  PROJECT NAME:

                                                                                                                                                                                                                                                                                                                     6 WYANDRA STREET, NOOSA HEADS
                                                                                                                                           CAPITAL PRUDENTIAL                                                                                                                                                        TITLE:                                                            STATUS:

                                                                                                                                                                                                              6 WYANDRA STREET                                                                                       EROSION SEDIMENT                                                  FOR APPROVAL
       © ABN 89 647 469 707
                                                     B    28/10/2022 REISSUED FOR APPROVAL               MVP   BP    NW                                                                                          NOOSA HEADS                                                        NATHAN WAGSTAFF                  CONTROL DETAILS                                                   NOT FOR CONSTRUCTION
        75 NOOSA DRIVE                                                                                                                                                                                                                                                                 RPEQ: 20693
                                                     A    11/07/2022 ISSUED FOR OPW                      BP    NW    NW     SCALE:
     NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                               CPEng
         +61 7 5211 1003                           REV      DATE             DESCRIPTION                 DWN   CHK   APP
                                                                                                                                                        N.T.S.                                                                                                                       DATE: 28/10/2022
                                                                                                                                                                                                                                                                                                                     DRAWING NUMBER:                                                   PROJECT NUMBER:                      SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                             SIZE:
     RECORCONSULTING.COM                                                              REVISIONS
                                                                                                                                               DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                     C11                                                               20220078                              A1 B
Log in to download the original file

RFI - engineering response plans.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.