Skip to the record
Accept no substitutions.

Original source · versioned page text

Revised_DA Form 1

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (26.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

fee lney
Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

 

 

Number of parts created

 

 

 

 

 

 

12) Boundary realignment

 

12.1) What are the current. and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)

 

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment?

 

 

 
 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)

Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

      
    

  

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?

CO Road work C1 Stormwater ° C1 Water infrastructure
C1 Drainage work C1 Earthworks (1) Sewage infrastructure
O Landscaping C1 Signage O Clearing vegetation
LI Other — please specify: rOUIG Cvo SSover

14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
0 Yes - specify number of new lots:

] No

14.3) What is the monetary value of the proposed operational work? (include GST. materials and FevoelN

 
    

  
 

        
      
   
 
 
 
  

    
  

      
  

   
    
    
 
   

 

PART 4 —- ASSESSMENT MANAGER DETAILS

  

15) Identify the assessment manager(s) who will be assessing this development application

|}

16) Has the local government agreed to apply a superseded planning scheme for this development application?

LJ Yes — a copy of the decision notice is attached to this development application

OO The local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

LI No

    

      
    

Page 5
DA Form 1 — Development application details
Version 1.3— 28 September 2020
Log in to download the original file

Revised_DA Form 1.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.